Laserfiche WebLink
1 <br /> i <br /> 1 <br /> 1 <br /> ' Construction Stormwater <br /> Pollution Prevention Plan <br /> ' PREPARED FOR: <br /> ' Bethany of the Northwest <br /> c/o Mr. Matthew Todd <br /> PO Box 13700 <br /> ' Mill Creek, WA 98208 <br /> 12f19(2D1, <br /> QV WASW>AP <br /> PROJECT. <br /> � The Bethany at Silver Lake <br /> 2235 Lake Heights Drive <br /> At <br /> :w Everett, WA 98208 <br /> 1Olv 4tC �4,30 <br /> 2180406.10 <br /> 'Joni <br /> b <br /> PREPARED BY: <br /> Trevor McDonald, EIT <br /> I hereby state that this Construction Project Engineer <br /> ' Stormwater Pollution Prevention Plan for <br /> The Bethany at Silver Lake project has <br /> been prepared by me or under my REVIEWED BY: <br /> supervision, and meets the standard of <br /> care and expertise that is usual and Lucas Johnson, PE, LEED AP <br /> customary in this community for er Project Manager <br /> professional engineers. I understand g <br /> ' that the City of Everett does not and will <br /> not assume liability for the sufficiency, DATE: <br /> suitability, or performance of drainage <br /> facilities prepared by me. <br /> December 2018 <br /> i <br /> i <br />