My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2020-12-23
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2020-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:17:36 AM
Creation date
12/23/2020 11:10:11 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> . Hydro-demolition <br /> . Bridge and road surfacing <br /> Design and Installation Specifications <br /> . Vacuum slurry and cuttings during cutting and surfacing operations. 1 <br /> . Slurry and cuttings shall not remain on permanent concrete or asphalt pavement <br /> overnight. <br /> . Slurry and cuttings shall not drain to any natural or constructed drainage con- <br /> veyance <br /> including stormwater systems. This may require temporarily blocking <br /> catch basins. <br /> . Dispose of collected slurry and cuttings in a manner that does not violate ground <br /> water or surface water quality standards. I <br /> . Do not allow process water generated during hydro-demolition, surface rough- <br /> ening or similar operations to drain to any natural or constructed drainage con- <br /> veyance including stormwater systems. Dispose process water in a manner that <br /> does not violate ground water or surface water quality standards. <br /> . Handle and dispose cleaning waste material and demolition debris in a manner i <br /> that does not cause contamination of water. Dispose of sweeping material from a <br /> pick-up sweeper at an appropriate disposal site. 1 <br /> Maintenance Standards <br /> Continually monitor operations to determine whether slurry, cuttings, or process water ' <br /> could enter waters of the state. If inspections show that a violation of water quality stand- <br /> ards could occur, stop operations and immediately implement preventive measures such <br /> as berms, barriers, secondary containment, and vacuum trucks. <br /> BMP 3: Material Delivery, Storage and i t I <br /> Purpose <br /> Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or 1 <br /> watercourses from material delivery and storage. Minimize the storage of hazardous <br /> materials on-site, store materials in a designated area, and install secondary con- ' <br /> tainment. <br /> Conditions of Use ' <br /> These procedures are suitable for use at all construction sites with delivery and <br /> storage of the following materials: <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume II- Chapter 4 -Page 315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.