Laserfiche WebLink
Y <br />N <br />C <br />O <br />G <br />f6 <br />0 <br />0 <br />0 <br />�I <br />Q <br />M_ <br />O_ <br />O <br />N <br />O <br />N <br />O <br />m <br />C <br />'O <br />m <br />CD <br />N <br />w <br />9 <br />d <br />z <br />zi <br />m <br />c <br />3 <br />ca <br />2 <br />t <br />a <br />0 <br />N <br />N <br />0 <br />0 <br />cc <br />m <br />71 <br />ZD <br />A <br />4" <br />4" <br />APRON FLASHING PROFILE <br />OVERBRAKE APRON FLASHING COMPARED <br />TO ROOF SLOPE <br />USER NOTE(S) <br />1. DEFINE AIR BARRIER <br />TRANSITION FOR WALL <br />BELOW SLOPED ROOF <br />LINE. WHERE FEASIBLE <br />SEAL JOINTS IN <br />FRAMING/SHEATHING <br />BELOW ROOF LINE. <br />Revisions <br />01.00 2020-02-19 <br />PERMIT SUBMITTAL <br />a3 33 ERED <br />A ' <br />\1 53 A H T <br />t <br />YIN KEN K. CHIN <br />S'fAi OF WASNINC70N <br />EXP:2020.06.14 <br />NOTES 6= <br />s� <br />1. INSTALL SIDING WITH MINIMUM 1-1/2i-, CE <br />BETWEEN BOTTOM OF SIDING & SLOR'Ab, <br />ROOF - SEAL SIDING END CUTS. <br />2. APRON FLASHING TO BE SECURED fil-_ <br />RING-SHANKED FASTENERS WITH N( F6�RENE <br />WASHERS - PER SPECIFICATIONS. f <br />U, <br />rl <br />lolnl <br />MORRISON HERSHFIELD <br />SHORESIDE CONDOMINIUMS <br />ROOF REHAB <br />2001 120TH PL SE, EVERETT WA 98208 <br />Project # 180295600 <br />SEAL BETWEEN WRB AND <br />=ATHING <br />,ING, <br />VIOVE AND REINSTALL <br />=-FINISHED METAL APRON <br />�SHING W/ HEMMED EDGE AND <br />D DAMS AT TERMINATION <br />Xl <br />OF UNDERLAYMENT <br />N ASPHALT COMPOSITE <br />INGLE ROOFING <br />Scale <br />SLOPED ROOF TO WALL - <br />PARALLEL TO SLOPE <br />3"=1 '-0" <br />DWG No. Version Date <br />BE.51213 1 01.00 1 2020-05-08 <br />'© 2018 MORRISON HERSHFIELD - These documents have been prepared specifically for this project. They are not suitable for use on other projects or in other I <br />locations without approval and participation of MORRISON HERSHFIELD. <br />