My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-------- <br /> i <br /> TO BE COMPLETED MY APPLICANT EVALUATION FOR <br /> AGENCY USN ONLY <br /> c. What general types of soils are found on the site (for example. clay, sand, gravel, peat, <br /> muck)? If you know the classification of agricultural soils. specify them and note any prime <br /> Farmland. clay, glacial till , topsoil. <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? if so. <br /> describe. No obvious ft'lications. <br /> e. Describe the purpose. type, and approximate quantities of any filling or grading pro- <br /> posed. Indicate source of fill. <br /> Excavation for foundations, parking and site access will be minimal. <br /> • Excavation spoils will he disposed of off-site. Some excavations <br /> will he used for on-site landscape and backfill if acceptable per <br /> standards. <br /> f. Could erosion occur as a result of clearing, construction. or use? If so. generally describe. <br /> Yes, during construction when excavating for parking and foundations. <br /> g. About what percent of the site will be covered with impervious surfaces after projecx <br /> • construction (for example, asphalt or buildings)? Approximately 18%. <br /> h. Proposed measures to reduce or control erasion, or other impacts to the earth, if any: <br /> • <br /> Standard construction techniques, silt fencing and/or straw bales <br /> per applicable codes. <br /> 2. Air <br /> a. What types of emissions to the air would result From the proposal (i.e., dust, automobile. <br /> odors. industrial wood smoke) during construction and when the project is completed? If <br /> any, generally describe and give approximate quantities if known. <br /> Automobile and Truck (diesel) odors. <br /> • <br /> Minimum of 3 cars per day, truck trips vary depending on number of <br /> response calls. <br /> • During construction, auto and equipment exhaust. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so. <br /> generally describe. <br /> None <br /> 1 . <br /> ic. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> . <br /> None <br /> • <br /> • <br /> • <br /> 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.