My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO BE COMPLETED AY APPUCANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> ' 9. Housing <br /> a. Approximately how many units would be provided, if any? Indicate whether high. mid- <br /> die, or low-income housing. 0 <br /> , b. Approximately how many units. if any, would be eliminated? Indicate whether high, <br /> middle. or low-income housing. 0 <br /> -c. c. Proposed measures to reduce or control housing impacts, if any: N/A <br /> . 10. Aesthetics <br /> a. What is the tallest height of any proposed structure(s), not including antennas; what is <br /> the principal exterior building material(s) proposed? <br /> ' 4 Approx. 20' max. height at peak of truck hays. Propose metal or , <br /> wood siding w/metal roof. <br /> b. What views in the immediate vicinity would be altered or obstructed? . <br /> ' None. <br /> f, c. Proposed measures to reduce-or control aesthetic impacts.. if any: <br /> Architectural detailing on building facade and landscaping. <br /> ' 1 l, Light and Gum <br /> a. What type of light or glare will the proposal produce? What time of day would it mainly <br /> • occur? 1{elf 1ect [Lin from soul igiat (ncgl igihlc - mature vegetation to <br /> retained at site perimeter. <br /> • <br /> b. Could light or glare from the finished project be a safety hazard or interfere with views? <br /> No. <br /> c. What existing off-site sources of light or glare may affect your proposal? <br /> No. <br /> • i d. Proposed measures to reduce or control light and glare imparts, if any: <br /> No. <br /> 1 <br /> ' I2.. Recreation <br /> a, What designated acid informal recreational opportunities are in the immediate vicinity? <br /> • <br /> • Project is located within a regional park (Thornton Sullivan) <br /> providing both passive and active facilities. . <br /> b. Would the proposed project displace any existing recreational uses? If so. describe. <br /> • <br /> • Project Is included in the master plan for park development. <br /> 8. ' <br /> • <br /> 1 ' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.