Laserfiche WebLink
U <br />Revisions <br />01.00 2020-02-19 <br />PERMIT SUBMITTAL <br />4333 REGI ERED <br />\I ' A WH T <br />YIN KEN K. CHIN <br />STAT OF WASHINGTON <br />EXP: 2020.06-14 <br />r. <br />NOTES <br />1. DETAIL SIMILAR FOR OTHER PENETRATIO S <br />THROUGH SLOPED ROOF Jr— <br />U ="I:. <br />C <br />�JLk <br />n <br />U <br />0 <br />1. CUT AND REMOVE SHINGLES <br />DOWNSLOPE OF PIPE PENETRATION. <br />2. INSTALL PRE —FORMED FLANGE OVER <br />PIPE. TUCK UNDER TOP COURSE OF <br />SHINGLES. <br />FLANGE <br />SEALANT <br />NEW SHINGLES <br />3. INSTALL NEW SHINGLES. TRIM AS <br />REQUIRED AT PIPE PENETRATION. <br />TUCK UNDER FLANGE. <br />2 <br />PAA <br />MORRISON HERSHFIELD <br />SHORESIDE CONDOMINIUMS <br />ROOF REHAB <br />2001 120TH PL SE, EVERETT WA 98208 <br />Project # 180295600 <br />SEAL SHINGLES COVERING FLANGE TO <br />FLANGE WITH SEALANT. <br />Scale <br />PLUMBING STACK <br />INSTALLATION ISOMETRIC <br />N.T.S. <br />DWG No. Version Date <br />BE.532A 1 01.00 1 2020-05-08 <br />© 2018 MORRISON HERSHFIELD - These documents have been prepared specifically for this project. They are not suitable for use on other projects or in other <br />locations without approval and participation of MORRISON HERSHFIELD. <br />