Laserfiche WebLink
0 • <br /> PUBLIC WORK <br /> Item Unit Quantity Unit Price Amount <br /> Construction Storm Drainage <br /> TemporarySilt'Fenoe r L.F. 5.00 <br /> 'Acting-for drainage swales L.F. 2.00 <br /> 0 <br /> Other s Pick-ELF: cov, Cacti 9 c1S• °a 200.o <br /> Other <br /> Construction Storm Drainage Total S aO0.4° <br /> Clearing&Grading <br /> 12"wide area L.F. l I 2.50 <br /> Right-of-Way ; L.F. 12.00 <br /> Total grading/cut/fill C.Y. See EMC <br /> f <br /> (total earth moved) S ,U.. -1 13.80.010 <br /> Clearing and Grading Total: $ <br /> COST EST FEE CNC•2017 r/j 0 <br />