Laserfiche WebLink
I <br />4„ <br />411 <br />APRON FLASHING PROFILE <br />OVERBRAKE APRON FLASHING COMPARED <br />TO ROOF SLOPE <br />USER NOTE(S) <br />1. DEFINE AIR BARRIER <br />TRANSITION FOR WALL <br />BELOW SLOPED ROOF <br />LINE. WHERE FEASIBLE <br />SEAL JOINTS IN <br />FRAMING/SHEATHING <br />BELOW ROOF LINE, <br />Revisions <br />01.00 2020-02-19 <br />PERMIT SUBMITTAL <br />�33 tREGIERTED <br />YIN KEN K. CHIN <br />STAT OF WASHINCTON <br />EXP: 2020-06.14 <br />NOTE(S) � C <br />1. INSTALL SIDING WITH MINIMUM 1-1/2"-,W. <br />BETWEEN BOTTOM OF SIDING & SLO 0 <br />ROOF - SEAL SIDING END CUTS.m> <br />2. APRON FLASHING TO BE SECURED VTF <br />RING-SHANKED FASTENERS WITH NEENE <br />WASHERS - PER SPECIFICATIONS. 1 <br />■ <br />MORRISON HERSHFIELD <br />SHORESIDE CONDOMINIUMS <br />ROOF REHAB <br />2001 120TH PL SE, EVERETT WA 98208 <br />Project # 180295600 <br />SEAL BETWEEN WRB AND <br />EATHING <br />IING, <br />MOVE AND REINSTALL <br />E-FINISHED METAL APRON <br />kSHING W/ HEMMED EDGE AND <br />D DAMS AT TERMINATION <br />LN <br />OF UNDERLAYMENT <br />W ASPHALT COMPOSITE <br />INGLE ROOFING <br />Scale <br />SLOPED ROOF TO WALL - <br />PARALLEL TO SLOPE <br />3"=1'-0" <br />DWG No. Version Date <br />BE.512B 1 01.00 1 2020-05-08 <br />© 2018 MORRISON HERSHFIELD - These documents have been prepared specifically for this project. They are not suitable for use on other projects or in other <br />locations without approval and participation of MORRISON HERSHFIELD. <br />