April 12, 2016 <br /> HWA Project No. 2016-P044-21 <br /> testing of potentially contaminated soils will be completed under a management reserve <br /> budget and not the primary approved budget. <br /> • Groundwater monitoring: Upon completion of each of the groundwater monitoring <br /> wells, HWA will install groundwater monitoring transducers to collect groundwater data <br /> for a period of at least 8 weeks. HWA assumes two site visits to download and collect <br /> the transducer data throughout the project. <br /> • Generate Boring Logs and Assign Laboratory Testing: HWA shall prepare summary <br /> boring logs and perform laboratory testing to evaluate relevant physical properties of the <br /> site soils. Laboratory testing will include moisture contents, grain-size distribution, and <br /> Atterberg Limits. All laboratory testing will be performed in general accordance with the <br /> corresponding ASTM procedures. <br /> • Develop Geologic Cross-Section: From the results of our slope reconnaissance and <br /> existing subsurface data, HWA will develop geologic profiles where appropriate. These <br /> preliminary profiles will show near surface soil conditions and will be provided in the <br /> preliminary geotechnical report. <br /> • Complete Preliminary Geotechnical Engineering Assessment: HWA will complete <br /> preliminary geotechnical analysis to asses the geotechnical conditions of the site and <br /> identify any geotechnical issues that will need to be addressed during design. This <br /> assessment will be conceptual in nature and will exclude any and all soil structure <br /> interaction analysis. <br /> • Preliminary Geotechnical Engineering Report: HWA will generate a preliminary <br /> geotechnical engineering report that will contain the results of the geotechnical <br /> engineering investigation, including description of surface and subsurface conditions; a <br /> site plan showing exploration locations and other pertinent features; summary boring <br /> logs; and laboratory test results. The report will provide a narrative and geotechnical <br /> recommendations for each of the above described geotechnical aspects of the project. <br /> • Project Coordination Meetings: HWA will attend up to one project coordination <br /> meeting at the City of Everett offices. This meeting will be meant to convey the <br /> geotechnical considerations of the site to the City and possible design team. <br /> • Final Design Geotechnical Engineering: HWA will complete geotechnical engineering <br /> analysis required to provide design recommendations for the project. These analysis will <br /> include slope stability analysis, settlement analysis, lateral earth pressure analysis, <br /> bearing capacity analysis,temporary shoring analysis and dewatering recommendations. <br /> HWA Scope <br />