My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2020-12-23
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2020-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:17:36 AM
Creation date
12/23/2020 11:10:11 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br /> May 31, 2019 <br /> Thad Newport <br /> City of Everett Engineering/Permit Services <br /> 3200 Cedar Street, 2nd Floor <br /> Everett, WA 98201 <br /> Project: The Bethany at Silver Lake, AHBL No. 2180406.10 <br /> Subject: Response to Comments dated 5/30/2019 <br /> Dear Mr. Newport: <br /> This letter is in response to your comments dated May 30, 2019, regarding the above <br /> referenced project. The comments are included below(verbatim)for your reference. Our <br /> responses are shown in bold after each comment. <br /> 1. In Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> a. Transmittal Sheet: (1) available at the Permit Counter(and included herein for <br /> your use upon resubmittal). <br /> b. Plans: (2) full size sets of revised plans. <br /> c. Drainage Report: (2) copies of revised report. <br /> d. SWPPP Report: (2) copies of revised SWPPP report. <br /> e. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form <br /> filled out for the City to use to calculate the Public Works Permit Fee. <br /> Response: These requested items are all included with this re-submittal. The <br /> Drainage Report and SWPPP remain unchanged from the previous re-submittal <br /> because there are no review comments that affect these documents. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you <br /> have any questions regarding these comments, please contact Jane Zimmerman with <br /> the City of Everett Surface Water Department(425-257-8885 or JaneZ@everettwa.gov). <br /> a. The 8" outlets from the two northern bioretention facilities"T" into nearby storm <br /> drains. Per Section 4-2.3(4)of the DCSS, the outlets from the bioretention <br /> facilities must connect into a catch basin. <br /> Response: Two catch basins have been added to the drawings at the points <br /> where the outlet pipes from the bioretention facilities connect to the storm <br /> drainage system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.