My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County PUD 1/4/2021
>
Contracts
>
Agreement
>
Purchase
>
Snohomish County PUD 1/4/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:21:33 PM
Creation date
1/20/2021 1:21:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County PUD
Approval Date
1/4/2021
Department
Purchasing
Department Project Manager
Ruben Sanchez
Subject / Project Title
Install 3-Phase Power Bank at Fire Admin Bldg
Tracking Number
0002735
Total Compensation
$30,394.84
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y g r <br /> # <br /> vwslrc unu nns N rr rerer a.t:. ,." ; y <br /> snopud.com <br /> Mail Remittance to:PO Box 1100 Everett,WA 98206 <br /> ATTN: Andrew Rife(425)783 8559 Everett El <br /> ACCOUNT# 2801 OAKES <br /> EVERETT FIRE DEPT. QUOTE <br /> 2801 OAKES AVE DATE EXPIRES <br /> EVERETT WA 98201 12/17/2020 3/17/2021 <br /> AMOUNT OF QUOTE <br /> Return this statement with cash or check payment $27,682.00 <br /> ACCOUNT If CONTRACT# QUOTE DATE EXPIRES CONNECT# PROPERTY <br /> . 12/17/2020 3/17/2021 2801 OAKES <br /> EVERETT FIRE DEPT. EVERETT WA 98201 <br /> New OH Work <br /> Notes: <br /> DESIGNER INFORMATION <br /> Andrew Rife(425)783 8559 Everett El <br /> WORK ORDER it SALES ORDER# DESCRIPTION QTY UNIT COST TOTAL <br /> 100072583 OVERTIME XFMR BANK HANG AND CUTOVER 1 27,682.00 <br /> Crew Labor 11,027.00 <br /> Materials/Coded Stock 6,815.00 <br /> Vehicle and Transportation 5,688.00 <br /> Engineering 688.00 <br /> Admin and General Overhead 3,464.00 <br /> Subtotal 27,682,00 <br /> Total 27,682.00 <br /> iramecnts set forth above were panQ For the PUD to permanency connect a new single-phase secondary sentte at the service address(es)iai tared,Otis is atsoa rer»pt for at hkerest h any costomerinstatied secoetdag service conductor,intended to be <br /> ma nta nedby the purl,beMren the PUob primary daanrbution system and the delivery point Onnerst,p Mies conductor is f!anslarred and conveyed to satisfy a ootfilon requked try the PU0's Lire Eateruoa Flegufaeons lorreceiving a ocfrio ubtdysernce. <br /> Providing quality water,power and service at a competitive price <br /> Toll-free in Western Washington at 1-877.783-1000,ext.8272 FAX(425)783-8650 www.snopud.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.