Laserfiche WebLink
Change Order#4 Costs <br /> Bid Item or New Item Cost Cost By Schedule <br /> Schedule A Schedule C Schedule D Schedule E Schedule F <br /> A-104-GFCI Receptacles $8,456.00 $8,456.00 <br /> C-9-Flaggers $69,000.00 $69,000.00 <br /> C-26-Cement Concrete Pavement $25,420.00 $25,420.00 <br /> C-208-Install Video Protection System $12,150.00 $12,150.00 <br /> C-209-Lighting Conductors at Rucker&Hewitt $1,416.00 $1,416.00 <br /> C-210-Hydroblaster Roadway Preparation $16,500.00 $16,500.00 <br /> D-3 Gravel Borrow outside of Watermain area $96,600.00 $96,600.00 <br /> -4-Roadway Excavation outside of Watermain are $60,060.00 $60,060.00 <br /> D-5-CSBC-Outside of Watermain trench area $79,800.00 $79,800.00 <br /> )-10-Equitable Adjustment-Differing Site Condition $160,604.00 $160,604.00 <br /> -25-Equitable Adjustment in Watermain trench are $30,591.00 $30,591.00 <br /> E-26-Roadway Excavation Including Haul- <br /> Watermain trench area on Rucker $11,440.00 $11,440.00 <br /> E-27-CSBC in Watermain Trench area on Rucker $15,200.00 $15,200.00 <br /> E-28-Gravel Borrow in Watermain Trench area $18,400.00 $18,400.00 <br /> E-29-Water Meter Box $9,176.00 $9,176.00 <br /> E-30-Math Error Correction in Change Order#1 -$12,900.32 -$12,900.32 <br /> F-1-Covid-19 Project Costs $48,754.50 $48,754.50 <br /> TOTAL COST OF CHANGE ORDER#4 $650,667.18 $8,456.00 $124,486.00 $397,064.00 $71,906.68 $48,754.50 <br />