Jansen Inc. 1/16/2021 Change Order 4
>
Contracts
>
Capital Contract
>
Franchise
>
Jansen Inc. 1/16/2021 Change Order 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:12 AM
Creation date
1/25/2021 10:30:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc.
Approval Date
1/16/2021
Council Approval Date
12/30/2020
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Downtown Streetscape Improvement
Public Works WO Number
PW3353, PW3640, UP3648
Amendment/Change Order
Change Order
Amendment/Change Order Number
4
Tracking Number
0001861
Total Compensation
$650,667.18
Contract Type
Capital Contract
Contract Subtype
Franchise
Retention Period
6 Years Then Destroy
Document Relationships
Jansen Inc 6/10/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Everett Downtown Streetscape Improvement <br /> Change Order No.4 <br /> Change Order Effective Date: December 9, 2020 <br /> Modified Bid Items <br /> Existing Bid Item # C-9—Flaggers. Modify existing bid item# C-9 entitled, "Flaggers" at the <br /> Contract Unit Price of$60.00/Hour, by adding 1,150 hours to the Contract, resulting in a Contract <br /> increase of$69,000.00. <br /> Existing Bid Item # C-26—Cement Concrete Pavement. Modify existing bid item# C-26 entitled, <br /> "Cement Concrete Pavement" at the Contract Unit Price of$124.00/SY, by adding 205 square yards to <br /> the Contract, resulting in a Contract increase of$25,420.00. <br /> Existing Bid Item #D-3—Gravel Borrow Including Haul. Modify existing bid item#D-3 entitled, <br /> "Gravel Borrow Including Haul" at the Contract Unit Price of$46.00/Ton, by adding 2,100 Tons to the <br /> Contract, resulting in a Contract increase of$96,600.00. <br /> Existing Bid Item #D-4—Roadway Excavation Including Haul. Modify existing bid Item#D-4 <br /> entitled, "Roadway Excavation Including Haul" at the Contract Unit Price of$55.00/Cubic Yard, by <br /> adding 1,092 Cubic Yards to the Contract, resulting in a Contract increase of$60,060.00 <br /> Existing Bid Item #D-5—Crushed Surfacing Base Course (CSBC). Modify existing bid item#D- <br /> 5 entitled, "Crushed Surfacing Base Course" at the Contract Unit Price of$38.00/Ton, by adding 2,100 <br /> Tons to the Contract, resulting in a Contract increase of$79,800.00. <br /> JUSTIFICATION: New Items: <br /> New Item #A-104—Install GFCI Receptacle Wiring for the Decorative Pedestrian Street Light <br /> Poles on Hoyt Avenue. The design drawings did not include wiring for the five (5) decorative street <br /> light GFCI outlet receptacles, so this new item is being added to account for costs to install wiring for <br /> the GFCI Receptacles for each light pole, as detailed in Work Change Directive #12. <br /> New Item # C-208—Install Video Detection System, Pacific Avenue and Rucker Avenue. The <br /> vehicle detection loops for the southbound through lane and left turn stop bars at Pacific Avenue and <br /> Rucker Avenue were destroyed by vandals overnight. To reinstall vehicle detection loops again would <br /> be too costly, as several concrete pavement panels would need to be removed and replaced in order to <br /> install loops again. This Flir TrafiSense 2 Video Detection is a much cheaper option, so this new item <br /> is being created to account for costs to install video detection at this intersection. <br /> New Item #C-209—Install New Lighting Conductors at Hewitt Avenue and Rucker Avenue. The <br /> signal system at Rucker Avenue and Hewitt Avenue did not have adequate existing lighting conductors <br /> for the NE and NW signal pole illumination, so this new item is being created to account for costs to <br /> install new lighting conductors. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.