Laserfiche WebLink
EXHIBIT B <br /> City of Everett Landfill Gas System O&M Support <br /> Herrera Environmental Consultants, Inc. <br /> 2020 Billing Rate Schedule <br /> All Inclusive <br /> Hourly Billing Rate <br /> Labor Category Minimum Maximum <br /> President,Executive Vice President,Vice President 241.76 293.52 <br /> Engineer VI/Scientist VI/Planner VI/GIS Analyst VI 223.07 266.16 <br /> Engineer V/Scientist V/Planner V/GIS Analyst V 148.71 262.37 <br /> Engineer IV/Scientist IV/Planner IV/Landscape Architect IV/CAD Technician IV/GIS Analyst IV 135.19 209.38 <br /> Engineer III/Scientist III/Planner III/Landscape Architect III/CAD Technician III/GIS Analyst III 119.41 168.57 <br /> Engineer II/Scientist II/Planner II/Landscape Designer II/CAD Technician II/GIS Analyst II 92.54 137.62 <br /> Engineer I/Scientist I/Planner I/Landscape Designer I/CAD Technician I/GIS Analyst I 45.63 112.60 <br /> Intern 50.70 70.98 <br /> Accounting Administrator I,II,III,IV,V 85.17 193.77 <br /> Project Accountant I,II,III,IV 77.74 126.27 <br /> Administrative Coordinator II,Ill, IV/Word Processor II,III 67.60 126.84 <br />