My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 7TH FLOOR 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
1321
>
7TH FLOOR
>
1321 COLBY AVE 7TH FLOOR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 10:24:30 AM
Creation date
1/14/2021 11:48:13 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
7TH FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> tJr .1 <br /> < r . <br /> STATE Of WASHINGTON /0 / ff� <br /> DEPARTMENT OF HEALTH <br /> Ohmpia, KLAinjfen f1504-'152 D <br /> 7.936 <br /> June 4, 1996 CITY OF <br /> Mel Pyne, Administrator ,Is <br /> _�,�_ tlo, 0'TT <br /> Providence General Medical Center <br /> 1321 Colby Ave <br /> Everett, Washington 98201 <br /> RE: Providence General Medical Center <br /> Colby Campus <br /> Oncology Unit Relocation <br /> CRS /96-4612-001 <br /> Dear Mr. Pyne• <br /> 1 received from P Irsch, Nash & Hall the overview, a letter dated May 14, 1996, and <br /> construction drawings on April 14, 1996, and a clarifying letter on May 29, 1996. Staff has <br /> completed a review of these documents and found them acceptable. <br /> The staffs review is pursuant to chapter 246-318 WAC Hospitals Codified Rules, Regulations <br /> and Standards adopted by the department as amended to date. <br /> Local building officials are responsible for review and approval of structural design; state <br /> energy code chapter 51-11 WAC; indoor air quality chapter 51-13 WAC; and barrier-free <br /> accessibility chapter 51-20 WAC. Conformance with state electrical standards shall be <br /> determined by the State Department of Labor and Industries, or local authority with jurisdiction. <br /> I am issuing approval to begin this phase of construction. I am awaiting fire alarm rystem <br /> documents and fire sprinkler system documents. You may submit these documents separately <br /> for review and approval. <br /> I am returning a set of stamped "Approved" construction drawings and letters for your use at <br /> the job site. Final approval is subject to applicable codes and field inspections. These <br /> documents shall remain on file and available, in good condition, for inspection at the job site <br /> until the project is completed. I recommend these documents become a permanent part of the <br /> facility records. <br /> I have enclosed a notification card. Please complete and return the grin card when cc Istruction <br /> begins <br /> a <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.