Laserfiche WebLink
i <br /> \ . <br /> PUBLIC WORKS ?ERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooflop downspouls lo the drainage syslem provided for this lot. <br /> 8. Rooftop runoff must be discharged lo a roof downspout infiltration system per City of Everetl Storm <br /> Manuat 3-2.6.2. The approximale size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> / 9.1 The contractor must meet with the Public Works Inspector to discuss polential drainage routing prior to <br /> �� beginning the project. <br /> 10. Install erosion controi measures as determined by the Pubtic Works inspector, such as silt(ence, siraw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12� Remove erosion conlrol measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permilted sile. No wasling of material is aliowed on this building bt. <br /> �'-'� <br /> 1� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building malerials to be stacked on sidewalks and sidewalks to be Y,ept clean and open for <br /> pedestrian travel. <br /> 1 G. Adjust water meter box 1"above sidewalk grade. <br /> f� <br /> 17. ; Remove and replace curb, c�utter and sidewalk as per Cily of Everelt Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by lhe Public Works Inspector(i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 18. Install a Type I concrete driveway per City o(Everett Standard#307. <br /> 19. Pave driveway from lhe front property line out to lhe slreet paving. <br /> 20. Contact the Waler Dislrict for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per Cily Standard Plan�/402 wilh a gas trap per Standard Plan#410 is required(or the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravily ilow across the public right-of-way. <br /> 23. A sprinkler system is required for ihis building in compliance with lhe requirements of NFDA Standards <br /> 13D. <br /> � <br /> PI'ICemmenf5 ' y��.1 <br />