My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
Geotech Report
>
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:37:08 PM
Creation date
12/21/2020 10:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Year
2017
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
alp' <br /> o.°oo o°• 'Oour,000•°oo..°oo °c poo.°� oo .°:2 °o• °•°oo pD° <br /> Unsuitable °° °o°:o ° °, 3 ° , • Structural Fill (refer to report for <br /> Soils .o w� v • D • gradation and compaction requirements). <br /> ^00°•°�—^ ^ 4)•o °oo °• <br /> p°,°` °o°. See Note 2 for condition where lean <br /> ' OG 0 0 of Co a 0 "°:O� 0 c W L")•o °°.pd a 0 "°:OC 0'o .(12, 0 c <br /> o °° ° q °° Q 0 o °' 0° ° o °°° °' Q ° concrete is used to backfill the <br /> •o 'o' •� •o b° •°. <br /> ,'. . o ° ° o °'. . o ° O o ,. .°�o , ° . o °: .0) overexcavation. <br /> o,°0• °e000�°o°Width of Overexcavation°oo.o %0 <br /> o'° ".� 00 ° °o 0 0 <br /> =.I1I-imi Ili iii,=fill=ii i 1��Iiii iui,II ini'lllin l mi Ilfl i 1,I'I iii liii,ni fill nn IIII�I f�n_in�III!H r <br /> Suitable Bearing Soil (Refer to report for description) <br /> verify by Geotechnical Engineer prior to placing Structural <br /> Fill. <br /> Width of Overexcavation = Footing Width (FW) + Depth of Overexcavation <br /> NOTES: <br /> 1. Refer to report text for additional overexcavation, foundation, and structural fill considerations. <br /> 2. Where lean concrete(minimum 1-1/2 sacks of cement per cubic yard) is used to backfill the <br /> overexcavation, the overexcavation must extend only 6 inches beyond the edges of the footing. <br /> TYPICAL FOOTING OVEREXCAVATION <br /> y °= GEOTECH 3319 Broadway Avenue <br /> CONSULTANTS,INC. Everett, Washington <br /> i <br /> Job No: Date: <br /> �— Plate: <br /> 17298 July 2017 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.