My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2020-12-23
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2020-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:17:36 AM
Creation date
12/23/2020 11:10:11 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICVORKS PERMIT <br /> ate 12/24/2018 <br /> Cityof Everett Permit Services Public Works Permit#: PW1812-055 <br /> EVERETT 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B1812-021 <br /> Everett, WA 98201 Planning Reference#: SEPA18-018 <br /> WASHINGTON 425-257-8810 Public Works Fee: $13,107.93 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BETHANY AT SILVER LAKE SHOESMITHJOHN !2 8 JUN 2019 <br /> PO BOX 5128 <br /> EVERETT,WA,98206 , <br /> PHONE: PHONE:2064534053 <br /> TAX PARCEL ID#:28052900204900 SITE ADDRESS: 2235 LAKE HEIGHTS DR <br /> DESCRIPTION:BETHANY AT SILVER LAKE-DRIVEWAY/ASPHALT/CLEARING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 06/25/2019.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services'Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8.On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br /> approval/close out of the permit. <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing Planning <br /> Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a fin ' ction online by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests when all items have been p'yk »r this permit. <br /> is <br /> Public Works Permit Fee Breakdown: ✓Gq, <br /> Driveway/Conc.Apron $45.00 Erosion Control $200.0 �, `w �� <br /> 0 f <br /> Grade/Fill/Excavate(1,000CY) $230.00 Paving(15,400SF) $77.00 .0�' �8 <br /> PW Plan Review $2,908.65 PW Site Inspection $5,817.30 i � 4 <br /> Stormwater System Development Fee $3829.98 ��e�G�, `9 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT*6 Tl• <br /> The undersigned owner/applicant hereby agrees t, +hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> G/ zoi I causes of action that may arise because of installation and maintenance of <br /> Approved for Construction (Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged the eby. <br /> — <br /> FINAL INSPECTION Date Zj <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.