CAUTION : F THIS SHEE-� S NOT 30�� x42�� T IS A REDUCED P1�1 �1 -� ,
<br /> DEM � LITION NOTES FINISH NOTES CEILING NOTES FLOOR PLAN N �TES FIRE AUTHORITY NOTES PRE-CONST. MEETING � r-� � ��
<br /> �
<br /> � � �--�
<br /> z �
<br /> Q W
<br /> 1. FWAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN o �
<br /> 1. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA 1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. 1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF NEW BUILDING 1. CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION ADVANCE. 1. PRIOR TO START OF CONSTRUCTION, A PRE-CONSTRUCTION MEETiNG IS TO BE �
<br /> SUPPLIED BY THE OWNER TO THE ARCHITECT. THE ARCHITECT MAKES NO STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. HELD INCLUDING A RESPONSIBLE REPRESENTATIVE OF THE ARCHITECT, THE OWNER z O �
<br /> WARRANTY, EITHER EXPRESS OR IMPLIED, FOR THE ACCURACY OF THE 2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. AND THE GENERAL CONTRACTOR. THE DISCUSSION WILL BE IN REGARDS TO THE � cCS
<br /> 2. THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING w
<br /> COMPLETENESS OF THE EXISTING INFORMATION RECORDED. THE CONTRACTOR FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR 2. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD.- SAME 2. CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION. ARCHITECT-OWNER-CONTRACTOR AOC CORRESPONDENCE PROCESSES AND � �v
<br /> BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE � )
<br /> SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. COLOR AND MANUFACTURER. STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT PROCEDURES. AT A MINIMUM, THE FOLLOWING IS TO BE DISCUSSED: w � �
<br /> IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS THAT MIGHT ARISE IN THE CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING 3. EXTEND ALI. STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N. STANDARDS. o
<br /> COURSE OF THE DEMOLITION WORK. PRODUCTS. 3. FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY 2 AOC REGULARLY SCHEDULED MEETINGS � � '
<br /> DISCREPANCIES ON PLANS. 4. ALL CONDUIT PIPWG IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL "
<br /> 2. VERIFY LOCATIONS OF EXISTING MECHANICAL, 3. AN UNOBSTRUCTED ALL-WEATNER FIRE APPARATUS ACCESS ROAD SHALL BE IN 2•1. WHEN ,,� U
<br /> PLUMBING AND ELECTRICAL 3. INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION CONSTRUCTION. 2.2. WHERE _
<br /> UTILITIES. LOCATE AND PROTECT UTILITIES TO REMAIN. DISCONNECT, REMOVE 4. WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES, PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SITE. �-- i
<br /> AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS OTHERWISE 2.3. HOW OFTEN
<br /> BACK TO NEAREST JUNCTION BOX OR PANEL, AS REQUIRED, AND CAP APPROVED OR NOTED. ETC. OCCUR ON THE ELECTRICAL ENGINEERING PLANS, THE ARCHITECTURAL 5. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN 2.4. IN PERSON VERSUS CONFERENCE CALLS � `'- �t
<br /> , „ 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF
<br /> DESIGNATED UTILITIES WITHIN THE DEMOLITION AREA. REFER TO THE PLANS SHALL GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR 0 -4 OF ADJACENT PERPENDICULAR PARTITION. 2.5. APPROXIMATE ALOTTED TIME PER MEETING � � .�
<br /> MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFO. CLARIFICATIONS. COMBUSTIBLE BUILDING MATERIALS TO THE SITE. o �
<br /> 4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE �
<br /> WITH STATE & LOCAL CODES. 6. CONTRACTOR SHALL USE 3-5/8" METAL STUDS MWIMUM AT ALL PLUMBING 5. ACCESS GATES SHALL BE APPROVED PRIOR TO WSTALLATION AND SHALL BE IN 3. CONSTRUCTION MEETING MWUTES m Q
<br /> 3. EXfSTING ELECTRICAL AND TELEPHONE OUTLETS LOCATED ON DEMOLISHED WALLS 5. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC., AND NOTIFY WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES COMPLIANCE WITH LOCAL FIRE AUTHORITY. 3.1. FORMAT FOR THE MINUTES � ..�
<br /> ARE TO BE REMOVED INCLUDING CONDUIT AND WIRING BACK TO JUNCTION BOX. 5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS, ETC. SHALL BE REPORTED TO THE ARCHITECT. 3.2. CONTRACTOR TO AUTHOR THE MINUTES o �
<br /> LOCATIONS ARE TO BE PATCHED AND REPAIRED TO BE FLUSH WITH ADJACENT CONDITION. � � _
<br /> WALL SURFACE. 6. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE 6. FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE ¢ �
<br /> 7. USE WATER RESISTANT GYPSUM BOARD FIBER BOARD AT ALL AREAS SUBJECT TO � �� 4. FORMAL CHANGES IN THE WORK �
<br /> INTERFERENCE MUST BE APPRQVED BY ARCHITECT PRIOR TO INSTALLATION. � PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4-0 �
<br /> 6. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL: MOISTURE OR WHERE TILE IS USED. 4.1. ADDENDA AND BULLETINS ISSUED BY THE ARCHITECT w a�
<br /> AND SPRAY BOOTH. �
<br /> 4. WHERE PLUMBING FIXTURES ARE BEING REMOVED OR WHERE EXPOSED PLUMBING 4.2. CHANGE ORDER REQUESTS ISSUED BY THE CONTRACTOR � J
<br /> A. THREE (3) 12" X 12" SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS 4.3. CHANGE ORDERS ISSUED BY THE CONTRACTOR
<br /> PIPES OCCUR, CAP LINES BEHIND FINISHED SURFACES. PATCH AND REPAIR AS VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH �• CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12" ABOVE THE CEILING GRID. 8. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL 7. FIRE SPRINKLER SYSTEM S AND ALL CONTROL VALVES, INCLUDING EXTERIOR ,,_ �
<br /> REQUIRED. � � 4.4. 1RACKING MECHANISMS
<br /> IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT CODES. SHALL BE SUPERVISED BY A U.L. �ISTED CENTRAL ALARM STATION OR PER �
<br /> SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICATION. $• NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING STATE & LOCAL FIRE CODES.
<br /> w
<br /> 5. ALL EXISTING CONSTRUCTION WHERE INDICATED INCLUDING ELECTRICAL, ALUMINUM FLEX, ALUMINUM CONDUIT, AND POT METAL CONNECTORS. 9. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING 5. REQUESTS FOR INFORMATION PROCESS �
<br /> TELEPHONE, PLUMBING AND MECHANICAL DEVICES NOT OTHERWISE INDICATED ON 5.1. TRACKING MECHANISM o '"
<br /> THESE CONSTRUCTION DRAWINGS SHALL BE REMOVED IN A CAREFUL MANNER SO B. ONE (1) 24" X 24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL DRAWINGS. 8. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER z o
<br /> FABRIC AND VINYL FINISHES AND COLOR. 9. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR 5.2. DEFINE Cc: RECIPIENT LIST c�
<br /> AS NOT TO DAMAGE ADJOINING CONSTRUCTION. SERVICE SHALL BE LOCATED OVER ACOUSTICAL CEILINGS. NO ACCESS HATCHES SYSTEMS AND WATER-FLOW SWITCHES ON AL� SPRINKLER SYSTEMS SHALL BE w v �r,
<br /> 10. ALL PLUMBING CLEAN-OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. 5.3. STANDARD RESPONSE TIMES (2-5 WORKING DAYS IS STANDARD) _ .� o
<br /> SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR �- '" o
<br /> G THREE 3 12" X 12" SAMPLES OF ALL FLOOR COVERING. CONTRACTOR SHALL COORDINATE ALL CLEAN-OUT LOCATIONS WITH EQUIPMENT, � o0
<br /> 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING � � ARCHITECT. (NO EXCEPTION) AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT MORE. 6. SUBMITTAL PROCESS � �
<br /> UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM W �
<br /> D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR FOR APPROVAL PRIOR TO INSTALLATION. 6.1. TRACKING MECHANISM �- -
<br /> DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR /QUALITY CONTROL. 9. ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER ALARM = Z o
<br /> 10. ALL SPRINKLER HEADS AT HARD-LID CEILINGS ARE T0 BE FULLY RECESSED AND � 6.2. ISSUANCE SCHEDULE BY THE CONTRACTOR c� v on
<br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT. � � � �
<br /> C O N J U N C T I O N W I T H T H E E X E C U T I O N O F H I S W O R K. 7. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT 1 1. A L L M I L L W O R K S H A L L C O N F O R M T O S T A T E & L O C A L W O O D W O R K I N G S T A N D A R D S. 6.3. DEFINE Cc R E CIPI ENT LI ST � � v � �
<br /> A R C H I T EC T URAL P AT TERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD 6.4. STAMPED REVIEWED AND APPROVED BY CONTRACTOR PRIOR TO SUBMISSION '" � �' o °`
<br /> BEFORE PLACING FULL ORDERS. , 10. INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE & 00 v ev, � `� � N
<br /> LOCATIONS FOR ARCHITECT S APPROVAL PRIOR TO INSTALLATION. 12. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITtONS PRIOR TO 6.5. NON-REQUESTED SUBMITTALS MAY NOT BE REVtEWED � 3 �
<br /> 7. ALL EXISTING BUILDING UTILITIES SHALL REMAIN IN OPERATION DURING LOCAL FIRE CODES. w .� '� 0 00
<br /> 8. S U B M I T S E A M I N G P L A N F O R A L L F L O O R F I N I S H E S T O A R C H I T E C T F O R A P P R O V A L FABRICATION. 6.6. STANDARD RESPONSE TIMES (7-10 WORKING DAYS IS STANDARD) 0° � � � v N � t� �'
<br /> CONSTRUCTION. PROVIDE REROUTING OF UTILITIES SERVING ADJACENT AREAS � a� .� o � � � � �o � '
<br /> THAT ARE TO MAINTAIN UNINTERRUPTED SERVICE. ANY TEMPORARY SUSPENSION 11. ALL GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. �
<br /> PRIOR TO ORDER. 11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION ¢ ¢, .� �n a� �ri
<br /> G.C. TO PROVIDE A SUBMITTAL WITH ALL LINEAR DIFFUSER LOCATIONS PRIOR TO 13. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE-PROTECTION �• SUBSTITUTIONS = � � ° � y o � � �
<br /> OF SERVICE SHALL BE COORDINATED AND APPROVED BY THE FACILITY MANAGER, INSTALLATION. APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY 7.1. REQUEST FORMS WITH REASONS AND BENEFIT FOR SUBSTITUTION U' � s� •� � � m � s�,�.,
<br /> NOT LESS THAN 24-HOURS IN ADVANCE. 9. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS � ,,
<br /> SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION. �
<br /> 8. THE CONTRACTOR WILL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL 12. LOCATE RECESSED DOWN LIGHTS WALL WASHERS, SMOKE DETECTORS EXIT SIGNS 8. PAYMENT APPLICATIONS
<br /> 10. ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER ' „ „ � � a
<br /> UTILITY COMPANIES UNLESS OTHERWISE NOTED IN THE PLANS AND SPEAKERS, FIRE SPRINKLERS ETC. IN CENTER OF 24 x24 CEILING TILES OR IN 14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND 8.1. PROCESS
<br /> ENCLOSURES, ETC., SHALL BE SEMI-G�OSS, U.O.N. � 12. LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN w
<br /> CENTER OF 24"x24" PORTION OF 24"x48" CEILING TILES, UNLESS OTHERWISE IN-WALL SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS. 8.2. SUBMITTAL DATE
<br /> SPECIFICATIONS. ALL FINAL INSTALLATION HEIGHTS FOR lN-WALL SUPPORT BRACKETS MUST MEET ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO 8.3. ANTICtPATED TURN-AROUND �
<br /> 11. WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT-IN FREE OF NOTED. THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION o
<br /> 9. THE DEMOLITION PLAN KEYNOTES ARE DIAGRAMMATIC AND GENERAL IN NATURE. OVERLAPPING. ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS FROM FIRE DEPARTMENT PRIOR TO ORDERING.
<br /> THE INTENT IS TO ILLUSTRATE THE COMPLETE DEMOLITION OF THE SPACES 13. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES. INCLUDED. 9. PUNCH LISTS Z
<br /> INDICATED UNLESS NOTED OTHERWISE. FIELD VERIFICATION OF EXISTING 12. PRIOR TO THE INSTALLATION OF WALL COVERiNGS, SURFACES SHALL BE ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY ELECTRICAL 9.1. ONLY ONE PUNCH WALK TO BE PROVIDED BY DESIGN TEAM Q
<br /> ENGINEER. 15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING, 13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF: g,2, CONTRACTOR TO PUNCH AND MAKE CORRECTIONS OR CREATE A MINIMAL �i
<br /> CONDITIONS AND SPECIFIC QUANTITIES IS THE RESPONSIBILITY OF THE PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. 2-A-106:C (FOR OFFICE OR 10-A-80B:C FOR WAREHOUSE SHAL� BE F- o
<br /> CONTRACTOR. BACK-UP PLATES AND/ OR SUPPORTING BRACKETS AS REQUIRED FOR THE �° � �� LIST OF CORRECTIONS PRIOR TO DESIGN TEAM PUNCH. � �
<br /> 14. WHERE EXIT StGNS ARE REQUIRED PER STATE & LOCAL CODES, THEY SHALL BE INSTALLATION OF WALL-MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. PROVIDED WITHIN 75'-0" MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE g.3. A FINAL WALK WILL OCCUR ONLY IF 7HE ARCHITECT IS CONTRACTED TO DO
<br /> 13. CONTRAGTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TO RECEIVE m � •
<br /> 10. REMOVAL AND DISPOSAL OF DEMOLITION DEBRIS IS THE RESPONSIBILITY OF THE NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE. CONTRACTOR IS ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY FEET OR PORTION THEREOF ON EACH FLOOR. Sp. o
<br /> � �
<br /> CONTRACTOR. VERIFY THE HAULING ROUTE THROUGH THE BUILDING, THE RESPONSIBLE FOR ALL FLOOR PREPARATION. COORDWATED WITH THE ARCHITECT. CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. w z ;
<br /> 14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, = o �
<br /> DEMOLITION STAGING AREA, AND THE LOCATION OF THE DUMPSTERS WITH THE FLAMMABLE AND COMPRESSED GASES AND OTHER HAZARDOUS MATERIALS SHALL ~ � �� �
<br /> 15. PROVIDE BACK-UP POWER FOR EXIT SIGNS PER STATE & LOCAL CODES. 16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING � z Q a4
<br /> OWNER PRIOR TO THE START OF DEMOLITION. DISPOSAL OF RUBBISH SHALL BE 14. ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, U.O.N. COMPLY WITH STATE & I.00AL FIRE CODES. THE STORAGE AND USE OF o � �� o�
<br /> DONE fN A LEGAL MANNER. ' SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES & �
<br /> 16. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO I N T R T I � �
<br /> 15. WHERE FLOOR-MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA CUT ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL G . C . S U C C! N S c�
<br /> >� » � TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S '� w
<br /> 11. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY DEMOLISHED ITEM. VERIFY CARPET IN AN X OVER FLOOR HOLE AND INSTALL CARPET OVER TOP. DO NOT AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS APPROVAL IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. w �
<br /> ITEMS TO BE SALVAGED WITH THE OWNER PRIOR TO THE START OF DEMOLITION. TRIM CARPET. OCCUPIED. �
<br /> REMOVE, PROTECT, CLEAN, REPAIR FOR REUSE AND TURN OVER SUCH ITEMS AS 17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH 15. BUILDING(S) NOT APPROVED FOR HIGH-PILED STOCK (MATERIALS IN CLOSELY SUBMITTALS m
<br /> DIRECTED BY THE OWNER. 16. ALL V.GT. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND PACKED PILES OR ON PALLETS, OR IN RACKS WHERE THE TOP OF STORAGE
<br /> FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.O.N. 17. EMERGENCY LIGHTING SHALL BE {2) SEPARATE SOURCES OF POWER AND SHALL ARCHITECT BEFORE INSTALLATION. PROVIDE ADDITIONAL FIRE EXTINGUISHERS & �
<br /> EXCEEDS 12'-0" IN HEIGHT, AND 6'-0" FOR GROUP "A" PLASTICS AND CERTAIN 1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS
<br /> 12. IN ORDER TO INSTALL SOME OF THE NEW WORK INCLUDING, BUT NOT LIMITED COMPLY WITH THE NEG CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS. Q
<br /> � AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG =
<br /> TO MECHANICAL, PLUMBING OR ELECTRICAL IT WILL BE NECESSARY FOR THE 17. PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. OTHER HIGH-HAZARD COMMODITIES). HIGH-PILED STOCK SHALL BE APPROVED
<br /> � BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEWG STORED ON SITE. A SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE �' � O
<br /> 18. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR 18. CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR o
<br /> CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE (OR DUCTS PENETRATING FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR T0 INSTALLATION. SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH-PILED STORAGE IN STANDARD 7-10 DAYS. zQ Q �
<br /> REFINISH EXISTING WALLS, FLOORS, OR CEILING IN THE AREAS OF THE BUfLDING 18. CONTRACTOR SHALL PROVIDE PRE-FORMED RUBBER BASE CORNERS. DO NOT
<br /> � SURFACES, AND AS REQUIRED BY THE FIRE DEPARTMENT. ACCORDANCE WITH STATE & LOCAL FIRE CODES. N (�
<br /> NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. 2. A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A
<br /> 19. ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL Z
<br /> COSTS IN HIS BASE BID, WFiETHER SHOWN ON THESE PLANS OR NOT. 19. MILLWORK LOWER CABWETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED 16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION. � W .
<br /> 19. CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, HAVE DIRECTIONAL EXIT SIGNS. v>
<br /> ON FINISH PLANS. AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPL(CABLE w �
<br /> 13. PROTECT ADJACENT SPACES NOT SCHEDULED FOR DEMOLITION. PATCH AND CODES. 20. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTFD 17. ALL REQUIRED F►RE DOORS SHAL� BEAR A LABEL FROM A RECOGNIZED AGENCY �
<br /> REPAIR DAMAGED FINISHES, ITEMS AND FIXTURES TO REMAIN AND/OR REPLACE » �, ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND. SHOWING THE SPECIFIC RATING. 3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND o � �
<br /> 20. FLOOR FINISHES TO CONTINUE UNDERNEATH OPEN FLOOR AREAS OF MILLWORK, SIGNATURE BY THE GENERAL CONTRACTOR PRIOR TO SUBMISSION. THE REVIEW o
<br /> IN KIND TO MATCH EXISTING FROM DAMAGE DURING THE PROGRESS OF THE 20. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE w
<br /> 1NCLUDING SINK AREA AND AT ALL UNDER-COUNTER EQUIPMENT AREAS WHICH WILL INCLUDE BUT NOT BE LIMITED T0: -� �
<br /> WORK. PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE AND AS FIXTURES COME IN DIRECT CONTACT WITH INSULATION. 21. UNLESS OTHERWISE NOTED ALL GYPSUM BOARD SURFACES WALLS AND CEILINGS 18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO AL� APPLICABLE BUILDING ¢
<br /> INDICATED TO INSURE PUBLIC SAFETY AND TO ALLOW BUILDING OCCUPANCY. ARE OPEN TO THE FLOOR. ' » ' � AND FIRE CODES. 3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE c� O -
<br /> SHALL BE TAPED, SANDED SMOOTH TO A "LEVEL 4 FiNISH, SO AS TO RECEIVE CONTRACT DOCUMENTS. �' �
<br /> CONTRACTOR TO SUBMIT FOR APPROVAL, BARRIER LOCATIONS, AND METHOD OF 21. EXIT S1GNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES PAINT OR WALL COVERING MATERIAL. � �
<br /> 21. FLOORS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND 3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES w
<br /> C O N S T R U C T I O N T O T H E A R C H I T E C T P R I O R T O I N S T A L L A T I O N. A N D S H A L L B E C O N N E C T E D TO AN EMERGENCY POWER SYSTEM BATTERIES, UNIT 1 9. E X I T D O O R S S H A L L B E O P E R A B L E F R O M T H E I N S I D E W I T H O U T T H E U S E O F A K E Y � 0
<br /> STRUCTURAL DRAWINGS. IN RATED FLOOR CONDITIONS, CONFIRM REMAINING FLOOR � OR ANY SPECIAL KNOWLEDGE OR EFFORT. 3.3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE o U N
<br /> 14. NO STRUCTURAL ELEMENTS ARE INCLUDED IN THIS SCOPE OF WORK. THICKNESS STILL CONFORMS TO MINIMUM RAI�ING REQUIREMENT. EQUIPMENT OR AN ON-SITE GENERATOR) THAT WILL AUTOMATICALLY ILLUMINATE 22. PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY, w Q �
<br /> THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUETS. STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC c�
<br /> 20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION 4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE Z W � � �
<br /> 22. CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW ENVELOPE, U.O.N. THROUGH MATHEMATICAL MEANS �ROM INFORMATION ALREADY PROVIDED ON THE '-�
<br /> 15. PROVIDE DUST BARRIERS AROUND OPENINGS, TO AND FROM THE CONSTRUCTION SYSTEM PER APPLICABLE CODES WCLUDING IF NECESSARY FIR HORNS, STROBE o
<br /> CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS CONTRACT DOCUMENTS WILL NOT BE PROVIDED. '-'-' J Z
<br /> AREA. PROVIDE ALL MEANS NECESSARY TO INHIBIT DUST FROM ENTERING , 23. PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL � �
<br /> OTHER POR110NS OF THE FACILITY. SUBMIT BARRIER LOCATIONS TO THE WITH FLOORING MANUFACTURE S RECOMMENDED MAXIMUM CONTENT FOR AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. � O
<br /> ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION. WARRANTIES AND ADHESIVE PRODUCTS. 5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT �- � •y
<br /> M I L LW4 R K N OT E S oR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS & BE REVIEWED AT THE DESIGN TEAMS DISCRETION, w � ~
<br /> 16. PROVIDE ADEQUATE SHORING, , 23. PRIOR TO NEW FLOORING INSTA�LATION REMOVE EXISTING FLOOR FINISHES. PATCH ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE Q �
<br /> BRACING BARRICADES AND PROTECTIVE MEASURES � �
<br /> AND REPAIR SUB-FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND z
<br /> AS REQUIRED TO SAFELY EXECUTE THE WORK IN THE CONSTRUCTION AREA AND n �
<br /> SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING D O O R N V T E S ¢
<br /> THE AREAS ADJACENT TO THE CONSTRUCTION AREA. CEASE OPERATIONS AND REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPLICABLE BUILDING CODES. 1, CONTRACTOR MUST NOTIFY ARCHITECT DESIGNER OF ANY DISCREPANCY IN 6. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCHITECT AND ARE NOT TO BE m =
<br /> � FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH SENT DIRECTLY TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED � W �-
<br /> NOTIFY THE ARCHITECT IMMEDIATELY IF THE STRUCTURE APPEARS TO BE PLANS. FINISH ITEMS CLEARLY SHOWN ►N PLANS BUT OMITTED FROM SCHEDULES EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH.
<br /> ENDANGERED. DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEASURES NAVE 24. ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIAL OR LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. BY THE ARCHITECT. � � � CI�
<br /> BEEN TAKEN. SPECIFICATION TYPES ARE TO BE A FLUSH TRANSITION. z Q
<br /> CONTRACTOR TO VERIFY OMITTED FINISHES WITH ARCHITECT OR DESIGNER PRIOR o � �
<br /> 25. FEATHER SUB-FLOOR UP FOR A TILE FLOORING TO CARPET AND B VINYL TO ORDERING PRODUCTS. 1. VERIFY THAT ALL DOORS AND DOOR HARDWARE MEET THE REQUIREMENTS OF ALL z
<br /> 17. CONTRACTOR SHALL MAINTAIN REQUIRED MEANS OF EGRESS AND ENSURE THAT ) ) GOVERNING CODES & STANDARDS. NOTIFY THE ARCHITECT IMMEDIATELY IN CASE �• MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S � Q �
<br /> EXIT ROUTES ARE SIGNED, LIGHTED AND PROTECTED IN ACCORDANCE WITH CODE FLOORING TO CARPET, FOR FLUSH INSTALLATION. 2. SHOP DRAWINGS MUST BE PROVIDED FOR APPROVAL PRIOR TO FABRICATION TO REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR � ,
<br /> REQUIREMENTS. RELOCATE EXISTING AND/OR PROVIDE SMOKE PROTECTORS AND THE ARCHITECT. CABINETMAKER SHALL USE ON SITE FIELD FRAMING DIMENSIONS Q OF DISCREPANGY. SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW Z W
<br /> LIFE SAFETY EQUIPMENT FOR ADEQUATE COVERAGE. 26. INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING FOR ALL SHOP DRAWINGS AND FABRICATIONS. ANY SUBSTITUTIONS TO THE POWE R V� S I � NAL N OTES AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. w > �"
<br /> TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT FOLLOWING SPECIFICATIONS MUST BE APPROVED BY THE ARCHITECT PRIOR TO 2. FIELD MEASURE, AS REQUIRED, ALL DOORS PRIOR TO FABRICATION. � Q w
<br /> 18. PROVIDE TEMPORARY NON-COMBUSTIBLE CONSTRUCTION BARRIERS WHERE FLOOR TYPES MEET, VERIFY COLOR. FABRICATION. � � W � ��
<br /> REQUIRED BY CODE AND THE GOVERNING FIRE AUTHORITY. MINIMUM 3. PROVIDE A SIGN ON OR NEAR THE MAIN EXIT DOOR READING: W
<br /> "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED". m
<br /> REQUIREMENTS: 27. CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER 3. CABINET MAKER TO COORDINATE & VERIFY WITH CONTRACTOR FINAL LOCATION REQUESTS FOR INFORMATION (RFI�S� � � >
<br /> MANUFACTURER'S SPECIFICATIONS AND SEAL ALL VINYL FLOORS PER FOR CANTILEVERED COUNTERS FOR 1N-WALL SUPPORT BRACKETS PRIOR TO 1. COORDINATE TELEPHONE/DATA INSTALLATION WITH APPROPRIATE � Q W
<br /> � SUB-CONTRACTOR. 4. VERIFY THAT EXISTING DOORS COMPLY WITH ACCESSIBILITY REQUIREMENTS. 1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE RFI's AND MAKE J �
<br /> A. FULL HEIGHT WALL FROM FLOOR TO CEILING. MANUFACTURER'S MAINTENANCE SPECIFICATIONS. GYPSUM BOARD FINISHING OF WALLS. ALL FINAL INSTALLATION HEIGHTS FOR ¢ �
<br /> B. STUDS AT 24" O.C., WITH 5/8" TYPE 'X' GYPSUM BOARD. IN-WALL SUPPORT BRACKETS MUST MEET ALL APPLICABLE ACCESSIBILITY CODES EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM. �
<br /> ' AND STANDARDS WITH COUNTER TOP MATERIAL THICKNESS INCLUDED. 2. ALL EXISTING ELECTRICAL DEVICES ARE TO REMAIN, UNLESS NOTED OTHERWISE. 5. RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES & w �
<br /> C. NON-COMBUSTIBLE ACCESS DOOR WITH (3) HINGES AND SPRWG CLOSER. 28. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER S SPECIFIED CARPET STANDARDS AND SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWING �
<br /> INSTALLATION INSTRUCTIONS. USING ADHESIVES AND INSTALLATION METHODS 3. ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE THE SPECIF�C RATINGS. 2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S � �
<br /> 19. SURVEY EXISTING FLOORS AND CLEARLY MARK ON FLOOR SURFACE THE REQUIRED INSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET 4. MATERIAL COLORS NOT LISTED SHALL BE REQUESTED FROM ARCHITECT/INTERIOR = -
<br /> LOCATIONS OF ALL BEAMS AND JOISTS. MARK ALL CORE DRILL PENETRATIONS SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. DESIGNER ON SHOP DRAWING SUBMITTALS OR BY LETTER. POWER & SIGNAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR �-
<br /> OUTLET BOX. NON-DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST 6. ALL HARDWARE TO BE LEVER-TYPE PER GOVERNING CODES & ACCESSIBILITY SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW � � �
<br /> AND RECEIVE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO DRILLING CONCRETE. STANDARDS. O �
<br /> 29. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED 5. ALL UPPERS TO BE LAMWATED TO MATCH BASE CABINETS. BOTH UPPERS & WALL STUD. AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. Z
<br /> LOWER CABINETS IN WET AREAS TO HAVE MATCHING PVC EDGE ALL OTHERS TO ``' O
<br /> 20. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL. PNEUMATIC TOOLS RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION � 7. DOOR HANDLES, PULLS OR KNOBS SHALL BE INSTALLED AT 40" ABOVE FINISH �
<br /> ARE NOT ALLOWED WITHOUT PRIOR APPROVAL. METHODS REQUIRED TO MAINTAIN PRODUCT�S WARRANTY. HAVE PLASTIC LAMINATE EDGE BANDING U.O.N. 4. WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED W 5
<br /> FLOOR. ALL OTHER OPERABLE PARTS OF DOOR HARDWARE SUCH AS DEADBOLTS w V W
<br /> NO MORE THAN 2" APART. � � 3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A � ..
<br /> 21. ALL CORE DRfLLING OR OTHER NOISY WORK SHALL BE SCHEDULED 48-HOURS IN 30. FLOOR COVERING INSTALLER RE UIRED TO PROVIDE MINIMAL SEAMS JOINTS AT 6. ALL CABINETS AND DOORS SHALL BE CONSTRUCTED FROM 3/4" THICK MATERIAL, KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34" AND 44" ABOVE FINISH CURRENT COPY IS TO BE INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY a
<br /> Q � 5. ALL ELECTRICAL OUTLETS OF 30 AMPERES OR LESS SHALL BE MOUNTED BETWEEN FLOOR. IF EXISTING BUILDING STANDARD EXISTS, MATCH BUILDING STANDARD AND CRITICAL RESPONSE DUE DATES. m
<br /> ADVANCE WITH THE OWNER. ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE UNLESS APPROVED PRIOR TO EACH JOB. CONFIRM COMP�IANCE WITH ACCESSIBILITY REQUIREMENTS.
<br /> LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC, CARTS +15" TO BOTTOM RECEPTACLE AND +48" TO TOP OF RECEPTACLE FROM FINISH
<br /> 22. APPLY CEMENT BASE FLOOR PATCH AS REQUIRED TO FILL DINGS, NAIL HOLES, 7. ALL BASE CABINET ARE NOT TO RECEIVE WALL BASE UNLESS JNDICATED ON FLOOR. SEE NOTE 6, BELOW, FOR GENERAL MOUNTING HEtGHT 4. RFI's REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED o~-
<br /> CHIPS AND CRACKS. AND TO MAINTAIN PRODUCT'S WARRANTY. FINISH PLANS OR ELEVATIONS. 8. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. AND WILL BE REMOVED FROM THE RFI LOG. X
<br /> 6. ALL NEW WALL MOUNTED 15, 20, AND 30 AMP OUTLETS/RECEPTACLES TO BE 'l'
<br /> 31. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY 9. PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS.
<br /> 23. AT FLOOR AREAS SCHEDULED TO RECEIVE NEW FLOOR COVERING, REMOVE AND PROPERLY MEMBERED AND ALIGNED SO AS TO LEAVE NO EVIDENCE OF 8� ALL INTERIORS OF CLQSED CABINETS TO BE WHITE MELAMINE/POLYESTER OR CENTERED AT +18" A.F.F., U.O.N. �
<br /> EXISTING FLOOR COVERING AND PREPARE SUBSTRATE FOR NEW FLOOR COVERING ' APPROVED EQUAL, UNLESS OTH€RWISE SPECIFIED. CHANGE ORDERS �
<br /> PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND 10. CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME
<br /> PER SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS. SPACKLED. ALL JOINTS MUST BE TAPED AND COVERED WITH JOINT COMPOUND. 7. ALL TELEPHONE AND DATA CABLE TO BE TEFLON COATED PLENUM RATED CABLE, � � cn
<br /> THROAT THICKNESS FOR EACH LOCATION. 1. A COMP�ETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED �
<br /> 9. ALL OPEN CABINETS OR SHELVES TO HAVE PLASTIC LAMINATE TO MATCH SUPPORTED INDEPENDENTLY FROM SUSPENDED CEILING SYSTEM. CABLING TO BE W
<br /> JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TQ TO THE OWNER AND ARCHITECT PRIOR TO THE START OF ANY WORK. _ ¢ �
<br /> 24. AT ABANDONED PENETRATIONS OF FIRE RATED WALLS, CEILING OR FLOOR RECEIVING NEW PAINT FINISH APPLICATION. EXTERIORS. SUPPLIED BY TENANT; ALL PULLS AND TERMINATIONS BY GENERAL CONTRACTOR. 11. A�L DOOR FRAMES TO BE FACTORY FINfSHED, U.O.N.. o �
<br /> CONSTRUCTION, COMPLETELY SEAL VOIDS WITH FIRE RATED MATERIAL TO FULL w
<br /> THICKNESS OF THE PENETRATED ELEMENT. ALL PATCHWG OF EXISTING WORK TO 32. PRIOR TO PAINTING OVER WALL COVERING, SECURELY GLUE DOWN ANY LIFTING OR 10. NO 3/4" THICK SHELF SHALL SPAN LONGER THAN 32" WITHOUT SUPPORT. 8. LOCATIONS OF FURNITURE POWER FEEDS SHALL ACCOMMODATE CIRCUITS AND z �
<br /> 12. ALL WALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. 2. ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE Q
<br /> REMAIN SHALL MATCH FINISH PER SCHEDULE OR WHERE UNSCHEDULED TO BUCKLING AND HIDE ALL SEAMING OR BUMPS. WIRE PER ELECTRICAL DRAWINGS. TENANT SHALL BE RESPONSIBLE FOR ��
<br /> MATCH EXISTING FINISHES TO REMAIN, AND SHALL MEET OR EXCEED FIRE RATING 11. ALL SHELVING TO BE ADJUSTABLE UNLESS OTHERWISE SPECIFIED. PROVID{NG FURNITURE POWER FEED, GENERAL CONTRACTOR SHALL INSTALL THE OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER, zo
<br /> INDICATED ON FLOOR PLAN AND AS REQUIRED BY THE FIRE/LIFE SAFETY 33. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF POWER FEED. 13. MAXIMUM UN�DERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT Q
<br /> INSPECTOR. 12. ALL FILE PEDESTALS ARE TO BE CONFIGUREQ FOR "FRONT TO BACK" FILING AND EXCEED 1/2 ASOVE FINISH FLOOR SURFACE. ,�,
<br /> SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH cn
<br /> BE ABLE TO ACCEPT METAL HANGERS TO ACCEPT PENDAFLEX TYPE FILE 9. WHERE DEDICATED ELECTRICAL OUTLETS ARE NOTED WITHIN THE FURNITURE 3. CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE �
<br /> TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABI�ITY. VERIFY ALL PANEL SYSTEM, THE PANEL SYSTEM SHALL ACCOMMODATE THIS REQUIREMENT. 14. CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR IF ALONG WITH TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE. �,
<br /> 25. COORDINATE EXISTING SPRINKLER LWE AND HEAD LOCATION WITH NEW PLAN. WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. FOLDERS, UNLESS NOTED AS LATERAL NOT ABLE TO REFINISH TO "AS NEW" CONDITION. °'
<br /> SUBMIT SPRINKLER SHOP DRAWINGS TO ARCHITECT FOR REVIEW WITH THE CITY 4. A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY �
<br /> FIRE DEPARTMENT. 34. PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND 13. ALL COUNTER TOPS TO BE 24" DEEP, UNLESS OTHERWISE SPECIFIED. WHERE NO 10. FLOOR OUTLETS ARE ACCEPTABLE NEXT TO SLIDING PANELS/WALLS AND OTHER 15. ALL DOORS TO BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER � w
<br /> CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. BACKSPLASH IS SPECIFIED, COUNTER TOPS TO BE SCRIBED TIGHTLY TO BACK & SPECIA� CONVENIENT 10CATIONS. J � o
<br /> 26. CONTRACTOR lS RESPONSIBLE FOR BUILDING SECURITY DURING DEMOLITION KNOWLEDGE OR EFFORT. REQUEST. J O
<br /> SIDE WALLS. Q
<br /> PHASE. PROTECT ALL OPENINGS FROM WEATHER CONDITIONS AND SECURE THEM 35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE WALLS MUST BE 11. WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK, � ,
<br /> TO PREVENT VANDALISM. PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND 14. ALL BACKSPLASHES TO BE SCRIBED TO WALLS, AND MUST BE FLUSH TO EDGE LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. 16. ALL DOORS WITH ELECTRONIC SECURITY DOOR LOCKS MUST BE OPENABLE FOR z
<br /> EXITING PURPOSES UNDER ALL CONDITIONS. INCLUDING A POWER OUTAGE. J
<br /> ALIGNED, S0, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW OF BASE, UNLESS OTHERWISE SPECIFIED. ALL COUNTER TRANSITION SEAMS MUST PROJECT SCHEDULE Q
<br /> 27. DO NOT PERFORM ANY WORK THAT WILL VOID WARRANIIES OF EXISTING AND NAIL HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE TAPED AND BE CAULKED SEALED, VERIFY EITHER MATCHING COLOR CAULK OR CLEAR 12. CUT-OUTS FOR SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET 17. IF I I T 1. A COMPLETE CONSTR CTI N H F P ao <C �
<br /> SIUCONE. BU LD NG S ANDARDS ARE INCONSISTENT FOR DOORS, RELITES, HARDWARE, U 0 SC EDULE 0 ALL ORTIONS OF THE WORK TO BE
<br /> WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS WITHOUT PRIOR COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED ARE TO BE SANDED CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, � � � ..
<br /> APPROVAL FROM THE OWNER. U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHAL� BE LOCATED PER DOOR AND RELITE FRAMES OR OTHER STANDARD DETAILS, THEN CONTRACTOR PROVIDED TO THE OWNER AND ARCHITECT PRIOR TO START OF ANY WORK. o � o
<br /> SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING MORTAR c�
<br /> ELEVATIONS OF THE MILLWORK ITEM IN QUESTION. MUST VERIFY WITH DESIGNER AND OWNER PRIOR TO CONSTRUCTION. �
<br /> BED/BOND COAT AND WALL TILES. 15. PROVIDE SIDE SPLASHES AT LOCATIONS ADJACENT TO WALLS OR WINDOWS ¢ > �
<br /> 28. ARCHITECT ASSUMES NO RESPONSIBILITY RELATING TO ANY TOXIC MATERIALS, ESPECIALLY FOR SINKS U.O.N. � � z � Q
<br /> 2. THE SCHEDULE SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT
<br /> INCLUDING ASBESTOS, AND ASSUMES NO RESPONSIBILITY TO ITS EXISTENCE OR 13. A�L WALL COVER PLATES SHALL BE WHITE, UNLESS BUILDING STANDARD IS w W
<br /> � 36. ALL WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO D O C U M E N T S. � � � �
<br /> � R E M O V A L. T H E O W N E R W I L L T A K E A C T I O N F O R D I R E C T L Y C O N T R A C T I N G W I T H A ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE 16. FACES OF PIGEONHOLES TO MATCH WORK SURFACE LAMINATE. COLOR OF EDGE D I F F E R E N T, M A T C H B U l L D I N� S T A N D A R D. � (� � o o �
<br /> ,� CONSULTANT OR SPECIALIST, LICENSED BY THE STATE, FOR SUCH SERVICES SPECIFIED FOR WALL INSTALLATION WITH A FLUSH FRONT FACE. BANDING ON ALL DOORS TO MATCH FACE MATERIAL. LAZ I N G N OT E S ,l Q o o �
<br /> o S H O U L D T H O S E S E R V I C E S B E R E Q U I R E D O N T H E P R O J E C T. 1 4. A L L S E P A R A T E C I R C U I T R E C E P T A C L E S T O B E O R A N G E C O L O R W I T H B U I L D I N G o �
<br /> Q 3. THE SCHEDULE SHALL BE REVISED AT APPROPRIATE INTERVALS AS REQUIRED BY W Q Q w �
<br /> � 37. ALL TRANSLUCENT G�ASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE 17. SEE SPECIFICATIONS/PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. STANDARD COLOR COVER PLATE f- � � -� � �-
<br /> � 29. IF TH E EXISTIN G BUI LDING CON ST R UCTI O N I S C L A S S I F I E D S U C H T H A T THE CONDITIONS OF THE WORK AND PROJECT AND THE CONTRACTOR SHALL = � o o z
<br /> `-�' B Y B A C K B U T T E R I N G T I L E S A N D T R O W E L R I D G E S F L A T T E N E D P R I O R T O S E T T I N GN O T I F Y T H E O W N E R A N D A R C H I T E C T I F F O R A N Y R E A S O N T H E SCHED ULE IS � w z z o �
<br /> � FIREPROOFING INSULATION IS PRESENT, THEN THE CONTRACTOR, PRIOR TO 18. COUNTERTOPS SHALL HAVE A NOSING OF COUNTERTOP MATERIAL AT LEAST 3" 15. POWER/SIGNAL AND REFLECTED CEILING PLANS ARE FOR THE GENERAL � � Q Q ,� �
<br /> TRANSLUCENT GLASS TILES. 1. EACH LIGHT SHALL BEAR THE MANUFACTURER'S LABEL DESIGNATING THE TYPE EXTENDED,
<br /> � STARTING ANY WORK, SHALL VERIFY THE CURRENT FIRE-RESISTANCE RATING(S) DEEP, WHEREBY THE COUNTER MATER(AL EXTENDS INTO THE INSIDE OF THE INFORMATION OF THE CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. AND THICKNESS OF THE GLASS. o � z z w o �
<br /> OF THE EXISTING BUILDING ELEMENT(S). IF THE EXISTING FIREPROOFING 38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, CABINET, I.E. OVER THE DOOR WHEN PRESENT .
<br /> i ( ) 4. A THREE WEEK LOOK-AHEAD SHALL BE REVIEWED REGULARLY AT EACH AOC " � z z � �
<br /> � INSULATtON IS DAMAGED AFFECTED DURING THE COURSE OF THE WORK, AS 1 6. T E N A N T T O P R O V I D E A N D I N S T A L L T H E T E L E P H O N E A N D D A T A C O M M U N I C A T I O N o �n w w � '-'
<br /> o � HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH 2. GLASS SHALL BE FIRMLY SUPPORTED ON ALL FOUR EDGES. MEETING WHICH WILL BE IN-LINE WITH THE OVERALL CONSTRUCTION SCHEDULE. z oo � i-- _ c�
<br /> � DEFINED BY THIS PROJECT SCOPE, THEN THE CONTRACTOR SHALL PATCH/REPAIR WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS 19. END PANELS AND FRONT EDGES OF EDGE PANELS WHICH ARE PROUD OF THE C A B L I N G. C O N T R A C T O R T O C O O R D I N A T E S C H E D U L I N G A N D O T H E R R E Q U I R E M E N T S ¢ ,
<br /> � WI TH TEN AN T. r Q, a, a, Q, a,
<br /> � THE FIREPROOFING INSULATION TO A CONDITION THAT SHALL MATCH OR EXCEED SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND INTERIOR CABINET SHALL BE FACED TO MATCH DOOR FRONTS. 3. FIELD MEASURE ALL OPENINGS PRIOR TO FABRICATION. �
<br /> � THE ORIGINAL FIRE-RESISTANCE RATING(S) OF THE EXISTING BUILDWG UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. � W o 0 0 0 0
<br /> � 17. ALL/ANY CORE DRILL LOCATIONS SHALL BE VERIFIED WITH DESIGNER PRIOR TO � c� N N c� c•i
<br /> �, ELEMENT(S). 20. ALL HINGED DOORS TO HAVE CLEAR SILENCERS TOP AND BOTTOM ON DOOR (NOT 4. FIXED OR OPERABLE GLAZING IN HAZARDOUS LOCATIONS AS DEFINED IN THE p Q � � o � �
<br /> .T' 39. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER CABINET). D R I L L I N G. A L L U N U S E D C O R E D R I L L S S H A L L B E P L U G G E D A N D C A P P E D A S BUILDING CODE SHALL BE TEMPERED GLASS (SAFETY GLASS). D E S I G N B U I L D N O T E S °- � N N N N �
<br /> ;' 30. CONTRACTOR TO RELOCATE AND REUSE EXISTING DOORS AND HARDWARE WHERE CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT R E Q U I R E D T O M A I N T A I N F L O O R F I R E R A T I N G. o 0 0 0 0
<br /> � POSSIBLE. OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. 21. ALL DRAWERS GLIDES SHALL HAVE SILENCERS BUILT INTO THE GLIDE AND NOT 5 GLAZING IN SWINGING, SLIDING AND BIFOLD DOORS SHALL BE TEMPERED. �
<br /> � 18. ALL TELEPHONE AND COMPUTER WIRES SHALL BE PULLED BY TENANT
<br /> INSTALLED ON THE DRAWER OR DRAWER FRONT. ,�,
<br /> i 31. EXISTING DOORS TO REMAIN U.O.N. 40. CONTROL JOINTS AT GYPSUM BOARD ASSEMBLIES: THE MAXIMUM RECOMMENDED CONTRACTOR U.O.N. ELECTRICAL CONTRACTOR SHALL PROVIDE PULL WIRES AND 6. GLAZING ADJACENT TO DOORS: ALL GLAZING WITHIN A 24" ARC OF EITHER EDGE Q
<br /> � BOXES AT EACH LOCATION. OF A DOOR AND WITHIN 60" OF THE FLOOR SHALL BE TEMPERED. 1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES cn
<br /> �, CONTROL JOINT SPACING FOR WALLS AND CEILINGS WITHOUT PERIMETER RELIEF IS 22, ALL DRAWER GLIDES SHALL BE FU�L EXTENSION.
<br /> � 32. ALTERNATE CONSTRUCTION WASTE DISPOSAL-RECYCLING OF ACOUSTICAL TtLES 30 LINEAR FEET OR 900 SQUARE FEET OF SURFACE AREA, WITH PERIMETER Z PA/PM: C. KANG
<br /> / RELIEF IS 50 LINEAR FEET OR 2,500 SQUARE FEET OF SURFACE AREA. EXTERIOR 19. CONTRACTOR SHALL OBTAIN APPROVAL FROM ARCHITECT FOR ALL THERMOSTAT SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. o �
<br /> A 23. ALL HINGES SHALL OPEN t105', EXCEPT WHERE CABINETS ARE ADJACENT TO THE E_
<br /> JOINT SPACING IS RECOMMENDED AT 30 LINEAR FEET OR 900 SQUARE FEET OF LOCATIONS. 7. GLAZING IN WINDOWS: ALL GLAZING THAT MEETS ALL OF THE FOLLOWING Q
<br /> i A. CEILING MATERIAL BEING RECLAIMED MUST BE KEPT DRY AND FREE FROM DEBRIS. WALLS. PROVIDE HINGES WHICH LIMIT THE DOOR SWING TO KEEP THE DOOR PULL CONDITIONS SHALL BE TEMPERED: 2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO c� DRAWN BY: R.F.
<br /> ; B. BEFORE DISPOSING OF CEILINGS, CONTACT THE ARMSTRONG RECYCLING CENTER SURFACE AREA. FROM DAMAGING THE WALL. 7.1. THE EXPOSED AREA OF AN INDIVIDUAL PANE IS GREATER THAN 9 SF. INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN. ``
<br /> `j AT 877-276-7876, SELECT OPTION #4 TO TALK TO A CONSULTANT. THEY WILL 7.2. THE BOTTOM EDGE IS LESS THAN 18" ABOVE THE FLOOR. SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE w JOB NO.: SEA18-6190-01 ••
<br /> � VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MEETS THE ARMSTRONG 41. CONSTRUCTION JOINTS (EXPANSION JOINTS) AT GYPSUM BOARD ASSEMBLIES: 7.3. THE TOP EDGE IS GREATER THAN 36" ABOVE THE FLOOR. ONLY. N
<br /> $ REQUIREMENTS FOR RECYCLING. CONSULTANT WILL PROVIDE ASSISTANCE TO CONSTRUCTION JOINTS ARE REQUIRED AT CONTINUOUS GYPSUM BOARD SURFACES
<br /> / 7.4. WALKING SURFACE IS WITHIN 36". 3. CONIRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED Q
<br /> � FACILITATE THE RECYCLING OF CEILING MATERIAL. WITH DISSIMILAR WALL STRUCTURE. z SHEET
<br /> r '
<br /> � 8. A�L GLASS SHALL COMPLY WITH THE REQUIREMENTS OF STATE AND LOCAL LIGHT FIXTURES. �
<br /> � CODES AND THE U.S. PRODUCT SAFETY COMMISSIONS: SAFETY STANDARDS FOR z m
<br /> a ARCHITECTURAL GLAZING MATERIALS. 4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH � o
<br /> o CONFORMS TO THE OWNER�S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE o a
<br /> � 9. WHERE JOINTS ARE REQUIRED IN MULTIPLE LITE SITUATIONS, SILICON IS TO BE RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF w ■ �
<br /> r
<br /> j PROVIDED U.O.N. ROOF-MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION. W �
<br /> , � _
<br /> 0
<br /> �
<br />
|