Laserfiche WebLink
Architecture � Interiors <br /> � 2 3 4 5 s 7 s s �o Planning � Engineering <br /> 237'-10" <br /> 28'-10" 22'-0" 30'-0" 30'-0" 27'-0" 29'-0" 30 —0 27'-0" 14'-0" <br /> Portland,OR <br /> 503.224.956Q <br /> PHARMACY Vancouver,WA <br /> STORAGE <br /> 116 360.695.7879 <br /> Seattle, WA <br /> SEAFOOD <br /> COOLER UNISEX � � <br /> ��� ��� www.mcknze.com <br /> i <br /> E � � � � � � � , _ E MACKENZI E� <br /> WOMEN MEAT ( COOLER <br /> � i <br /> 110 SEAFO D MEAT PREP � COOLER GROCERY DESIGN DRIVEN 1 CLIEN7 FOCUSED <br /> STOCK PRODUCE � 123 Client <br /> -� PREP 114 117 PREP KROCER NW REC�ON <br /> 112 �21 122 3701 S NORFOLK ST <br /> � , � <br /> , � � �. ., <br /> , . . — - —— ; �., ;- - - . 301 <br /> �_a___ _ __ ___________d � tr_� �� <br /> o ��� I p'"�T�" j ' � PHARMACY DAIRY GROCERY SEAm'E' WA 98118 <br /> � MEN � � � 118 COOLER FREEZER <br /> � 109 ` M �'T `'� 120 <br /> � \ SSi.q SE FLOL .' -=====119-====__ __,; <br /> �t � <br /> , , <br /> % � I 1(�;iJ �1� I ' I �_- ---- I �---- � <br /> � _ ---- <br /> I , . � , <br /> t � <br /> ��. ., - �.,. ,� <br /> � � 4 <br /> I ` I ` � I � . , I 2 °� I I . ` .;., � �.� <br /> \� � � <br /> � � � ' � � 4 <br /> �� � ,, �. \ . �.. `�. °�. , �.�. <br /> � � I i <br /> � <br /> p -- - --� - ---� - -- - � -- - -�- - --�-- - - -� - - - -- -- - - - - D �ualit�T ToUd Centers <br /> I I � FSR <br /> . : , , I <br /> 124 <br /> � � � � � .� � �, <br /> , � � <br /> ;,E � � <br /> � � t�y ► <br /> ^ ; . , � . <br /> O � i � � I � � ( Project <br /> i � GROCERY � QFC � S5Z EVERETT <br /> o , �,y , , � SALES , °�� � � � ' �� URBANMIX DECOR <br /> 0 128 .� <br /> i � . � I <br /> � , . , � <br /> _ ; �; I I � � <br /> � � � � I PnO��E <br /> co �i � � ,� .,� 12 5 ���� <br /> �- .� ```��.� ��� � � �� � <br /> . . � . w . .. <br /> . � �� �z <br /> I I i � �� I 4919 EVERGREEN WAY <br /> � - ---- — � - -- '-- -- - —I-- — - �- — — — - -- -- -- - � — — -�-- - -- C EVERETT, WA <br /> ,� . <br /> y �, � a�h" I , I � � �.� . � � I ���� `�. <br /> � � j .� <br /> ; . i \ <br /> , ��• <br /> , ', .. . <br /> , � . <br /> i ��' 1 i � � � ; i � B,aK�RY i �F�ERY i �I <br /> _ , � ,,. ,� 1�7 12t ' � <br /> � �J �r---� <br /> _ . __ � <br /> o � , <br /> � i _ . _ � i � <br /> � <br /> � � � . ' � i � <br /> . <br /> � �.. _�t 9I � <br /> .� .:, : <br /> ' ► , , � I ° <br /> I _ � _. � i � ;� f; ' � <br /> DELI ELI PREP � I ~ SBTOR GE B.1 <br /> COOLER 105 . � �, . �., �. , -- - - ---- <br /> ..� �,,,. ._ _ <br /> 10 7 ��\�.. � ! � <br /> g ,�:v i i �4�,,,. - -� - - -- �-- - - !� - - - � - � � Q <br /> � � � i I � <br /> I , � r I_ORAL I I <br /> i <br /> _ ENT'�2Y ' , PREP ,` ' �TRY , . ' <br /> ,. <br /> � �rl��R L� � �02 `'� ('�?� \ \ �.,�` . �� <br /> 1�.� �. '� �\. �`\ "�. , � `�. 'ti.. �. ''. <br /> � .., �., �0,� � , <br /> ----, <br /> q - - - i I I - - ' � � - � -- - - A <br /> 27'-0" 27'-0" 18'-0" <br /> 1 1.7 2.6 3.5 4.2 4.7 5.7 6.3 6.9 ?.8 8.8 10 <br /> ,2243 REGISTERED <br /> ARCHI CT <br /> c/ <br /> AR A ISON OA LAN <br /> STATE OF GTON <br /> � DEMOLITION FLOOR PLAN <br /> D1. 1/16°' _ ��-o,� <br /> C MACK N I <br /> 0 ALL RIGHTS RESERVED <br /> THESE DRAWINGS ARE THE PROPERTY OF <br /> MACKENZIE AND ARE NOT TO BE USED <br /> OR REPRODUCED IN ANY MANNER, <br /> WITHOUT PRIOR WRITTEN PERMISSION <br /> REVISIONS: <br /> Z <br /> 0 <br /> N� REVISIONS REVISION DELTA <br /> 5-i THIS CLOSING DATE <br /> �o SHEET <br /> GENERAL NOTES DEMC�LITION LEGEND <br /> A. THIS PLAN INDICATES A GENERAL DEMOLITION RECEIVING NEW, AND PREPARE WALL SUBS7RATES LOCATION, AND 2) BACK TO ORIGINAL LOCATION. Exisrlrvc To BE DEMOLisHED <br /> SCOPE OF WORK TO BE PERFORMED AND DOES TO RECEIVE FINAl. FINISHES. THESE ITEMS MUST ALSO BE SEISMICALLY <br /> NOT RELIEVE THE CONTRACTOR FROM OTHER J. COORDINATE REMOVAL AND STORAGE OF ALL (E) ANCHORED WHEN MOVED BACK TO ORIGINAL EXISTING FLOORING TO DEMOLISH (E) FLOOR FINISH <br /> INCIDENTAL DEMO WORK REQUIRED TO COMPLETE DOORS, EQUIPMENT AND FIXTURES TO BE LOCATION. DOWN TO CLEAN WORKING SHEET TITLE: <br /> THE BUILDING MODIFICATIONS AS SHOWN AND RELOCATED. U. FOR BOLLARDS TO BE REMOVED - DEMO SLAB REMAIN SURFACE <br /> REQUIRED BY THE CONTRACT DOCUMENTS K. PREP ALL DEMO'D FLOOR SLAB AREAS FOR FOR REMOVAL AND POUR BACK PER DEMOLITION <br /> INCLUDING BUT NOT LIMITED TO STRUCTURAL, CONCRETE POURBACK PER ASD. ASD-69/A5.1 WALL, DOOR, STOREFRONT, PLAN <br /> PLUMBING, REFRIGERATION> HVAC, ELECTRICAL, P. CONTRACTOR TO DEMO FIXTURES AND V. MODIFY (E) FLOOR CLEAN OUT HEIGHT FOR NEW °� EXISTING TO REMAIN ----�,, �------ SOFFIT/FASCIA, FIXTURE, <br /> THE OWNERS SCOPE OF WORK, FIXTURE PLAN, REFRIGERATION EQUIPMENT AS INDICATED IN THE FLOOR LEVEL WHERE REQUIRED. PATCH AND ETC. <br /> SIGNAGE & GRAPHICS AND DECOR. OWNER'S FIXTURE PLAN AND REFERENCE PLAN. REPAIR CONCRETE AS REQUIRED <br /> B. PROTECT FROM DAMAGE DURING CONSTRUCTION Q. CONTRACTOR TO DEMO ALL (E) INTERIOR W. COORDINATE ALL REFRIGERATION AND MEP EXISTING FASCIA/ROOF/ <br /> ALL (E) WALLS, FLOORS, CEILINGS> ETC. THAT SIGNAGE & GRAPHICS. SEE OWNERS SIGNAGE & TRENCHING REQUIRED IN (E) SLAB. POUR BACK OVERHANG ABOVE <br /> ARE TO REMAIN. GRAPHICS DRAWINGS FOR ANY (E) SIGNAGE TO PER ASD-69/A5.1. EXISTING SOFFIT ABOVE <br /> C. SCHEDULE AND PERFORM THE WORK SO THAT NO gE RETAINED AND RELOCATED. AT LOCATIONS <br /> DAMAGE OR INTERRUPTIONS TO TENANT SPACES yyHERE REMOVAL OF (E) SIGNAGE & GRAPHICS <br /> OUTSIDE THE AREAS OF WORK SHALL OCCUR. AND DECOR DAMAGES (E) SUBSTRATE TO <br /> D. PROVIDE TEMPORARY BRACING AS REQUIRED TO REMAIN, PATCH, REPAIR ANO PREP FOR NEW <br /> MAINTAIN STRUCTURAL STABILITY OF THE (E) DECOR. <br /> STRUC7URE DURING ALL PHASES OF R. WHERE GENERAL CONTRACTOR HAS DEMOLISHED <br /> CONSTRUCTION. PLUMBING, MECHANICAL OR ELECTRICAL ITEMS, <br /> E. PROVIDE TEMPORARY CONSTRUCTION BARRIERS LINES, CONDUITS, PIPES, FIXTURES ETC., PLUG <br /> AROUND PHASES OF DEMO AND NEW WORK SEE AND CAP PIPES, CONDUITS, LINES, ETC. BELOW DRAWN BY: KSY <br /> ASD-162A/A5.1 FLOOR, BEHIND FACE OF WALL AND ABOVE <br /> F. MAINTAIN EXITS AS REQUIRED BY AUTHORITY CEILING AS NECESSARY. PATCH AND REPAIR <br /> HAVING JURISDICTION DURING ALL PHASES OF FLOOR/WALL/CEILING AS REQUIRED. CHECKED BY: MAH <br /> DEMO AND CONSTRUCTION. S. CEILING DEMO NOT SHOWN, SEE RCP AND <br /> G. VERIFY THAT ALL PARTITIONS TO BE REMOVED ENLARGED SHEETS FOR FINISHED SCOPE OF SHEET <br /> ARE NON-LOAD BEARING PRIOR TO REMOVAL WORK. ALL DEMO REQUIRED TO ACHIEVE A <br /> AND NOTIFY ARCHITECT IF CONDITIONS ARE NOT COMPLETE AND FINAL PRODUCT TO BE INCLUDED <br /> AS INDICATED. IN CONTRACTOR'S SCOPE OF WORK. <br /> H. PATCH AND REPAIR ANY DAMAGED PORTIONS OF T. ALL FIXTURES EQUIPMENT, CASEWORK, <br /> THE BUILDING AND MATCH NEW SUBSTRATE TO ' <br /> (E) ADJACENT SURFACES. ALL SURFACES TO FURNITURE, AND SIMILAR ITEMS SHOWN ON THE <br /> RECEIVE NEW FINISHES AS NOTED PER FINISH FiXTURE AND/OR PHASING PLAN AS EXISTlNG TO � <br /> SCHEDULE AND PLAN. REMAIN, MUST BE MOVED BY CONTRACTOR A <br /> I. REMOVE (E) WALL FINISHES AND SHEATHING IF MINIMUM OF TWO TIMES: 1) TO A TEMPORARY <br /> , t..,� ���. �,����'�� <br /> `'��`�� " ����� ��� ��f'�1��� T� JOB N0. <br /> 2190421.00 <br /> PERMIT SET� SEPTEMBER 26, 201� <br />