Laserfiche WebLink
Zimmer Guisu/Fmui Psrtnenhip <br /> JOB NO: 80467.08 8/28/2002 <br /> JOB NAME: PEMC COLBY CAMPUS PAGE 1 <br /> RELEASE NO: 3 REVIEW COMMENTS AND MECHANICAL COORDINATION <br /> Dot'No Rev.No Qa1e Document Mkt <br /> ARCHITECTURAL <br /> A23B 4 8/28/2002 AREA 3B-FLOOR PLAN <br /> A2.3C 6 8/28/2002 AREA 3C-FLOOR PLAN <br /> A8.02 7 8/28/2002 INTERIOR DETAILS <br /> MECHANICAL <br /> MO.1 1 8/28/2002 LEGEND,WSEC COMPLIANCE,GENERAL NOTES AND DRAWING <br /> INDEX <br /> MO.3 1 8/28/2002 HVAC SCHEDULES <br /> MO.4 1 8/28/2002 AIR BALANCE SCHEDULES 1 <br /> M1.2B 1 8/28/2002 WING 2B-PARTIAL SECOND FLOOR PLAN-PLUMBING AND PIPING <br /> DEMOLITION <br /> M1.2BE 1 8/28/2002 WING 2BE-PARTIAL SECOND FLOOR PLAN-PLUMBING AND <br /> PIPING DEMOLITION <br /> M1.3B 1 8/28/2002 WIN:;3B-PARTIAL THIRD FLOOR PLAN-PLUMBING AND PIPING <br /> DEMOLITION <br /> M13BE 1 8/28/2002 WING 3BE-PARTIAL THIRD FLOOR PLAN-PLUMBING AND PIPING <br /> DEMOLITION <br /> M2.3BE 1 8/28/2002 WING 3BE-PARTIAL THIRD FLOOR PLAN-HVAC DEMOLITION <br /> M3.2C 1 8/28/2002 WING 2C-PARTIAL SECOND FLOOR PLAN-PLUMBING AND PIPING <br /> M3.3B 1 8/28/2002 WING 3B-PARTIAL THIRD FLOOR PLAN-PLUMBING AND PIPING <br /> M3.3BE 1 8/28/2002 WIND 3BE-PARTIAL THIRD FLOOR V \N-PLUMGING AND PIPING <br /> M33C 1 8/28/2002 WING 3C-PARTIAL THIRD FLOOR PLAN-PLUMBING AND PIPING <br /> M43B 1 8/28/2002 WING 3B-PARTIAL THIRD FLOOR PLAN-HVAC <br /> M4.3BE 1 8/28/2002 WING 3BE-PARTIAL THIRD FLOOR PLAN-HVAC <br /> M4.3C 1 8/28/2002 WING 3C-PARTIAL THIRD FLOOR PLAN-HVAC <br /> M6.2 1 8/28/2002 PLUMBING DETAILS <br /> fLECTRICA4 <br /> E6.0 1 8/28/2002 DETAILS <br /> ECCS 8/28/2002 Electrical Panel Schedule <br />