Laserfiche WebLink
9/28/2020 Page 12 <br /> City of Everett <br /> 6:42:56AM �l yj <br /> • INSPECTION ACTIVITY REPORT d <br /> • <br /> 1/15/2020 1/15/2020 BLDG DWF PARTIALAPPR 1/142020 5:08 PM AMERICAN HOME <br /> 08-FRAMING BUILDERS INC <br /> Units 501-509 <br /> Contact Name:Trevor Berring <br /> Site Address:5108 West View Dr. <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> (1/152020 2:28 PM DWF) <br /> 509-501 Framing/fire protection- ok to <br /> cover. <br /> 1/16/2020 1/16/2020 BLDG DWF PARTIAL APPR 1/1520207:59 PM AMERICAN HOME <br /> II-INSULATION BUILDERS INC <br /> Fire caulking in dropped soffits level 6 <br /> units 516-501 fire caulking <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> (1/16/2020 10:56 AM DWF) <br /> Soffit chases,fire protection in units only <br /> 601>616. <br /> *615 was inspected on pervious inspection <br /> Also-Trash chute 3 sides,fire taping <br /> completed,ok to install metal chute. <br /> Floors 7th >1st floor. <br /> 1/16/2020 1/16/2020 BLDG DWF CORRECTION eTRAKiT Inspection 1/1520208:03 PM AMERICAN HOME <br /> 08-FRAMING Request BUILDERS INC <br /> L6 mechanical shaft cover inspection. <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> (1/16/2020 10:58 AM DWF) <br /> Not ready,need to complete fire caulking at <br /> all penetrations -/wall/ceiling/floors. <br /> 1/21/2020 1/21/2020 BLDG DWF PARTIALAPPR Levels <br /> I1-INSULATION Trevor:425-324-1819 <br /> (1/21/2020 12:48 PM DWF) <br /> Insulation on 5th floor,approved subject to <br /> completing void area in unit 505 outside <br /> wall then ok to cover. <br /> 1/22/2020 1/22/2020 BLDG DWF CORRECTION 6th floor corrridor 1/21/2020 4:20 PM AMERICAN HOME <br /> 09-DRYWALL ceiling BUILDERS INC <br /> Fire caulking corridor Level <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253245181 <br /> e-Mail:tberring@acg.com <br /> (1222020 2:47 PM DWF) <br /> 6th floor - correction need to complete the <br /> fire protection at elevator lobby chase walls, <br /> -two holes to be filled. <br /> Also,South stairwell,2 layers of 5/8" <br /> drywall with offset installed,ok to cover. <br /> INSP12 CRWSYST€MS <br />