Laserfiche WebLink
GENERAL NOTES ABBREVIATIONS SYMBOLS -������p <br /> ,�r����` � <br /> GFNERAL NOTES ACU AIR CONDITIONING UNIT <br /> I <br /> 7. ADJUSTMENTS: ALL EQUIPMENT, MOTORS, FANS GAS 17. HOT WATER RECIRCULATING BALANCING VALVE VALVES TO AFF ABOVE FINISHED FLOOR �� <br /> BE BELL & GOSSET CIRCUIT SETTER (OR WATTS AHJ AUTHORITY HAVING � PIPE CAP <br /> 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE BURNERS, IGNITION DEVICES, DRIVES, ETC. SHALL BE ARCHITECTURAL BACKGROUND <br /> ADJUSTED AND BALANCED TO OPERATE AT SPECIFIED JURISDICTION THIN LINE American Property Development,�nc. <br /> WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, EQUIVALENT� WITH INTEGRAL READOUT PORTS, ADJUSTMENT � � 110 110th Avenue NE suite 550 <br /> CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN�, OR ITEM RATINGS AS REQUIRED FOR THIS PROJECT SITE AND KNOB, DRAIN CONNECTION, AND POSITIVE SHUTOFF. BHP BRAKE HORSEPOWER PIPE PLUG Be��evue,wAssooa <br /> BASED ON A SPECIFIC MANUFACTURER'S DIMENSIONS ACCOUNTING FOR ELEVATION ABOVE SEA LEVEL. BOH BACK OF HOUSE NEW MECHANICAL WORK <br /> BTUH BRITISH THERMAL UNIT PER HEAVY LINE) -0I% UNION <br /> (VERIFY). 18. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FLANGES HOUR � � <br /> 8. APPROVALS: MECHANICAL AND PLUMBING EQUIPMENT SHALL AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, C COMMON --II-- FLANGE <br /> 2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL BE APPROVED FOR INSTALLATION IN THE PROJECT LOCATION CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW CAP CAPAGITY - - MATCHLINE OR PROPERTY LINE WYE STRAINER <br /> DRAWINGS FOR ELECTRICAL CHARACTERISTICS VOLTAGES, AND SHALL HAVE ALL CERTIFICATIONS AND RATINGS TO DISASSEMBLY FOR MAINTENANCE. CC COOLING COIL <br /> � MEET ALL ENERGY, POLLUTION, ENVIRONMENTAL, SEISMIC, WYE STRAINER WITH CAPPED HOSE <br /> ETC. OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE ETC. CODES AND REGULATIONS. THE CONTRACTOR SHALL 19. REDUCERS: PROVIDE AS REQUIRED FROM LINE PIPE SIZE CD CONDENSATE DRAIN SEC110N IDENIIFICATION � END BLOWDOWN VALVE <br /> INDICATED. COORDINATE WITH HIS MANUFACTURE SUPP�IERS AND SHALL CFF CAPPED FOR FUTURE <br /> TO EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CFM CUBIC FEET PER MINUTE �DETAIL SIMILARI �,,,, <br /> 3. CODES: COMPLETE INSTALLATION OF THE PLUMBING SYSTEM �NCLUDE ALL COSTS REQUIRED TO MEET THESE CONNECTION SIZES. CI CAST IRON BALL VALVE �OBI�O� <br /> SHALL BE PER THE APPLICABLE BUILDING, MECHANICAL, REQUIREMENTS IN HIS BID. CO CLEANOUTS INDICATES DIRECTION OF CUTTING <br /> 20. OFFSETS: PROVIDE FOR BRANCH LINES TO EQUIPMENT. P�ANE ��� CHECK VALVE <br /> ENERGY, PLUMBING, FIRE, AND HEALTH CODES AND 9, FIRE PROTECTION: CONTRACTOR SHALL PROVIDE A FU�LY COMB COMBUSTION ENGINEERING, INC <br /> REGULATIONS AS ADOPTED BY THE LOCAL AHJ. CONT CONTINUE CONTROL BALANCING OR PLUG VALVE <br /> DESIGNED FIRE PROTECTION SPRINKLER SYSTEM IN 21. DIELECTRIC UNIONS: PROVIDE AT CONNECTIONS OF ' LETTER INDICATES SECTION 1940140THAVEW..SUITE302 <br /> COMPLIANCE WITH NFPA AND LOCAL CODES. PROVIDE CONTR CONTRACTOR (N0. INDICATES DETAIL LYNNWOOD,WA98036 <br /> DISSIMILAR PIPE. ) --�\f-- BUTTERFLY VALVE 206-3643343rE� <br /> 4. PREPARE AND SUBMIT FOR REVIEW A SHOP DRAWING BASED COTG CLEANOUTS TO GRADE A <br /> DESIGN PERMITS MATERIALS INSTALLATION TESTING AND CONTACT:JONROBISON <br /> ON FINAL STRUCTURAL SHOP DRAWINGS FOR LOCATING AND ALL OTHER FOR �A FULLY OPERATIONAL SYSTEM. LOCATION CW CO�D WATER M-3 M-3� SHEET NUMBER WHERE SECTION IS �+ PRESSURE REDUCING VAIVE (PRV) <br /> ROUTING ALL EQUIPMENT, PIPING, ETC. 22. REFRIGERANT PIPING: PROVIDE SIZING & INSTALLATION IN D DIAMETER � DRAWN -�`�- , <br /> OF ALL PIPING TO BE COORDINATED WITH OTHER TRADES. STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br /> A. COORDINATE FLOOR AND BEAM PENETRATIONS WITH DB DRY BULB, DECIBEL SHEET NUMBER WHERE SECTION IS o❑oo <br /> STRUCTURAL. DIM DIMENSION TAKEN ��- AUTOMATIC CONTROL VALVE, 2-WAY O�OO O0� <br /> B. COORDINATE FINAL LOCATION AND ROUTING WITH 23. CONDENSATE DRAIN: PROVIDE A P-TRAP FOR EACH HVAC DN DOWN � ..' �R�e �O <br /> PLUMBING NOTES � O <br /> CEILING, LIGHTS, WAL�S, FIRE SPRINKLER PIPING, AND UNIT CONDENSATE PAN WITH PLUG TEES FOR CLEANING. DS DOWN SPOUT AUTOMATIC CONTROL VALVE, 3-WAY O Q':��� �FW�� �s0�o <br /> OTHER TRADES WORK. CONDENSATE DRAINS SHALL BE DISCHARGED TO AN EFF EFFICIENCY EQUIPMENT p Q p <br /> 1. CONNECTIONS: PROVIDE PLUM BING FIXT UR E C ONN E CT I O N S ❑� �� ���Z❑ <br /> C. I N C L U D E A D D I T I O N A L O F F S E T S, E L B O W S, R O U T I N G, I N D I R E C T W A S T E O R O U T S I D E. E L E C EL E C T R I C �p R E L I E F V A L V E ❑ : <br /> TO BUILDING WASTE, VENT, COLD WATER, AND HOT WATER EF_1 <br /> EQUIVALENT DUCT SIZING EXCHANGE, RELOCATING, ETC. , EWC ELECTRIC WATER COOLER TYPICAL EQUIPMENT DESIGNAl10N p �� � �' �� p <br /> SYSTEM IN ACCORDANCE WITH DRAWINGS, MANUFACTURER S <br /> AS REQUIRED FOR A COMPLETE OPERATING MECHANICAL RECOMMENDATIONS, AND LOCAL CODES. CONNECT TO EACH INSULATION/LINING NOTES EXT EXTERIOR, EXTERNAL (EXHAUST FAN SHOWN) _��_ gAI.ANCING/MEASURING VALVE � � .,..Fc�l �0...�� � <br /> SYSTEM. FIXTURE, EQUIPMENT, ETC. WITH ALL ACCESSORIES, VALVES, F FAHRENHEIT FLEXIBLE CONNECTION IN PIPING ��O `��ONAL��p�o <br /> D. PROVIDE SHOP DRAWINGS AT NO ADDITIONAL COST TO VACUUM BREAKERS, REGULATORS, UNIONS, ETC. AS 1. ENERGY CODE: AS A MINlMUM, COMPLY WITH THICKNESSES FCO FLOOR CLEANOUTS O O <br /> THE OWNER. AND TYPES LISTED IN ENERGY CODE ENFORCED BY AHJ. FCU FAN COIL UNIT �00000� <br /> REQUIRED AND AS RECOMMENDED BY THE MANUFACTURERS. PIPING <br /> FD FLOOR DRAIN "A PIPE ANCHOR <br /> REFER TO PLUMBING FIXTURE CONNECTION SCHEDULE ON >0/>3/>7 <br /> 5. PLUMBING CONTRACTOR SHALL LOCATE AND COORDINATE FLR FLOOR ( - PIPE ALIGNMENT GUIDE <br /> EXACT LOCATION OF ALL PLUMBING EQUIPMENT WITHIN THE PLANS. FPM FEET PER MINUTE ss SANITARY SEWER ss) _ <br /> PW PUMPED WASTE i , <br /> STRUCTURE. FPS FEET PER SECOND F PIPE SUPPORT COPYRIGHT Oc zoo5, ALL RIGHTS RESERVED <br /> 2. HOT AND COLD: WATER PIPING CONNECTION TO EACH FS F�OOR SINK - - - - vENT (v) ,PS <br /> 6. ACCESS DOORS: COORDINATE WITH ARCHITECT AND LOCATE FIXTURE SHALL BE COLD WATER ON THE RIGHT HAND G GAS RL RAIN LEADER ��� VALVE STATION OR ASSEMBLY SUBMITTAL/REVISIONS <br /> ALL ACCESS DOORS ON SHOP DRAWINGS PRIOR TO SIDE AND HOT WATER ON THE LEFT HAND SIDE. GAL GALLONS �arE DESCRIPTION <br /> OL OVERFLOW RAIN LEADER # <br /> BEGINNING OF CONSTRUCTION. ACCESS DOORS IN FIRE GPG GRAINS PER GALLON ,� INDIRECT DRAIN, PIPE TO DRAIN <br /> 3. HOT WATER: NON-CIRCULATING HOT WATER PIPE SHALL CD CONDENSATE DRAIN �� �z/zo/�� BID SET <br /> RATED STRUCTURE SHALL BE FIRE RATED. VERIFY ACCESS , GPM GALLONS PER MINUTE <br /> DOOR LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO DRAWINGSEXCEED 10 UNLESS OTHERWISE SHOWN ON GWB GYPSUM WALLBOARD - Co�D wnTER (Cw) � � FLOOR DRAIN 1 03/28/18 PERMIT REVISIONS <br /> BIDDING. HB HOSE BIBB -- HOT wa�R, POTABLE, 120'� <br /> 7. ROOF PENETRATIONS: SEE ARCHITECTURAL DRAWINGS FOR 4. VENT STACKS: COORDINATE VENT STACK WITH HVAC HE�DV HOS�E END DRAIN VALVE - - - -�40- Hot wATER, POTABLE, TEMPERATURE �- HosE B�Be <br /> ROOF CAP, ROOF CURB, ROOF DRAIN, AND VTR DETAILS. EQUIPMENT TO MAINTAIN MINIMUM 10' CLEARANCE FROM HORIZ HORIZONTAL OTHER THAN 120� <br /> OUTSIDE AIR INTAKES. HP HORSEPOWER --- HOT WATER CIRCULATING (HWC), POTABLE, � �- BREAK IN PIPING OR DUCTWORK <br /> 8. EXPOSED PIPING: PROVIDE CHROME PLATING FOR EXPOSED HPCW HIGH PRESSURE C❑LD WATER �2of <br /> PIPING IN FINISHED ROOMS. 5. CLEANOUTS: PROVIDE CLEANOUTS PER CURRENT UPC AND HVAC HEATING, VENTILATING, AND <br /> AS REQUIRED BY LOCAL JURISDICTIONS. CLEANOUTS SHALL AIR CONDITIONING - " " -�40- HOT WATER CIRCULATING, POTABLE, P�MP <br /> 9. PENETRATIONS: PROVIDE ESCUTCHEON PLATES FOR BE LOCATED IN WALLS/FLOORS WHERE THEY ARE NOT HW HOT WATER TEMPERATURE OTHER THAN 120'F <br /> EXPOSED PIPING PENETRATIONS AND SHEET METAL HIGHLY VISIBLE. FLOOR CLEANOUTS IN CARPETED AREAS TO HWC HOT WATER RE-CIRCULATION FOF FUE� OIL FILL � PRESSURE GAUGE <br /> FLASHING FOR EXPOSED DUCTWORK PENETRATIONS. BE FITTED WITH CARPET INSERTS. LOCATIONS SHALL BE HX HEAT EXCHANGER Fos FUEL OIL SUPPLY � <br /> SUBMITTED TO ARCHITECT FOR APPROVAL. NOTE: NOT ALL ID INDIRECT DRAIN, INSIDE � THERMOMETER <br /> 10. SHAFT AND PLENUM CONNECTIONS: SEAL CONNECTIONS TO CLEANOUTS ARE SHOWN ON THE PLUMBING DRAWINGS. DIAMETER FOR FUEL OIL RETURN <br /> AIR SHAFTS AIRTIGHT. PROVIDE AIRTIGHT SEAL AROUND IE INVERT ELEVATION �'P/T PRESSURE/TEMPERAIURE <br /> 6. SUDS RELIEF: PROVIDE SUDS RELIEF IN ACCORDANCE WITH - -Fov - - FUE� O�l. vENT TEST PORT <br /> PENETRATIONS IN AIR PLENUMS. CURRENT CPC. KS KI CHEN SINK - -RV- - RELIEF VENT --pQ�l\pa-- REDUCED PRESSURE BACKFLOW <br /> 11. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF KW KILOWATT G NATURAL GAS RPBP PREVENTER <br /> MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING 7. SHUT-OFFS: PROVIDE 1/4 TURN BAL� VALVE ANGLE STOP L LONG, LENGTH _�����_ <br /> FIXTURES FOR REMOVAL AND REPLACEMENT. SHUT-OFF VALVES AND BRAIDED STAINLESS STEEL FLEX LAV LAVATORY DOUBLE CHECK VALVE ASSEMBLY <br /> CONNECTORS AT HOT AND COLD WATER SUPPLY TO EACH LB POUND � IRRIGATION DCVA <br /> 12. CABLE TRAYS: PIPING INSTALLED ADJACENT TO ELECTRICAL FIXTURE. EXCEPTION: PROVIDE SCREWDRIVER STOPS AT MBH THOUSAND BTU PER HOUR <br /> CABLE TRAYS SHALL ALLOW MINIMUM ACCESS OF 6" ABOVE BATH/SHOWERS. MECH MECHANICAL , <br /> AND TO THE SIDE OF CABLE TRAYS. MCA MIN. CIRCUIT AMPACITY • <br /> 8. TUB SPOUTS SHALL BE THREADED (NO PUSH-ON FITTINGS). MOCP MAX. OVER CURRENT '�"� <br /> 13. MOTORS: COMPLY WITH ENERGY CODE ENFORCED BY AHJ PROTECTION U� <br /> FOR MINIMUM EFFICIENCIES UNDER FULL LOAD. 9. TRAP ARMS: PROVIDE TRAP ARMS SUCH THAT THE MPG MEDIUM PRESSURE GAS <br /> MAXIMUM LENGTH WILL NOT EXCEED CODE REQUIREMENTS. MTD MOUNTED � <br /> 14. ACCESS CLEARANCES FOR MAINTENANCE AND OD OUTSIDE DIMENSION/DIAMETER � <br /> REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT 10. ADA INSULATION: AT PLUMBING PIPING EXPOSED UNDER OVERFLOW DRAIN/DECK DRAIN <br /> TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. LAVATORIES, INSULATE THE EXPOSED PIPING AND TRAPS OPNG OPENING N <br /> COORDINATE LOCATIONS OF MECHANICAL WORK AND WORK WITH PRODUCT SPECIFICA�LY DESiGNED FOR THIS P PUMP DRAWINGS ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. (Y� <br /> OF OTHER TRADES TO PROVIDE ACCESS CLEARANCES FOR APPLICATION MEETING ADA REQUIREMENTS. PROVIDE PD PRESSURE DROP, PUMPED THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR <br /> SERVICE AND MAINTENANCE. HANDI-LAV GUARD OR EQUIVALENT. OFFSET P-TRAPS TO DRAIN DIMENSIONS. REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS � <br /> CLEAR WHEELCHAIR ACCESS. POC POINT OF CONNECTION AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS, AND MATERIALS <br /> COORDINATION REOUIREMENTS PRV PRESSURE REDUCING VALVE NECESSARY FOR A COMPLETE SYSTEM. <br /> 11. GAS EQUIPMENT: GAS EQUIPMENT SHALL BE INSTALLED PER PRESSURE RELIEF VALVE ^,� <br /> 1. IRRIGATION: COORDINATE WITH IRRIGATION CONTRACTOR FOR EQUIPMENT LISTINGS, LOCAL CODES, AND NFPA. PS PUMPED STORM DRAINAGE W { <br /> THEIR WATER SUPPLY REQUIREMENTS AND LOCATIONS. PSIG POUNDS PER SQUARE INCH > <br /> 12. GAS CONNECTIONS: INSTALL FLEXIBLE QUICK DISCONNECT GAUGE <br /> 2. GAS: CONTRACTOR/GAS COMPANY SHALL FINALIZE GAS ASSEMBLIES FOR ALL GAS FIRED KITCHEN EQUIPMENT PER PW PUMPED SANITARY WASTE � � z <br /> METER AND GAS SERVtCE LOCATIONS. LOCAL JURISDICTIONS. RD ROOF DRAIN .�.J (� <br /> REF REFERENCE � � � <br /> 3. UTILITIES: COORDINATE WITH SITE UTILITY CONTRACTOR AND 13. WATER HAMMER ARRESTERS: PROViDE AT THE END OF HOT PRBP REDUCED PRESSURE D RAW I N G I N D EX C� ^, � <br /> CIVIL DRAWINGS FOR UTILITY CONNECTIONS AND AND COLD WATER LINES SERYING TWO OR MORE FIXTURES; BACKFLOW PREVENTER W z <br /> EXTENSIONS. SIZE IN ACCORDANCE WITH PLUMBING AND DRAINAGE RPM REVOLUTIONS PER MINUTE � _ <br /> INSTITUTE (PDI) REQUIREMENTS. WATER HAMMER ARRESTORS SCH SCHEDULE � � <br /> 4. ROOF DRAINAGE: COORDINATE WITH GENERAL CONTRACTOR ARE REQUIRED FOR QUICK CLOSING VALVES, SUCH AS SCW SOFTENED COLD WATER � � Q <br /> FOR ROOF DRAIN AND OVERFLOWS, SCUPPER DRAINS, <br /> LAUNDRY WASHERS, FLUSH VALVES (PUBLIC TOILETS), ETC. SD STORM DRAIN � � > <br /> AND CONDENSATE DRAINS. SF SQUARE FOOT � <br /> 14. TRAP PRIMERS: PROVIDE TRAP PRIMERS AND PIPING FOR SO STORMROVERFLOW O �l � <br /> 5. PLUMBING FIXTURES: COORDINATE WITH ARCHITECTURAL AND DRAINS AND FLOOR SINKS. ARRANGE PIPING TO ACHIEVE � ` <br /> OTHER TRADES EXACT LOCATION OF ALL PLUMBING EQUAL FLOW TO EACH DRAIN AND FLOOR SINK FOR TRAP SP STATIC PRESSURE i N CLU D ED I N SET � � Q W <br /> FIXTURES. PRIMERS SERVING MULTIPLE DRAINS AND FLOOR SINKS. SR SUDS RELIEF � � <br /> SS STAINLESS STEEL, W <br /> 6. PIPING: COORDINATE WITH STRUCTURAL FOR EXACT 15. P-TRAPS: ALL EXPOSED P-TRAPS SHALL BE SANITARY SEWER M � a Q W > <br /> LOCATION OF ALL STRUCTURAL FRAMING AND FOOTINGS CHROME-PLATED BRASS. SQ SQUARE � � � <br /> AND FINALIZE THE EXACT ROUTING OF ALL PIPES WITH TYP TYPICAL � N o� o 00 � W <br /> STRUCTURAL AND AT THE SITE PRIOR AND DURING THE 16. PROVIDE BALL VALVES. GATE VALVES SHALL NO BE USED. UH UNIT HEATER � N �� �N � <br /> CONSTRUCTION. NO EXCEPTIONS. UON UNLESS OTHERWISE NOTED W � a� �� <br /> V VENT � w �N ��' <br /> VTR VENT THRU ROOF ~ `� \ <br /> m m M <br /> W WASTE, WATT, WIDE w m w w <br /> WC WATER CLOSET a � � X <br /> wco WALL CLEANOUTS DWG DESCRIPTION (� <br /> WH WA�L HYDRANT P0.00 LEGEND, GENERAL NOTES & DRAWING INDEX X X X X ' <br /> WM WASHING MACHINE P0.01 PLUMBING SCHEDULES & CALCULATIONS X X X X � <br /> P2.B1 UNDERSLAB PLU BING PLAN X X X X Z <br /> APPLICABLE CODES PRE-CON MEETING NOTES PIPE MATERIALS P2.B2 P02 PLUMBING PLAN x x X x _ . <br /> P2.1 P01 PLUMBING PLAN X X X X <br /> P2.2 SECON FLOOR PLUMBING PLAN X X X X - � <br /> P2. THIRD FLOOR PLUMBING PLAN X X X X V� <br /> P2.4 FOURTH FLOOR PLUMBING PLAN X X X X � <br /> THESE DRAWINGS ARE BASED ON THE FOLLOWING CODES: P2.5 FIFTH FLOOR PLUMBING PLAN X X X <br /> CONTRACTORS SHALL ATTEND A PRE-CONSTRUCTION MEETING WITH THE ENGINEER FOR THE PURPOSE OF REVIEWING THE ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED P2.6 SIXTH FLOOR PLUMBING PLAN x x x x <br /> -2015 WASHINGTON STATE BUILDING CODE wsBC WORK PRIOR TO ORDERING ANY EQUIPMENT OR PERFORMING ANY WORK. THE MEETING SHALL BE LOCATED AT THE PROJECT BY AN APPROVED LISTING AGENCY. P2.7 SEVENTH FLOOR PLUMBIN PLAN x x x x �-- <br /> � ) P2. ROOF LUMBING LAN X X X X O <br /> -2015 INTERNATIONAL MECHANICAL CODE (IMC) SITE ON A DATE AND TIME TO BE MUTUALLY AGREED. THE MEETING WILL BE A WORKING SESSION. THE MEETING WILL BE 1. UNDERGROUND SERVICE ENTRANCE PIPING: <br /> -2015 UNIFORM PLUMBING CODE (UPC) FACILITATED BY THE ENGINEER AND THE AGENDA WILL INCLUDE A DETAILED REVIEW OF THE PLANS AND SPECIFICATIONS, COPPER, TYPE K. PLASTIC WRAP UNDERGROUND P3.0 NLAR ED ROOM P AN x x x <br /> -2015 WASHINGTON STATE EIdERGY CODE (WSEC) CROSS CHECK WITH OTHER TRADES FOR COORDINATION (SSUES, REVIEW OF PROPOSED PRODUCTS, REVIEW OF PLANNED WATER SUPPLY PIPING TO PREVENT CORROSION p4.1 WATER SU PLY DISTRIBUTION DIAGRAM X X X X � <br /> MEANS AND METHODS,AND ON-SITE INVESTIGATION OF FIELD CONDITIONS RELATIVE TO EXISTING CONDITIONS THAT COULD P4.2 WATER SUPPLY DISTRIBUTION DIAGRAM x x x x <br /> 2a. ABOVEGROUND WATER DISTRIBUTION PIPING: P4.3 GUES OOM WASTE & VENT DIAGRAM X X X X "' <br /> AFFECT THE WORK. PERSONS ATTENDING THE MEETING SHALL BE KNOWLEDGEABLE OF THE PROJECT AND SHALL BE THE COPPER, TYPE L 4..4 GUESTROOM WASTE & VENT DIAGRAM x x x x <br /> SPECIFIC PERSONS INTENDED TO CONTINUE WITH THE PROJECT THROUGH TO COMPLETION. IF REQUIRED, REVISED PLANS WILL P4.5 GUESTROOM WAS & NT DIAGRAM x x x x � � <br /> BE ISSUED THROUGH OFFICIAL CHANNELS. CHANGES IN THE BID PRICE WILL BE DISCUSSED, BUT NO CHANGE ORDERS WILL 2b. WATER SUPPLY RISERS TO GUESTROOMS: P4.6 GUESTROOM WASTE & VENT DIAGRAM x x x x z <br /> BE ISSUED UNLESS PROCESSED THOUGH OFFICIAL CHANNELS. IT SHALL BE UNDERSTOOD THAT THE ENGINEER HAS NO COPPER, TYPE L P4.7 GUESTROOM WASTE & VENT DIAGRAM x x x x <br /> AUTHORITY TO ISSUE CHANGE ORDERS. 2c. WATER SUPPLY RUNOUTS IN GUESTROOMS: PEX P5.0 DETAILS X X X X W . <br /> P5.1 D TAILS X X X r n <br /> THE FOLLOWING TRADES SHALL BE REPRESENTED FOR THE MINIMUM 3. UNDERGROUND WASTE AND VENT PIPING: SOLID w `,J <br /> CORE ABS, SCH. 40 F W <br /> TIME INDICATED: w <br /> 4. ABOVEGROUND WASTE AND VENT PIPING: CAST <br /> MECHANICAL SHEET METAL 4 HOURS IRON N N ---� <br /> PLUMBING/PIPING 4 HOURS 5. UNDERGROUND STORM PIPING: SOLID CORE ABS, <br /> ELECTRICAL 4 HOURS SCH. 40 DRAWN BY <br /> SPRINKLER 2 HOURS RJ <br /> GENERAL C❑NTRACTOR ALL SESSIONS 6. ABOVEGROUND STORM PIPING: CAST IRON <br /> 7. CONDENSATE DRAIN PIPING: COPPER TUBING, SHEET NUMBER <br /> TYPE M, OR CPVC <br /> 8. GAS PIPING: STEEL PIPE, ASTM A 53; TYPE E OR <br /> S; GRADE B; SCH. 40 <br /> ■ <br />