My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mackenzie Engineering Inc. 12/7/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Mackenzie Engineering Inc. 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:55 PM
Creation date
12/21/2020 12:42:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mackenzie Engineering Inc.
Approval Date
12/7/2020
Council Approval Date
12/2/2020
End Date
12/31/2021
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Design Services EMB PW Tenant Improvement
Tracking Number
0002598
Total Compensation
$325,700.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BCE Engineers,Inc. <br /> Principal $205 <br /> Senior Associate $175 <br /> Associate $155 <br /> Senior Engineer/Specialty Designer $140 <br /> Engineer/Senior Designer $125 <br /> Engineer Assistant/Designer $105 <br /> Revit Modeler/Drafter/CADTechnician $90 <br /> SpecTypist $80 <br /> The Greenbusch Group,Inc. <br /> Principal I $175 <br /> Principal II $215 <br /> Lead Acoustician $125 <br /> Acoustician I $115 <br /> Acoustician II $100 <br /> Acoustician Ill $75 <br /> Acoustical Intern $65 <br /> FEE SUMMARY <br /> Base Services <br /> Pre-Design I Programming $ 92,350 <br /> Schematic Design $140,500 <br /> Subtotal $232,850 <br /> Additional Services <br /> Acoustical Engineer $ 15,600 <br /> FF&E Procurement $ 14,650 <br /> Subtotal $ 30,250 <br /> Subtotals $263,100 <br /> Design Contingency $ 56,600 <br /> Reimbursables $ 10,000 <br /> TOTAL $325,700 <br /> DESIGN CONTINGENCY <br /> Additional Services that may be needed based upon issues that surface during the design and <br /> construction of the project as approved Only In Writing and signed by the authorized City <br /> representative. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.