My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2020-12-23
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2020-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:17:36 AM
Creation date
12/23/2020 11:10:11 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 <br /> D LI,- id viro-n <br /> MAY - 9 2019 <br /> CITY OF EVERETT <br /> Permit Services <br /> May 6,2019 <br /> Thad Newport <br /> City of Everett Engineering/Permit Services <br /> 3200 Cedar Street, 2nd Floor <br /> Everett,WA 98201 <br /> Project: The Bethany at Silver Lake, AHBL No. 2180406.10 <br /> Subject: Response to Comments dated 4/10/2019 <br /> Dear Mr. Newport: <br /> This letter is in response to your comments dated April 10, 2019, regarding the above <br /> referenced project. The comments are included below (verbatim)for your reference. Our <br /> responses are shown in bold after each comment. <br /> Stormwater Site Plan (Jane Zimmerman 425-257-8885) <br /> 1. In Section 2.0 of the SSP, in the 4th paragraph,the first sentence reads"[t]here are <br /> known historical flooding problems on the site." It appears this sentence is missing a <br /> "no" in front of"known"...? If not, more explanation is needed. <br /> Response: This sentence in the Report has been revised. <br /> 2. MR #2—Construction Stormwater Pollution Prevention: <br /> Coverage under Ecology's Construction Stormwater General Permit(CSWGP) is <br /> required because the project will disturb an acre or more of land. Additional information <br /> can be found at the following link: <br /> https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater-qeneral- <br /> pe rmits/Construction-sto rmwate r-permit <br /> Response: This has been completed. A copy of the coverage letter is included <br /> with the resubmittal.The Permit Number is: WAR307839. <br /> 3. MR #3—Source Control: <br /> The section of the Stormwater Site Plan covering MR#3 needs to be expanded. <br /> Operational and structural BMPs must be selected per Chapter 2 of Volume IV of the <br /> SWMM, detailed in the drainage report, and shown on the plans as appropriate. All <br /> BMPs noted as"applicable", including operational, good housekeeping and preventative <br /> maintenance BMPs presented in Chapter 2, are required in the City of Everett per the <br />
The URL can be used to link to this page
Your browser does not support the video tag.