My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY 2017 BROADWAY KINECT APARTMENTS Plans 2022-11-23 (3)
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
Plans
>
3214 BROADWAY 2017 BROADWAY KINECT APARTMENTS Plans 2022-11-23 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 1:04:28 PM
Creation date
1/12/2021 9:06:23 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Permit
B1710-041
Year
2017
Notes
VOLUME 1 OF 2
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�91J� <br /> = KEYNOTE SCHEDULE ���A PD <br /> o MARK NOTE <br /> Q z J 3/4"GYPCRETE POURED OVER 3/4"A.P.A. RATED T&G FLOOR SHTG. American Property Deveiopment, Inc. <br /> �iz Q 10 w/10d NAILS 6"O.C.@ PANEL EDGES, 12"O.C. FIELD. STAGGER PANEL 110 110th Avenue NE suite 550 <br /> Q a � JOINTS& PROVIDE CONSTRUCTION ADHESIVE AT ALL SUPPORTS Bellevue,WA98004 <br /> CRIPPLE STUDS TO MATCH w� � <br /> WALL FRAMGING c�n Z w O 15/32"A.P.A. RATED ROOF SHTG.w/10d NAILS 6"O.C. @ PANEL EDGES, <br /> WHERE SHEAR WALL W W = 12"O.C. FIELD.STAGGER PANEL JOINTS. <br /> OCCURS ADJACENT WINDOW, w� Z � , � N <br /> TRIMMER AND KINGS STUD =a O <br /> ARE REPLACED WITH THE � ¢ Z O RAM NGCAL CURB AND UNITS. RE:TYPICAL CURB DETAIL FOR ~ 'y,�-' ~ ��� <br /> ASSEMBLY SHOWN <br /> BEAM LOCATION TO BE COORDINATED WITH ELEVATOR MFR.& 201 N. Maple Grove Ste. 100 <br /> ' ' '� ' I 40 ARCHITECT PRIOR TO CONSTRUCTION. RE: 10/S6.11 FOR WALL BOISE (DAHO 83704 <br /> � � �� � CONNECTION REQUIREMENTS. Phone(208)342-7168 <br /> ' WALL(DBL)TOP PLATES LE JOB#154191.00 <br /> � ALL STRUCTURAL DETAI�USED ON THIS <br /> i i i 05 HATCH DENOTES MULTIPLE JOISTS. RE:JOIST SCHEDULE ON S4.11 PLANARECOPYRIGHT(C) OFLOCHSA <br /> HUC HANGER '� ' HEADER PER PLAN AND ENGINEERINGOPIDAHO.�HERE•USEOF <br /> ANY DE7AILS AND CONCEPTS IS NOT <br /> INTERIOR SIDE POST, i i � SCHEDULE ACCEPTABLEWITHOUTWRITTENCONSENT <br /> OPENING �� � OFLOCHSAENGINEERINGOFIDAHO. <br /> PER PLAN AND SHEET � <br /> S4.12 WIDTH � i TRIMMER STUD((1)-MIN.) 6 PROVIDE TRIPLE JOIST FOR POST ABOVE <br /> END OF WALL POST, '� � TIGHT TO BOTTOM OF <br /> PER PLAN AND SHEET �� i HEADER AS REQ'D BY <br /> S4.12 ---- - ___ �i i SCHEDULE O HEADER OUT FOR ROOF HATCH OPENING BY OTHERS-VERIFY EXACT M� H E <br /> SIMPSON ATS P-----Tr- -�T- i i SIZE AND LOCATION WITH ARCH AND MFR. SEE DETAIL 4/S5.33 P N <br /> HOLDOWN SYSTEM i i i i i i i� ' i � KING STUD((1)-MIN.)FULL P �� oF ASN�'yG <br /> i� i' i� i� i , HEIGHT-PLIES AS REQ'D � '�P � � <br /> SEE SHEET S4.12 FOR i i i i i �i � i � O MECHANICAL CHASE, FLOOR OPENING, RE:ARCH. FOR EXACT � ? <br /> MORE INFORMATION �� i� i� i� i i , BY SCHEDULE 8 <br /> i i i OPENING DIMENSIONS. �' <br /> WALL FRAMING PER i i i i i� i i i i i WALL FRAMING PER PLAN <br /> PLAN i� i� i� i� i i i <br /> , , i , WINDOW SILL PER - <br /> CRIPPLE STUDS TO i� i� i� i� i i i SCHEDULE AS OCCURS 90 ELEVATOR OPENING,VERIFY EXACT DIMENSIONS WITH ARCH. `�T <br /> MATCH WALL FRAMING �'G 3548 � <br /> � � <br /> o,r RAL EN �F' <br /> 10 STAIR FRAMING, RE: SHEET S2.11 -S2.12 FSS��N A L ENG\ <br /> HEADER SCHEDULE 03-29-1 <br /> EXP.01/07/202 <br /> TRIMMERS(DFL#2) 11 PROVIDE DBL LEDGER/RIM FOR STRAP CONNECTION <br /> COPYRIGHT CO2011, ALL RIGHTS RESERVED <br /> MEMBER(DFL#2) SUPPORTING SUPPORTING SUPPORTING SUPPORTING <br /> LABEL ROOF+4 ROOF+3 ROOF+2 ROOF+ 1 SUPPORTING <br /> LEVELS OF LEVELS OF LEVELS OF LEVEL OF ROOF ONLY WHERE COMPRESSION POST FOR BEAM FILLS ALL AVAILABLE ROOM SUBMITTAL/REVISIONS <br /> @ ROOF @ 4TH-7TH FLR. FLOOR FLOOR FLOOR FLOOR 12 BTWN HEADERS, ELIMINATE TRIMMER AND PROVIDE EQUIVALENT SIZE # DATE DESCRIPTION <br /> (3)-2x4 (3)-2x4 (2)-2x4 (2)-2x4 (1)-2x4 HUC HANGER TO COMPRESSION POST 1 3/28/2018 ADDENDA#1 <br /> H1 4x6 4x6 (2)-2x6 (1)-2x6 (1)-2x6 (1)-2x6 (1)-2x6 13 PROVIDE SIMPSON CMST12 DRAG STRAP FROM TOP PLATE TO BLKG. <br /> (2)-2x8 (1)-2x8 (1)-2x8 (1)-2x8 (1)-2x8 PER DRAG STRAP SCHEDULE <br /> (4)-2x4 (3)-2x4 (2)-2x4 (1)-2x4 (1)-2x4 <br /> H2 4x8 4x8 (2)-2x6 (2)-2x6 (1)-2x6 (1)-2x6 (1)-2x6 14 PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM LEDGER/RIM TO <br /> (2)-2x8 (2)-2x8 (1)-2x$ (1)-2x8 (1)-2x8 BLKG. PER DRAG STRAP SCHEDULE <br /> KINGSTUDS REQ'D EA.SIDE OF HEADER @ ALL LEVELS(DFL#2) PROVIDE SIMPSON CS14 DRAG STRAP FROM TOP PLATE TO BLKG.PER <br /> oPewNG 15 DRAG STRAP SCHEDULE <br /> WALL SIZE wi�rH 0'-0"-5'-0" 5'-0"-8'-0" 8'-0"-12'-0" 12'-0"- 16'-0" <br /> 2x4 (1)-2x (2)-2x (2)-2x (3)-2x PROVIDE SIMPSON CMST12 DRAG STRAP FROM TOP PLATE TO DRAG <br /> 16 MEMBER PER DRAG STRAP SCHEDULE. PROVIDE AND FASTEN STRAP <br /> 2x6 (1)-2x (2)-2x (2)-2x (2)-2x TO BLKG. BETWEEN TOP PLATE AND DRAG MEMBER <br /> 2x8 (1)-2x (2)-2x (2)-2x (2)-2x PROVIDE SIMPSON CMSTCI2 DRAG STRAP FROM TOP PLATE TO TOP <br /> 17 PLATE PER DRAG STRAP SCHEDULE. PROVIDE AND FASTEN STRAP TO <br /> BLKG. IN BETWEEN TOP PLATES <br /> NOTES: PROVIDE SIMPSON CMST12 DRAG STRAP FROM TOP PLATE TO DRAG <br /> 18 MEMBER PER DRAG STRAP SCHEDULE <br /> 1. PROVIDE 2x6 COMPRESSION BLOCK IN ADDITION TO RIMlBLOCKING IN FLOOR CAVITY FOR GRAVITY LOAD <br /> TRASNFER OF ALL HEADERS SUPPORTING ROOF+X LEVEL OF FLOOR. <br /> PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM TOP PLATE TO BLKG. <br /> 2. ALL NON-BEARING HEADERS SHALL BE CONSTRUCTED PER 5� 19 PER DRAG STRAP SCHEDULE <br /> 3. FOR TYPICAL BEARING WALL AND HEADER CONSTRUCTION REFER TO 5.3 ' 5.3 PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM TOP PLATE TO TOP <br /> 20 PLATE PER DRAG STRAP SCHEDULE. PROVIDE AND FASTEN STRAP TO <br /> BLKG. IN BETWEEN TOP PLATES <br /> BEAM/POST SCHEDULE 2� PROVIDE SIMPSON CS14 DRAG STRAP FROM LEDGER/RIM TO DRAG <br /> MEMBER PER DRAG STRAP SCHEDULE <br /> POSTS(DFL#2, U.N.O.) <br /> SUPPORTING SUPPORTING SUPPORTING SUPPORTING PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM TOP PLATE TO DRAG �J <br /> LABEL LEVEL MEMBER ROOF+4 ROOF+3 ROOF+2 ROOF+ 1 SUPPORTING 22 MEMBER PER DRAG STRAP SCHEDULE. PROVIDE AND FASTEN STRAP .w <br /> LEVELS OF LEVELS OF LEVELS OF LEVEL OF ROOF ONLY TO BLKG. IN BETWEEN TOP PLATE AND DRAG MEMBER �/� <br /> FLOOR FLOOR FLOOR FLOOR <br /> @ ROOF 23 PROVIDE SIMPSON CS14 DRAG STRAP FROM LEDGER/RIM TO BLKG. � <br /> PER DRAG STRAP SCHEDULE <br /> B1 (2)-1 3/4"x9 1/4"LVL (3)-2x6 (2)-2x6 (2)-2x6 (2)-2x6 (2)-2x6 � �f1 � <br /> @ 4TH-7TH FLR. V� <br /> PROVIDE SIMPSON CS14 DRAG STRAP FROM DRAG MEMBER TO BLKG. N �� O <br /> @ ROOF (3)-1 3/4"x9 1/4"LVL 24 PER DRAG STRAP SCHEDULE <br /> B2 (3)-2x6 (3)-2x6 (2)-2x6 (2)-2x6 (2)-2x6 � � � <br /> @ 4TH-7TH FLR. (4)-1 3/4"x9 1/4"LVL , � � <br /> 25 PROVIDE SIMPSON CS14 DRAG STRAP FROM TOP PLATE TO DRAG <br /> @ ROOF (4)-1 3/4"x9 1/4"LVL ! MEMBER PER DRAG STRAP SCHEDULE � � (� <br /> ❑B3 5-2x6 4-2x6 3 -2x6 2-2x � <br /> ( ) ( ) ( ) ( ) 6 (2)-2x6 PROVIDE SIMPSON CS16 DRAG STRAP FROM TOP PLATE TO TOP PLATE � �� <br /> @ 4TH-7TH FLR. (5)-1 3/4"x9 1/4"LVL � 26 PER DRAG STRAP SCHEDULE. PROVIDE AND FASTEN STRAP TO BLKG. �•( � �-+ <br /> @ ROOF (5)-2x4 (4)-2x4 (3)-2x4 (2)-2x4 (2)-2x4 BETWEEN TOP PLATES �v (� � <br /> 64 {2)-1 3/4"xi i 7/8"LVL OR OR OR OR OR PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM DRAG MEMBER TO � <br /> @ 4TH-7TH FLR. (3)-2x6 (2)-2x6 (2)-2x6 (2)-2x6 (2)-2x6 27 BLKG. PER DRAG STRAP SCHEDULE � � <br /> � Q W <br /> a�ROOF (3)-1 3/4"x11 7/8"LVL (5)-2x6 (4)-2x6 (3)-2x6 II (2)-2x6 (2)-2x6 � <br /> B5 OR OR OR OR OR 28 PROVIDE SIMPSON CMSTCI6 DRAG STRAP FROM TOP PLATE TO DRAG O <br /> @ 4TH-7TH FLR. (4)-1 3/4"x11 7/8"LVL 4x6 PSL 4x6 PSL 4x6 PSL 4x6 PSL 4x6 PSL MEMBER PER DRAG STRAP SCHEDULE <br /> L <br /> @ ROOF PROVIDE SIMPSON CS16 DRAG STRAP FROM TOP PLATE TO BLKG. PER � <br /> B6 W8x28 6x8 6x8 6x8 6x8 6x8 29 DRAG STRAP SCHEDULE <br /> @ 4TH-7TH FLR. � <br /> H <br /> PROVIDE SIMPSON CS16 DRAG STRAP FROM TOP PLATE TO DRAG � <br /> NOTES: 30 MEMBER PER DRAG STRAP SCHEDULE V <br /> w <br /> a 1. PROVIDE 2x6 COMPRESSION BLOCK IN ADDITION TO RIM/BLOCKING IN FLOOR CAVITY FOR GRAVITY LOAD TRANSFER p <br /> � <br /> � d <br /> N <br /> � <br /> � <br /> � JOIST SCHEDULE WALL FRAMINC SCHEDULE <br /> � <br /> N <br /> ? MAXIMUM STUD WALL SCHEDULE <br /> � LABEL CLEAR SPAN SIZE SPACING SERIES/GRADE SUPPORTING SUPPORTING SUPPORTING SUPPORTING <br /> LABEL WALL SIZE ROOF+4 ROOF+3 ROOF+2 ROOF+ 1 SUPPORTING �^ <br /> � 15'-6" 11 7/8" I-JOIST LEVELS OF LEVELS OF LEVELS OF LEVEL OF ROOF ONLY �!� <br /> o FLOOR FLOOR FLOOR FLOOR � <br /> o J1 18'-6" (2)-11 7/8"I-JOIST 19.2"O.C. TJI 110 OR EQ. 2x4 N/A N/A N/A N/A N/A <br /> � ---�— W i <br /> � 10'-0" (3)-11 7/8"I-JOIST 2x6 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. H J <br /> � 12'-0" 9 1/2"I-JOIST W2 2x4 4@ 16"O.C. 3@ 16"O.C. 3@ 16"O.C. 2@ 16"O.C. 1@ 16"O.C. W � <br /> � J2 15'-3" (2)-9 1/2"I-JOIST 19.2"O.C. TJI 110 OR EQ. 2x6 2@ 16"O.C. 2@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. � � <br /> 0 18'-0" (3)-9 1/2"I-JOIST W3 2x8 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. 1@ 16"O.C. U � <br /> m 15'-6" 11 7/8"I-JOIST O Q � <br /> J3 18'-6" (2)-11 7!8"I-JOIST 24"O.C. TJI 110 OR EQ. ' ` <br /> `m W4 2x4 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. Z <br /> w 20'-0" (3)-11 7/8"I-JOIST 2x6 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. 1@ 24"O.C. � v <br /> v J4 8'-0" (2)-2x4 12"O.C. LSL 1.3E (~� � <br /> NOTES: <br /> �. 10'-4" (2)-2x4 8"O.C. � I,..� <br /> � 1. ALL NON-BEARING WALLS SHALL BE ANCHORED AS FOLLOWS: � <br /> W � � <br /> @ CONCRETE:(2)-POWDERACTUATED FASTENERS @ 24"O.C. MAX F- O <br /> JOIST @ WOOD FLOOR: SEE'WOOD'SECTION IN THE GSNs. (� � <br /> Z <br /> Q2. ALL SHEARWALLS SHALL HAVE STUDS SPACED AT NO GREATER THAN 16"O.C. O <br /> � CLEAR SPAN U � <br /> � w � � <br /> � o � <br /> � <br /> � o � <br /> � w � _ <br /> a� � � � <br /> � <br /> � <br /> m <br /> i DRAWN BY <br /> � <br /> RA <br /> � <br /> U SHEET NUMBER <br /> � <br /> � <br /> a� <br /> � 4 . 11 <br /> � <br /> m <br />
The URL can be used to link to this page
Your browser does not support the video tag.