My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/30 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 5:16:14 PM
Creation date
1/4/2021 4:28:19 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/30/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order # 4 Costs <br />B <br />or <br />Schedule <br />A <br />Schedule <br />C <br />Schedule <br />D <br />Schedule <br />E <br />Schedule <br />F <br />A-104-GFCI <br />Receptacles <br />$8,456.00 <br />$8,456.00 <br />C-9-Flaggers <br />$69,000.00 <br />$69,000.00 <br />C-26-Cement <br />Concrete <br />Pavement <br />$25,420.00 <br />$25,420.00 <br />C-208-Install <br />Video <br />Protection <br />System <br />$12,150.00 <br />$12,150.00 <br />C-209-Lighting <br />Conductors <br />at <br />Rucker <br />& <br />Hewitt <br />$1,416.00 <br />$1,416.00 <br />C-210-Hydroblaster <br />Roadway <br />Preparation <br />$16,500.00 <br />$16,500.00 <br />D-3 <br />Gravel <br />Borrow <br />outside <br />of <br />Watermain <br />area <br />$96,600.00 <br />$96,600.00 <br />)-4-Roadway <br />Excavation <br />outside <br />of <br />Watermain <br />are <br />$60,060.00 <br />$60,060.00 <br />D-5-CSBC-Outside <br />of <br />Watermain <br />trench <br />area <br />$79,800.00 <br />$79,800.00 <br />)-10-Equitable <br />Adjustment <br />-Differing <br />Site <br />Condition <br />$160,604.00 <br />$160,604.00 <br />-25-Equitable <br />Adjustment <br />in <br />Watermain <br />trench <br />are <br />$30,591.00 <br />$30,591.00 <br />E-26-Roadway <br />Watermain <br />Excavation <br />trench <br />area <br />Including <br />on <br />Rucker <br />Haul- <br />$11,440.00 <br />$11,440.00 <br />E-27-CSBC <br />in <br />Watermain <br />Trench <br />area <br />on <br />Rucker <br />$15,200.00 <br />$15,200.00 <br />E-28-Gravel <br />Borrow <br />in <br />Watermain <br />Trench <br />area <br />$18,400.00 <br />$18,400.00 <br />E-29-Water <br />Meter <br />Box <br />$9,176.00 <br />$9,176.00 <br />E-30-Math <br />Error <br />Correction <br />in <br />Change <br />Order <br /># 1 <br />-$12,900.32 <br />-$12,900.32 <br />$48,754.50 <br />F-1-Covid-19 <br />Project <br />Costs <br />$48,754.50 <br />TOTAL <br />COST <br />OF <br />CHANGE <br />ORDER <br /># 4 <br />$650,667.18 <br />$8,456.00 <br />$124,486.00 <br />$397,064.00 <br />$71,906.68 <br />$48,754.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.