Project: Grand Avenue Park Bridge <br />Change Order No.: 24 <br />Change Order Effective Date: 11-13-2020_ <br />The four (4) bid items above are being deleted because the City of Everett Parks Department did not <br />wish to use any of the bulb plantings since they were to be planted in the fall, well past when all other <br />landscaping work had been completed. The Parks Department stated that all planting areas were very <br />full and may opt not to plant them at all. <br />New Item # A-340 - Eliminate Plant Selection Including Plant Establishment (PSIPE). The <br />contractor's landscape subcontractor, Out West Landscape and Irrigation Inc. asked to be relieved from <br />their PSIPE and warranty requirement on this project and offered a 30% credit to the City of Everett on <br />the PSIPE bid items Out West is an approved Condition of Award (COA) DBE subcontractor, and <br />this credit will not prevent the contractor from meeting COA DBE requirements on this project. <br />Agreeing to this change will enable the City of Everett to close out the project sooner, as the Parks <br />Department will take over for the landscape subcontractor's plant maintenance. <br />Condition of Award (COA) DBE Subcontractor Change <br />Out West Landscape and Irrigation is a COA DBE subcontractor with an original commitment of <br />$236,136.00. The commitment will be reduced by $10,778.10 $225,357.90. With added markup to <br />the prime contractor the total PSIPE reduction is $14,650.20 however, Out West will still surpass their <br />original commitment due to yet to be paid costs for landscaping work. <br />Interwest Construction, Inc will increase the commitment from another DBE subcontractor. See <br />attached change for Electric West at $10,778.10. These additions with prime contractor markup total <br />$14,650.20 and reflect actual Contract prices, therefore, the COA commitment will remain unchanged <br />at $2,255,219.00. <br />Total Cost of Changer Order # 24 <br />Deleted Bid Items: ($2,824.50) <br />New Item A-340: ($14,650.20) <br />Total Cost: (17,474.70) <br />Exhibit C—Additional Contract Time: <br />There is no additional time added to the Contract in Change Order # 24. <br />Page 4 of 4 <br />