My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/01/06 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/01/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:01:34 PM
Creation date
1/12/2021 1:57:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br />Change Order No.: 24 <br />Change Order Effective Date: 11,-13--2020 <br />Kverett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br />Mayor or his designee is authorized to direct Contractor to perform additional work. In <br />calculating such threshold amounts, Washington State sales tax, if applicable to the <br />Work, has been considered. <br />2. The duration of the Contract shall be adjusted to the extent described in this Change <br />Order. <br />3. Contractor waives and releases any and all claims arising out of, or related to, this <br />Change Order, the work described in Exhibit A, and all work and actual or constructive <br />changes that occurred or began prior to the date of this Change Order, including, but <br />not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br />overhead, or inefficiencies. This provision does not apply to requests for equitable <br />adjustment of time or price for which the Contractor timely and properly provided <br />notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br />by the Contract Documents. If the Contract Documents establish a time period for <br />notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br />after the date of this Change Order, but relates to work performed prior to the date of <br />this Change Order, then this provision does not apply if the Contractor timely and <br />properly submits such notice <br />4. This Change Order only changes the contract between Contractor and City to the <br />extent explicitly provided herein. <br />CITY <br />Mayor <br />Date: <br />Attest: Approved As to Form: <br />City Clerk <br />Date: <br />City Attorney <br />Date: <br />.Recormended By: <br />Construction <br />Manager (if <br />applicable) <br />Project Rngineer (if Engineering <br />applicable) Manager (if <br />applicable) <br />Date: /2,-jhh"7_CW D. e: <br />Department Director <br />Date: <br />Page 2 of. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.