Laserfiche WebLink
0 <br />NOTES: <br />1. DETAIL SIMILAR FOR OTHER PENETRATIONS <br />THROUGH SLOPED ROOF <br />1. CUT AND REMOVE SHINGLES <br />DOWNSLOPE OF PIPE PENETRATION. <br />2. INSTALL PRE -FORMED FLANGE OVER <br />PIPE. TUCK UNDER TOP COURSE OF <br />SHINGLES. <br />FLANGE <br />SEALANT <br />NEW SHINGLES <br />3. INSTALL NEW SHINGLES. TRIM AS <br />REQUIRED AT PIPE PENETRATION. <br />TUCK UNDER FLANGE. <br />4. SEAL SHINGLES COVERING FLANGE TO <br />FLANGE WITH SEALANT. <br />01.00 � C. 2020-02-19 <br />PEROT—'Z'JBMITTAL IT MORRISON HERSHFIELD <br />4E�I{ ART° SHORESIDE CONDOMINIUMS <br />VIWV�1_ <br />ROOF REHAB <br />LWASHINGTON <br />. CHIN <br />2001 120TH PL SE, EVERETT WA 98208 <br />EXP 2020.nr.IA <br />PLUMBING STACK <br />INSTALLATION ISOMETRIC <br />Scale <br />N.T.S. <br />DWG No. Version Date <br />Project # 180295600 BE.532A 01.00 2020-05-08 <br />113 <br />1 18 MORRISON HERSHFIELD - These documents have been prepared specifically for this project. They are not suitable for use on other projects or in other <br />locations without approval and participation of MORRISON HERSHFIELD. <br />rn <br />3 <br />v <br />ai <br />rn <br />t <br />U) <br />CL <br />a <br />o' <br />O <br />u? <br />w <br />m <br />m <br />