Laserfiche WebLink
9/28/2020 City of Everett Page <br /> 6:42:56AM d o <br /> • <br /> INSPECTION ACTIVITY REPORT <br /> 11/15/2019 11/15/2019 BLDG DWF PARTIALAPPR eTRAKiT Inspection 11/14/2019 1:07 PM AMERICAN HOME <br /> 09-DRYWALL Request BUILDERS INC <br /> Contact Name:AMERICAN HOME <br /> BUILDERS INC <br /> Site Address:3214 BROADWAY <br /> Phone:4256471826 <br /> e-Mail:jhetricltacg.com <br /> (11/152019 10:51 AM DWF) <br /> 6th and 5th floor corridor ceilings only,2 <br /> layers of drywall with offset installed-ok to <br /> cover <br /> 11/19/2019 11/19/2019 BLDG DWF NOT READY eTRAKiT Inspection 11/1820193:41 PM AMERICAN HOME <br /> 11-INSULATION Request BUILDERS INC <br /> Contact Name:AMERICAN HOME <br /> BUILDERS INC <br /> Site Address:3214 BROADWAY <br /> Phone:4256471826 <br /> e-Mail:jhetrick@acg.com <br /> 11/19/2019 11/19/2019 BLDG DWF PARTIALAPPR eTRAKiT Inspection 11/18/2019 3:40 PM AMERICAN HOME <br /> 08-FRAMING Request BUILDERS INC <br /> Contact Name:AMERICAN HOME <br /> BUILDERS INC <br /> Site Address:3214 BROADWAY <br /> Phone:4256471826 <br /> e-Mail:jhetrick@acg.com <br /> (11/192019 11:26 AM DWF) <br /> 3rd and 4th floor corridor ceilings only. <br /> Ok to sheetrock. <br /> 11/25/2019 11/25/2019 BLDG DWF eTRAKIT Inspection 11/22/2019 11:43 AMAMERICAN HOME <br /> 09-DRYWALL Request BUILDERS INC <br /> Channel install <br /> Contact Name:AMERICAN HOME <br /> BUILDERS INC <br /> Site Address:3214 BROADWAY <br /> Phone:4256471826 <br /> e-Mail:jhetrickt acg.com <br /> (11/25/2019 3:24 PM DWF) <br /> 7th and 6th floor trash rooms only ok to <br /> cover. <br /> 6th and 4th floor corridor ceilings only,2 <br /> layers installed with offset,ok to continue. <br /> 11/25/2019 11/25/2019 BLDG DWF PARTIALAPPR 11/21/2019 3:46 PM AMERICAN HOME <br /> 08-FRAMING BUILDERS INC <br /> unit framing <br /> Contact Name:AMERICAN HOME <br /> BUILDERS INC <br /> Site Address:3214 BROADWAY <br /> Phone:4256471826 <br /> e-Mail:jhetrick@acg.com <br /> (11252019 3:21 PM DWF) <br /> 7th floor units 728 to 713 only. <br /> Subject to contractor completing fire <br /> caulking at Electrical panel,main feeding <br /> and wall cadet heater need to be fire <br /> caulked at electrical wire in drywall box. <br /> Fire caulkinng around exhaust ducting pipe <br /> at 7 and 6th floors,trash rooms only. <br /> 6th and 4th corridor ceiling 2 layers with <br /> offset, <br /> ok to continue. <br /> INSPI2 C,RwSYSTEMS <br />