My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1527 FLORIDA DR 2022-04-15
>
Address Records
>
FLORIDA DR
>
1527
>
1527 FLORIDA DR 2022-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 9:12:16 AM
Creation date
12/21/2020 1:41:54 PM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
1527
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWPPP NARRATIVE • t 6/13/2019 <br /> PAUL BUSTARD SHOR PLAT LOT 2 ( AGETF6 ) <br /> Element#4: Install Sediment Controls <br /> The outside edge of the entire short plat should have Silt Fence (BMP C233) installed for the current <br /> construction at downslopes. The silt fence should be left up until completion of the building <br /> construction for all lots. Transportation of sediment between lots will become the focus for the <br /> building construction portion of the project. Preventing any upstream sediment from impacting <br /> building footprints or any previously installed surfacing can employ Wattles (BMP C235) on upstream <br /> edges of any surfacing. <br /> Element#5: Stabilize Soils <br /> Soil stabilization will be satisfied with the following BMPS: <br /> Temporary and Permanent Seeding (BMP C120) Temporary seeding will be used on those areas <br /> disturbed but not completed or for areas brought to final grades that are not ready for the permanent <br /> seeding. The construction documents indicate a seeding mix. Permanent seeding will follow the <br /> requirements of the final planting plan and specifications. <br /> Mulching (BMP C121) (compost) Placed in support of the temporary seeding (BMP C120) and used as a <br /> temporary cover.The compost proposed can then be tilled into the surface in preparation of Permanent <br /> Seeding. <br /> Plastic Covering(BMP C123) Proposed for immediate stabilization of threatened areas and for stockpiles. <br /> Provide sand bags and rope to anchor plastic. <br /> Topsoiling (BMP C125) Stockpile topsoil for use in support of permanent vegetation according to <br /> specifications and BMP T5.13. <br /> Dust Control (BMP C140) Depending on weather conditions, surface protections such as mulching and <br /> surface watering will control the wind transport of sediment.Timing of this BMP is weather dependent <br /> throughout the construction process. <br /> Element#6: Protect Slopes <br /> New slopes within the project will be limited to a maximum of 3 horizontal to 1 vertical. There are no <br /> steep slopes on or near the site, and none will be created during building construction. <br /> Element#7: Protect Drain Inlets <br /> Storm Drain Inlet Projection (BMP C220) should currently be being employed for all nearby catch <br /> basins for the ongoing construction and will continue to be used throughout the building construction. <br /> Element#8: Stabilize Channels and Outlets <br /> No channels will be constructed as part of the work. <br /> Element#9: Control of Pollutants <br /> C:\Users\darianc\Desktop\CE\DOCS\Bustard SWPPP Lot 2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.