My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
Geotech Report
>
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:37:08 PM
Creation date
12/21/2020 10:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Year
2017
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage composite \ Treated lagging <br /> Waterproofing �1k <br /> Foundation wall Soldier pile <br /> & Footing <br /> ad <br /> i <br /> w <br /> Slabs :.., <br /> Vapor retarder -- .,.,:�ri ti .3. = . ~ :... ^`=r <br /> Non-woven filter fabric y �` <br /> Washed rock or pea gravel 4', P . <br /> .tom t/I . ' <br /> 4 <br /> 4"perforated PVC drain <br /> (holes turned downward) <br /> 2" PVC weep pipe at 6'centers ` ., <br /> (Pour into footing or wall below slab) <br /> Attach weep pipe to drainage composite. <br /> Pierce waterproofing and plastic backing <br /> of drainage composite. ` <br /> AN <br /> Note-Refer to the report for additional considerations related to drainage and waterproofing. <br /> SHORING DRAIN DETAIL <br /> GEOTECH 3319 Broadway Avenue <br /> CONSULTANTS,INC. Everett, Washington <br /> i <br /> 1 • Job No: Date: <br /> �---�� --� Plate: <br /> 17298 July 2017 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.