Laserfiche WebLink
f <br /> fThe Bethany at Silver Lake <br /> Stormwater Pollution Prevention Plan <br /> fInspection and Maintenance Report Form <br /> To be completed every 7 days and within 24 hours of a rainfall event of 0.5 inches or more <br /> Inspector: Date: <br /> Inspector's Qualifications: <br /> I <br /> Days since last rainfall: Amount of last rainfall: inches <br /> f <br /> Stabilization Measures <br /> Drainage Area Date Since Date of Next Stabilized Stabilized With Condition <br /> Last Disturbance (yes/No) <br /> Disturbance <br /> IStabilization required: <br /> f <br /> I <br /> To be performed by: On or before: <br /> f <br /> f <br /> 1 <br /> IConstruction Storrnwater Pollution Prevention Plan <br /> The Bethany at Silver Lake Exhibit 1—1 CHIOS <br /> 2180406.10 <br />