Laserfiche WebLink
Earth solutions NW,LLC BORING NUMBER 8-2 <br /> (atilt 2881152nd Avenue N.E. <br /> tiu I IJ I Io 12 Redmond,WA 98052 PAGE 1 OF 1 <br /> s - 404',.: Telephone: 4252843300 <br /> Fax 4252842855 <br /> CLIENT Thorsen Family LLC PROJECT NAME Proposed Mufti-Family Residential Development <br /> PROJECT NUMBER 0599 - PROJECT LOCATION Everett,Washington <br /> DATE STARTED 9/7/06 COMPLETED 9/7/06 GROUND ELEVATION HOLE SIZE <br /> 1. DRILLING CONTRACTOR Boretec GROUNDWATER LEVELS: <br /> DRILLING METHOD HSA AT TIME OF DRILLING — <br /> LOGGED BY MWM CHECKED BY. MWM AT END OF DRILLING — <br /> NOTES Lawn-grass AFTER DRILLING —a. <br /> t-W K 3 i2a V• U <br /> =c7 <br /> 0.e HI0 OJ 0< TESTS y O MATERIAL DESCRIPTION <br /> i Z U mUZ, <br /> I W <br /> V! K <br /> 0 <br /> Gray silty SAND,very dense,moist <br /> - - <br /> 5 <br /> SS 100 50 MC=7.00% <br /> _ - <br /> - - SM <br /> 10 <br /> >1 SS 0 50 • -no recovery <br /> •:: <br /> - - <br /> - - <br /> - - <br /> 0 <br /> m 15 <br /> • <br /> SS 100 50 MC=10.00% <br /> W <br /> Boring terminated at 18.0 feet below existing grade due to blockage.No <br /> groundwater encountered during drilling.Boring backfilled with bentonite. <br /> Bottom of hole at 18.0 feet <br /> W <br /> L7 <br />