My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
Geotech Report
>
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:37:08 PM
Creation date
12/21/2020 10:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Year
2017
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTJ3CH 24Q11Qt' Ave <br /> 1,) �L Seattle,WashittOton 98102 <br /> CONSULTANTS, INC, (425)747-5618 <br /> July 12, 2017 <br /> JN 17298 <br /> HopeWorks Social Enterprises <br /> 3331 Broadway Avenue <br /> Everett, Washington 98201 <br /> Attention: Ed Petersen <br /> via email: ed@hopewrks.org <br /> Subject: Transmittal Letter— Geotechnical Engineering Study <br /> Proposed Building <br /> 3319 Broadway Avenue <br /> Everett, Washington <br /> Dear Mr. Petersen <br /> We are pleased to present this geotechnical engineering report for the proposed building to be <br /> constructed in Everett, Washington. The scope of our services consisted of exploring site surface <br /> and subsurface conditions, and then developing this report to provide recommendations for general <br /> earthwork and design criteria for foundations, retaining walls, and temporary shoring. This work <br /> was authorized by your acceptance of our proposal, P-9579, dated May 15, 2017. <br /> The attached report contains a discussion of the study and our recommendations. Please contact <br /> us if there are any questions regarding this report, or for further assistance during the design and <br /> construction phases of this project. <br /> Respectfully submitted, <br /> GEOT ONS ANTS, INC. <br /> D. obert Ward, P.E. <br /> Principal <br /> cc: Beacon Development—Matthew Flickinger <br /> via email:matthewf@beacondevgroup.com <br /> ASM/DRW:mw <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.