Interwest Construction Inc. 1/8/2021 Change Order 24
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/8/2021 Change Order 24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 11:27:22 AM
Creation date
1/25/2021 11:27:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/8/2021
Council Approval Date
1/6/2021
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Amendment/Change Order
Change Order
Amendment/Change Order Number
24
Tracking Number
0000801
Total Compensation
-$17,474.70
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 24 <br /> Change Order Effective Date: 11-13-2020 <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 3. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including,but <br /> not limited to, claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: A roved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> / '/'n David C.Hall,City Attorney <br /> - 2a <br /> Mayor City Clerk City Attorney <br /> I <br /> Date: ' **-21 Date: f P p-�- a0d1 Date: 4 7 Z <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> , i s t ik-- <br /> Date: /2,-1b-zo72 Die:J2-7'& zow Date: D te: t -Z1. 2020 <br /> Page 2 of 4 <br /> I <br />