Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 12/22/2020 13:42 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 9/3/2020 <br /> Fund 401 Accounts Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 8810 EMERSON PL UT3473-20-3 <br /> Work Order No 20201660 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 9/3/2020 Time 11:26 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WS1885E059 WASRVC YES 9/30/2020 <br /> Address 8810 EMERSON PL <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 8810 EMERSON PL <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 77.161 10/05/2020 PM <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.785 10/05/2020 PM <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 4.241 10/05/2020 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA 1 211.398 10/05/2020 PM <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.431 10/05/2020 PM <br /> M SETT34146547 SETTER COPPER 5/8 X 3/4 HEIGHT 9"NO LEG LENGTH HI/HO 1 123.222 10/05/2020 PM <br /> Total Material Cost $42 .24 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> oN liaued 0z0z/0s/6 pe eldwo0 a;ea <br /> (N/A)uolteu/io4ul}soD got- auall I I atea�le�S <br /> J 1JINVG 11aI213r Aar A9 panoJddy <br /> uol;od pepuemwooeN <br />