Laserfiche WebLink
9/28/2020 Page j�\ <br /> City of Everett <br /> 6:42:56AM <br /> INSPECTION ACTIVITY REPORT <br /> 8/4/2020 8/4/2020 BLDG 15-FINAL BDGI RESCHEDULE eTRAKiT Inspection 8/3/2020 5:15 PM AMERICAN HOME <br /> Request BUILDERS INC <br /> Final inspection L7 corridor,L7 trash room <br /> and idf room. <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> 8/6/2020 8/6/2020 BLDG 15-FINAL KMK OTHER contractor will 8/5/2020 3:17 PM AMERICAN HOME <br /> reschedule BUILDERS MC <br /> Level 6 units,corridor,trash room and IDF <br /> room <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> 8/6/2020 8/6/2020 BLDG 15-FINAL KMK OTHER contractor will 8/5/2020 3:16 PM AMERICAN HOME <br /> reschedule BUILDERS INC <br /> Level 7 corridor,trash room and IDF <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> 8/12/2020 8/12/2020 BLDG 15-FINAL KMK CORRECTION see notes 8/11/2020 3:06 PM AMERICAN HOME <br /> BUILDERS INC <br /> Level 7 corridor,trash room and IDF.Level <br /> 6 units,corridor,trash room and IDE.Level <br /> 5 units,corridor,trash room and IDF. <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> (8/12/2020 3:28 PM KMK) <br /> Level 6 and 7 <br /> Fire caulk through penetrations in trash <br /> rooms and IDF rooms. <br /> 8/17/2020 8/17/2020 BLDG 15-FINAL KMK PARTIAL APPR lobby area ceilings 8/16/2020 7:21 PM AMERICAN HOME <br /> as noted BUILDERS INC <br /> Level 7 corridor,level 6 corridor and units <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> (8/17/2020 3:05 PM KMK) <br /> OK to cover lobby area ceilings as noted: <br /> OBTAIN ALL REQUIRED PERMITS AND <br /> INSPECTION APPROVALS BEFORE <br /> COVER <br /> 8/18/2020 8/18/2020 BLDG KMK PARTIAL APPR IDF rooms fire 8/16/20207:23 PMAMERICAN HOME <br /> 11-INSULATION caulked all levels BUILDERS INC <br /> Lobby ceiling cover inspection <br /> Contact Name:Trevor Bening <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tberring@acg.com <br /> 8/25/2020 8/25/2020 BLDG KMK PARTIAL APPR 2 hr shaft for DAS 8/242020 3:19 PM AMERICAN HOME <br /> 09-DRYWALL see notes BUILDERS INC <br /> Inspect 2 hour shaft that houses the DAS <br /> system <br /> Contact Name:Trevor Berring <br /> Site Address:3214 Broadway Everett <br /> Phone:4253241819 <br /> e-Mail:tbening@acgcom <br /> (8/252020 2:32 PM KMK) <br /> L-1:Shaft in progress. <br /> INSP12 CR14VSYST[MS <br />