My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
Geotech Report
>
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:37:08 PM
Creation date
12/21/2020 10:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Year
2017
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HopeWorks Social Enterprises JN 17298 <br /> July 12, 2017 Page 16 <br /> The allowable thickness of the fill lift will depend on the material type selected, the compaction <br /> equipment used, and the number of passes made to compact the lift. The loose lift thickness <br /> should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not <br /> sufficiently compacted, it can be re-compacted before another lift is placed. This eliminates the <br /> need to remove the fill to achieve the required compaction. The following table presents <br /> recommended relative compactions for structural fill: <br /> LOCATION OF FILL, MINIMUM RELATIVE <br /> PLACEMENT COMPACTION <br /> Beneath slabs or 95% <br /> walkwa s <br /> Filled slopes and behind 90% <br /> retainin• walls <br /> 95%for upper 12 inches of <br /> Beneath pavements subgrade; 90% below that <br /> level <br /> Where: Minimum Relative Compaction is the ratio,expressed in <br /> percentages,of the compacted dry density to the maximum dry <br /> density, as determined in accordance with ASTM Test <br /> Designation D 1557-91 (Modified Proctor). <br /> The General section should be reviewed for considerations related to the reuse of on-site soils. <br /> Structural fill that will be placed in wet weather should consist of a coarse, granular soil with a <br /> silt or clay content of no more than 5 percent. The percentage of particles passing the No. 200 <br /> sieve should be measured from that portion of soil passing the three-quarter-inch sieve. <br /> LIMITATIONS <br /> The conclusions and recommendations contained in this report are based on site conditions as <br /> they existed at the time of our exploration and assume that the soil and groundwater conditions <br /> encountered in the test borings are representative of subsurface conditions on the site. If the <br /> subsurface conditions encountered during construction are significantly different from those <br /> observed in our explorations, we should be advised at once so that we can review these conditions <br /> and reconsider our recommendations where necessary. Unanticipated conditions are commonly <br /> encountered on construction sites and cannot be fully anticipated by merely taking samples in test <br /> borings. Subsurface conditions can also vary between exploration locations. Such unexpected <br /> conditions frequently require making additional expenditures to attain a properly constructed <br /> project. It is recommended that the owner consider providing a contingency fund to accommodate <br /> such potential extra costs and risks. This is a standard recommendation for all projects. <br /> This report has been prepared for the exclusive use of HopeWorks Social Enterprises and its <br /> representatives, for specific application to this project and site. Our conclusions and <br /> recommendations are professional opinions derived in accordance with our understanding of <br /> current local standards of practice, and within the scope of our services. No warranty is expressed <br /> or implied. The scope of our services does not include services related to construction safety <br /> precautions, and our recommendations are not intended to direct the contractor's methods, <br /> techniques, sequences, or procedures, except as specifically described in our report for <br /> consideration in design. Our services also do not include assessing or minimizing the potential for <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.