My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:50:44 AM
Creation date
12/18/2020 3:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
737
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR 7: Flow Control <br /> Flow control is provided in accordance with public works policy#2-11. This policy <br /> requires matching the existing conditions runoff rate. The modeling shows that 100' of <br /> equivalent length 3' diameter pipe is sufficient for this task. Three 60"manholes are <br /> shown on the plans,the equivalent volume is used to reduce the 100' that is shown in the <br /> modeling. <br /> MR 8: Wetlands Protection <br /> There are no wetlands on or in the vicinity of the project site. The site is located in a <br /> developed urban area. <br /> MR 9: Operation and Maintenance <br /> The building's maintenance staff will be charged with monitoring the function of the on- <br /> site drainage facilities. If the final drainage design includes elements for which the <br /> Department of Ecology has identified maintenance guidelines, an Operations& <br /> Maintenance Manual is placed in Appendix E. <br /> 1 <br /> I <br /> 1 <br /> I <br /> 1 <br /> p <br /> I <br /> I <br /> Hopeworks II DCI Engineers Page 6 <br /> Storm Drainage Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.