Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 12/22/2020 13:46 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/3/2020 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 20 3 <br /> Title CONVERT.75 INCH 8908 EMERSON PL UT3473-20-3 <br /> Work Order No 20201664 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 9/3/2020 Time 13:12 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1885M054 WASRVC YES 9/30/2020 <br /> Address 8908 EMERSON PL <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 8908 EMERSON PL <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 17.118 10/05/2020 PAP <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 3 52.209 10/05/2020 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA 1 211.398 10/05/2020 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .984 10/05/2020 PAP <br /> Total Material CostCr—S-2;71.771Th <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .5 12.81 10/05/2020 <br /> NA N/A TOPSOIL .25 7.405 10/05/2020 <br /> NA N/A TRACING WIRE 3 .6 10/05/2020 <br /> NA N/A WIRE CLAMP 1 1.62 10/05/2020 <br /> Total NA Cost $22.44 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> oN;!WJad OZOZ/OE/6 paleldwo0 a;ea Oua!! / / a}ea}JejS <br />