My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9009 W MALL DR CLUBHOUSE 2021-09-07
>
Address Records
>
W MALL DR
>
9009
>
CLUBHOUSE
>
9009 W MALL DR CLUBHOUSE 2021-09-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 2:35:56 PM
Creation date
12/31/2020 2:57:48 PM
Metadata
Fields
Template:
Address Document
Street Name
W MALL DR
Street Number
9009
Tenant Name
CLUBHOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SHUGART <br /> WASSE <br /> WICKWIRE <br /> architecture&interiors <br /> March 26,2020 ri VLE <br /> Drew Martin <br /> City of Everett—Permit Services APR 0 2 2020 <br /> 3200 Cedar Street _ <br /> Everett,WA 98201 CITY OF EVE ET T <br /> Permit Services <br /> Re: Plan check Number: B2003-009 R1 <br /> Address:9009 W Mall Drive <br /> Drew, <br /> We have reviewed and made corrections to the construction document in accordance with your comments dated <br /> March 17,2020. Refer to the attached response letter from CT for structural items. <br /> General: <br /> 1. Noted,the code list has been revised on Sheet G01 <br /> 2. A scope statement with the applicable IEBC sections has been added to the project description on Sheet <br /> G01. <br /> 3. Construction type has been revised to VB,see Sheet GO1 <br /> Accessibility: <br /> 4. Refer to the scope statement on Sheet G01.All altered areas will be fully accessible,and an accessible <br /> shower facility has been added,see plans.The building has an existing accessible route from the existing <br /> accessible parking stalls meeting ANSI/ICC A117.1—2009. <br /> 5. The ANSI water closet details have been revised.See Sheet CS01. <br /> 6. The new partitions in both toilet rooms will meet ANSI/ICC A117.1—2009 guidelines.See plan Sheet <br /> A201. <br /> 7. Door 113 has been revised to a 72"double leaf door within a larger existing opening. <br /> Energy: <br /> 8. Max. U-Factor has been added the window schedule,see Sheet G02. <br /> Please let me know if you have any further questions or need more information. <br /> Sincerely, <br /> ry we" <br /> Matthew I.Wasse <br /> Principal <br /> Direct:206,405.2539 <br /> Studio: 206. 264.7744 <br /> sww-ai,com <br /> l �o <br /> 18 Dravus Street #100 Seattle, WA 98109 P: 206.264.7744 sww-ai.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.