My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc. 1/16/2021 Change Order 4
>
Contracts
>
Capital Contract
>
Franchise
>
Jansen Inc. 1/16/2021 Change Order 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:12 AM
Creation date
1/25/2021 10:30:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc.
Approval Date
1/16/2021
Council Approval Date
12/30/2020
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Downtown Streetscape Improvement
Public Works WO Number
PW3353, PW3640, UP3648
Amendment/Change Order
Change Order
Amendment/Change Order Number
4
Tracking Number
0001861
Total Compensation
$650,667.18
Contract Type
Capital Contract
Contract Subtype
Franchise
Retention Period
6 Years Then Destroy
Document Relationships
Jansen Inc 6/10/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order#4 Costs <br /> Bid Item or New Item Cost Cost By Schedule <br /> Schedule A Schedule C Schedule D Schedule E Schedule F <br /> A-104-GFCI Receptacles $8,456.00 $8,456.00 <br /> C-9-Flaggers $69,000.00 $69,000.00 <br /> C-26-Cement Concrete Pavement $25,420.00 $25,420.00 <br /> C-208-Install Video Protection System $12,150.00 $12,150.00 <br /> C-209-Lighting Conductors at Rucker&Hewitt $1,416.00 $1,416.00 <br /> C-210-Hydroblaster Roadway Preparation $16,500.00 $16,500.00 <br /> D-3 Gravel Borrow outside of Watermain area $96,600.00 $96,600.00 <br /> -4-Roadway Excavation outside of Watermain are $60,060.00 $60,060.00 <br /> D-5-CSBC-Outside of Watermain trench area $79,800.00 $79,800.00 <br /> )-10-Equitable Adjustment-Differing Site Condition $160,604.00 $160,604.00 <br /> -25-Equitable Adjustment in Watermain trench are $30,591.00 $30,591.00 <br /> E-26-Roadway Excavation Including Haul- <br /> Watermain trench area on Rucker $11,440.00 $11,440.00 <br /> E-27-CSBC in Watermain Trench area on Rucker $15,200.00 $15,200.00 <br /> E-28-Gravel Borrow in Watermain Trench area $18,400.00 $18,400.00 <br /> E-29-Water Meter Box $9,176.00 $9,176.00 <br /> E-30-Math Error Correction in Change Order#1 -$12,900.32 -$12,900.32 <br /> F-1-Covid-19 Project Costs $48,754.50 $48,754.50 <br /> TOTAL COST OF CHANGE ORDER#4 $650,667.18 $8,456.00 $124,486.00 $397,064.00 $71,906.68 $48,754.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.