Laserfiche WebLink
��I'1 d <br /> ����t�f <br /> SEC. 29, T29N . , R5E. , W. M . <br /> American Property Development,Inc. <br /> 110 110th Avenue NE suite 550 <br /> Bellevue,WA 98004 <br /> SCJ ALLIANCE - GENERAL CONSTRUCTION NOTES: TRAFFIC CONTROL NOTES: TYPICAL ABBREVIATIONS <br /> 1. ALL WORK, WORKMANSHIP AND MATERIALS FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF OF 1. TRAFFIC CONTROL SHALL BE IMPLEMENTED & MAINTAINED IN ACCORDANCE WI1H CITY OF EVERETT STANDARDS AND THE <br /> THE FOLLOWING MANUAL(S) AND DOCUMENT(S): MANUAL OF UNIFORM TRAFFlC CONTROL DEViCES. & AND FDC FIRE DEPARTMENT CONNEC110N S SOUTH OR SLOPE <br /> fl ANGLE FDN FOUNDAl10N SCHED SCHEDULE <br /> CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND SPECIFlCATIONS FOR DEVELOPMENT, 2. EMERGENCY VEHICLE ACCESS (E.V.A.) MUST BE PROVIDED BY THE CONTRACTOR THROUGHOUT THE PROJECT SITE. E.V.A. t APPROXIMATELY FF FINISH FLOOR SD, SDMH STORM DRAIN, STORM DRAIN MANHOLE � <br /> HTTPS://EVERETTWA.GOV/DOCUMENTCENTER/HOME/VIEW/243 ROADS AND SIGNAGE SHALL BE MAINTAINED BY THE CONTRACTOR AT ALL 11MES. SIGNAGE SHALL BE POSTED AT THE 0 AT FG FINISHED GRADE SE SOUTHEAST � <br /> POINT OF ENTRY TO THE SITE AND AT ALL LOCATIONS WHERE A CHANGE IN DIRECTION OCCURS. � CENTERLINE FH FIRE HYDRANT SECT SECTION(S) � <br /> GEOTECH REPORT, PREPARED BY EARTH SO1U110NS NW, LLC (UPDATED JUNE 9, 2016) 3. THE CONTRACT� SHALL BE RESPONSIBLE FOR AND FURNISH, INSTALL, AND MAINTAIN TEMPORARY SIGNS, BARRICADES, � DEGREE FIN FINISH(ED) �T SHEET U N =Q <br /> E Q U A L S F L F L O W L I N E S P R I N K L E R W Q � <br /> 2. ALL GOVERNMENTAL SAFETY REGULATIONS SHALL BE STRICTLY ADHERED TO INCLUDING OSHA. FLAGMEN, AND OTHER FACILITIES TO ADEQUATELY SAFEGUARD THE GENERAL PUBLIC AND WORK, AND TO PROVIDE FOR ' FOOT SQ SQUARE Z � 3 N <br /> THE PROPER ROUIING OF VEHICULAR AND PEDESTRIAN TRAFFIC. FT FOOT/FEET > w M � <br /> > GREATER THAN SQ FT SQUARE FEET ' Q � �o 0 <br /> 3. I T I S 1 H E R E S P O N S I B I L I T Y O F T H E C O N T R A C T O R T O D U L Y N O T 1 F Y T H E C I T Y O F E V E R E T f I N A D V A N C E O F T H E " I N C H S Q I N S Q U A R E t N C H � + J u w i o M� <br /> C O�I M E N C E M E N T O F A N Y A U T H O R I Z E D W O R K A N D T O S C H E D U L E R E Q U I R E D I N S P E C 1 1 0 N S. A N Y R E Q U I R E D I N S P E C 1 1 0 N T E S T # NUMBER G GAS SS SANITARY SEWER " , J z �,� Q <br /> W I L L B E P E R F O R M E D A T T H E C O N T R A C T O R'S E X P E N S E. � PERCENT GRND GRO NDIZED SSMH SANITARY SEWER MANHOLE I , ' ►- ��� <br /> � � N�� <br /> 4. THE APPROVAL OF THESE PLANS BY THE CITY OF EVERETT DOES NOT RELIEVE THE CONTRACTOR OR DEVELOPER OF THE ST STREET I � w M <br /> RESPONSIBILITY TO COMPLY WITH THE REQUIREMENTS OF OTHER GOVERNING AGENCIES. AC ASPHALTiC CONCRETE GV GATE VALVE STA STATION � Z z a <br /> ADQ'L ADDI110NAL STD STANDARD r1 � z" <br /> CAU110N - NOTICE TO CONTRACTOR ADJT ADJACENT HH HANDHOLE STRUCT STRUCTURE(E, AL) v U o� <br /> 5. T H E C O N T R A C T O R I S S P E C I Fl C A L L Y C A U T I O N E D T H A T T H E L O C A 1 1 0 N O F E X I S T I N G U T I U T I E S A S S H O W N O N T H E S E P L A N S I S A F F A B O V E Fl N I S H F L O O R H O R I Z H O R I Z O N T A L S W S O U T H W E S T � � <br /> BASED ON THE PROJECT SURVEY AND OTHER RECORDS OF U11L1TIES. TNE INFORMATION IS NOT TO BE RELIED ON AS BEING AP ANGLE POINT HT HEIGHT SYS SYSTEM o <br /> EXACT OR CO�IPLETE. THE CONTRACTOR SHALL CALL 811 48 HOURS PRIOR TO PLANNED EXCAVAl10NS. APPROX APPROXIMATE � <br /> ARCH ARCHITECT IE INVERT ELEVATION T TELEPHONE OR TELEPHONE VAULT <br /> 6. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISIING CONDITIONS. THE EXISTiNG ATB ASPHALT TREATED BASE COURSE IN INCH 1BD TO BE DETERMINED <br /> CONDITIONS SHOWN ON THIS PLAN SHEET ARE BASED UPON COMPILED SURVEY DATA. THE CONTRACTOR IS RESPONSIBLE AVE AVENUE TBM TEMPORARY BENCH MARK <br /> FOR VERIFYING FIELD CONDI110NS PRIOR TO BIDDING THE PROPOSED WORK IMPROVEMENTS. IF CONFLJCTS ARE DISCOVERED, JB, J-BOX JUNCTION BOX TC TOP OF CURB ELEVATION <br /> THE CONTRACTOR SHALL NO11FY THE 01MNER OR OWNER'S REPRESENTATIVE. BCR BEGIN CURB RETURN TELE TELEPHONE �����T O �� � RIGHTS RESERVED <br /> JT JOINT TRENCH <br /> BFV BUTTERFLY VALVE kV KILOVOTS TEMP TEMPORARY SUBMITTAL/REVISIONS <br /> 7. EXISTING UTIUTIES ARE SHOWN FOR REFERENCE ONLY. THE CONTRACTOR SHALL VERIFY EXACT LOCAl10N, DIA, LENGTH, BGS BELOW GROUND SURFACE kW KILOWATT TOW TOP OF WALL <br /> CONDITION, PIPE TYPE, SLOPE AND VERTICAL AND HORIZONTAL ALIGNMENT OF THE EXISTING ALIGNMENT OF THE PROPOSED � DAlE DESCRIPTION <br /> BLK BLOCK(S) KWH KILOWATf HOURS TP, T/P TOP OF PIPE � 2�20/1 BID SET <br /> POINTS OF CONNECTION PRIOR TO CONNEC110N AND REPORT ANY DISCREPANCIES TO ENGINEER PRIOR TO CONSTRUCTION. BLDG BUILDING TYP TYPICAL <br /> 8. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL OBTAIN ALL NECESSARY LOCAL, STATE, AND FEDERAL APPROVALS BM BENCHMARK MAX MAXIMUM UDG UNDERGROUND <br /> AND PERMITS. BVC BEGIN VERTICAL CURB MFR MANUFACTURER <br /> MH MANHOLE VAP VERTICAL ANGLE POINT <br /> 9. IT SHALL BE THE RESPONSIBILITY OF 1NE CONTRACTOR TO HAVE A COPY OF TNE APPROVED PLANS, SPECIFlCAl10NS, AND C CONDUIT MIN MINIMUM, MINUTE VC VERIICAL CURVE <br /> CONTRACT DOCUMENTS AT THE CONSTRUCTION SITE AT ALL 11MES. CB CATCH BASIN MISC MISCELLANEOUS VERT VERTICAL <br /> CF CUBIC FEET M10N MONUMENT IN CASE VOL VOLUt�E <br /> 10. ALL VEHICLES AND EQUIPMENT SHALL BE KEPT WIIHIN THE WORK AREAS ESTABLISHED FOR T}iAT WORK SHIFT UNLESS CIRC CIRCUIT, CIRCULA(R, TION) <br /> TRAVEIJNG TO OR fROM THE SITE. UNDER NO CIRCUMSTANCES SHALL VEHICLES BE PARKED OR EQUIPMENT BE STORED CIP CAST-IN-PLACE N NOR1H, NORTHING W IMEST, WIDTH, WIDE OR WATER <br /> OUTSIDE OF THESE AREAS. <br /> CIP MON CAST-IN-PLACE MONUMENT N/A NOT APPLICABLE W/ WITH <br /> 11. OTHER CONSTRUCTION PROJECTS MAY OCCUR NEAR THE PROJECT SITE AND MAY BE IN PROGRESS CONCURRENT WITH THE CJ CENTER JOINT NE NORTHEAST W/0 WITHOUT <br /> PROJECT. THE CONTRACTOR SHALL COOPERATE AS NECESSARY AND NOT INTERFERE OR HINDER THE PROGRESS OR � CENTER LINE NEMA NAl10NAL ELECTRICAL MANUFACTURES � WATER MAIN <br /> COMPLETION OF WORK BEING PERFORMED BY OTHER CONTRACTORS. CL CROWNLINE ASSOCIAl10N WV WATER VALVE <br /> CLR CLEAR NIC NOT IN CONTRACT <br /> 12. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTAWNG ALL MATERIALS, LABOR, AN� EQUIPMENT NECESSARY COE CITY OF EVERETT N0, No NUMBER XFMR TRANSFORMER <br /> TO COMPLETE THE WORK SHOWN ON THESE DRAWINGS AND TO OBTAIN ACCEPTANCE BY 1NE CITY OF EVERETT AND THE CO ClEANOUT NTS NOT TO SCALE <br /> PROJECT OWNER. COMM COMMUNICAl10N NW NORTHWEST <br /> COMPT COMPACTED <br /> 13. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL "PRE CONSTRUC110N" STATE OR CONC CONCRETE OC, oc ON CENTER <br /> BETTER. CONST CONSTRUCT OD OUTSIDE DIAMETER <br /> CONT CONTINU(E, ED, OUS, AT10N) OSHA OCCUPAl10NAL SAFETY & HEALTH <br /> 14. DRIVEWAY ACCESS AND UTILITY SERVICE TO EXISIING HOMES AND BUSINESSES SHALL BE MAINTAINED AT ALL TIMES. COORD COORDINATE ADMINISIRATION <br /> 15. CONTRACTOR MUST REMAIN AWARE OF THE EXISTING OVERHEAD U11LI11ES IN THE CONSTRUC110N AREA AND ADJACENT CSBC CRUSHED SURFACING BASE COURSE • <br /> AREA TO THE SITE. ALL LOCAl10NS FOR THESE U11LI11ES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE CSTC CRUSHED SURFACING TOP COURSE P POWER, POWER VAULT '•— <br /> INFORMATION, WHICH MAY CONTAIN ERRORS. CULV CULVERT PC POINT OF CURVATURE ♦^ <br /> CU YD CUBIC YARD PCC POINT OF COMPOUND CURVE V J <br /> 16. THE CONTRACTOR IS RESPONSIBLE FOR COORDINAl10N OF CONSTRUCTION AFFECIING UT1LJ11ES AND THE COORDINAl10N OF PED PEDESTAL <br /> NECESSARY UTILITY RELOCAl10N WORK INCLUDING U11LI11ES, POWER AND TRAFFlC POLES, IRRIGATION LINES AND CONIROLS, D/W DRIVEWAY PI POINT OF INTERSECTION Q <br /> ETC. DEF DEFLEC110N R PROPERTY UNE � <br /> DEG DEGREE POC POINT OF CONNECTION � � <br /> 17. CONTRACTOR IS RESPONSIBLE FOR PROTECTING SHALLOW PIPE FROM DAMAGE DURING CONSTRUC110N. PIPE COVER ON �l-IE DEMO DEMOLISH/DEMOLI110N PP POWER POLE N Z <br /> DRAWING IS DESIGNED FOR FlNAL GRADE; THEREFORE, ADDITIONAL CARE MUST BE EXERCISED DURING CONSTRUCTION TO DIA DIAMETER PRC POINT OF REVERSE CURVATURE <br /> MAINTAIN ADEQUATE COVER. M <br /> DIM DIMENSION(S) PROP PROPERTY � <br /> 18. PRIOR TO MOBILIZATION, CONTRACTOR SHALL POTHOLE AND REVIEW INFORMA110N ON ALL EXISTING UT1LI11ES. CONTRACTOR DIP DUCTILE IRON PIPE PSI POUNDS PER SQUARE INCH � <br /> SHALL REVIEW POTHOLE INFORMATION ON U1ILJTY DUCT BANK, GAS LINE, POWER LINE AND OTHER U11LITlES AND ESTABLISH DR DRIVE PT POtNT OF TANGENCY 5 <br /> DEPTHS (TOP AND BOTTOM) OF U1IUTIES IN THE PROJECT WORK AREA. CONTRACTOR SHALL CONTACT ENGINEER WITH ANY DWG(S) DRAWING(S) PVC POINT OF VERTICAL CURVE � G Z <br /> PVI POINT OF VERIICAL INTERSEC110N •--■ O <br /> UTILITY CONFLICTS. E EAST OR ELECTRICAL P� P O I N T O F V E R T I C A L T A N G E N T � �/ �.._ <br /> 19. GROUNDWATER MAY EXIST ON 1HE PROJECT SITE. SEE GOETECH REPORT, PREPARED BY EARTH SOLUTIONS NORINWEST EA EACH PVMT PAVEMENT �j LJ.� Ur <br /> (UPDAlED JUNE 9,2016) ECR END CURB RETURN P� P��R S � Z <br /> EHH ELECTRICAL HANDHOLE <br /> EL, ELEV ELEVATION QN QUANIITY Q � � <br /> ELEC ELECTRIC(AL) � Q Q <br /> ENGR ENGINEER R RADIUS � <br /> EOP EDGE OF PAVEMENT RD ROAD, ROADWAY <br /> � EQUIP EQU PMENT R INF REINFORC(E, ED, ING, MENT) W � <br /> Z ESMT EASEMENT R E Q'D R E Q U I R E D F � W <br /> � EVC END VERTICAL CURVE REV REVISION � � � <br /> � RIM STRUCTURE RIM ELEVAl10N � W <br /> � EX, EXIST EXISIING RT RIGHT o W <br /> o EXP EXPANSION R/W, ROW RIGHT OF WAY a <br /> o � <br /> < <br /> U <br /> H <br /> Z <br /> W <br /> � <br /> � <br /> U <br /> O <br /> � <br /> O Q <br /> � � <br /> U <br /> � <br /> � � <br /> N <br /> Z <br /> O <br /> U �I <br /> O_ � <br /> W � Q <br /> � <br /> Q � <br /> O/ <br /> � � � <br /> W <br /> � � <br /> W � <br /> H � <br /> Q � <br /> U � <br /> � � <br /> Q <br /> d <br /> O � <br /> � <br /> � �F/- <br /> Z . ■ . <br /> � � <br /> W � <br /> � <br /> Q <br /> C Z <br /> L Q <br /> � � <br /> � r � <br /> C � � � <br /> O � <br /> N W <br /> .Qo Sc� D.JqR <br /> � � CALL BEFORE YOU DIG: ��� °F WASyJ��js SAMI OROONEZ 2 OF 32 <br /> � � ��- a <br /> �� THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR � - 2 SHEET TITLE <br /> � � THE LOCATION AND PROTECTION OF ALL EXISTING � � <br /> � UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY o� <v <br /> op N ,Q 43668 p � G N 01 <br /> o � LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE FS FGISTE�� �,� � <br /> N w UNDERGROUND LOCATE LINE 811 OR 1-800-424-5555 SIONAL �� <br /> � A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION, 3/23I2018 <br /> 0 <br /> N � <br /> O� <br /> � Z <br />