Laserfiche WebLink
1 <br /> BMP C160: CertifiedErosion and nt Control Lead <br /> Purpose <br /> The project proponent designates at least one person as the responsible representative <br /> in charge of erosion and sediment control (ESC), and water quality protection. The des- <br /> ignated person shall be the Certified Erosion and Sediment Control Lead (CESCL)who <br /> is responsible for ensuring compliance with all local, state, and federal erosion and sed- <br /> iment control and water quality requirements. <br /> Conditions of Use <br /> A CESCL shall be made available on projects one acre or larger that discharge storm- <br /> water to surface waters of the state. Sites less than one acre may have a person without <br /> I CESCL certification conduct inspections; sampling is not required on sites that disturb <br /> less than an acre. <br /> . The CESCL shall: <br /> . Have a current certificate proving attendance in an erosion and sediment con- <br /> trol training course that meets the minimum ESC training and certification <br /> requirements established by Ecology (see details below). <br /> Ecology will maintain a list of ESC training and certification providers at: <br /> http://www.ecy.wa.gov/programs/wq/stormwatericescl.html <br /> OR <br /> Be a Certified Professional in Erosion and Sediment Control (CPESC); for <br /> additional information go to: http://www.envirocertintl.org/cpesc/ <br /> Specifications <br /> . Certification shall remain valid for three years. <br /> . The CESCL shall have authority to act on behalf of the contractor or developer and <br /> shall be available, or on-call, 24 hours per day throughout the period of con- <br /> struction. <br /> . The Construction SWPPP shall include the name, telephone number,fax number, <br /> ' and address of the designated CESCL. <br /> • A CESCL may provide inspection and compliance services for multiple con- <br /> struction projects in the same geographic region. <br /> Duties and responsibilities of the CESCL shall include, but are not limited to the fol- <br /> lowing: <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume Il- Chapter 4 -Page 325 <br />