My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Department 1/8/2021
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Military Department 1/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 1:29:24 PM
Creation date
1/25/2021 1:27:46 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Department
Approval Date
1/8/2021
Council Approval Date
12/30/2020
End Date
8/31/2021
Department
Facilities
Department Project Manager
Sarah LaVella
Subject / Project Title
Emergency Mgmt Peformance Grant E21-161
Tracking Number
0002754
Total Compensation
$61,321.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
under this Agreement, 2 CFR 200.313 for management of equipment, and 2 CFR 200.314 <br /> for management of supplies, to include, but not limited to: <br /> Upon successful completion of the terms of this Agreement, all equipment and <br /> supplies purchased through this Agreement will be owned by the Subrecipient, <br /> or a recognized non-federal entity to which the Subrecipient has made a <br /> subaward, for which a contract, Subrecipient grant agreement, or other means <br /> of legal transfer of ownership is in place. <br /> ii. All equipment, and supplies as applicable, purchased under this Agreement will <br /> be recorded and maintained in the Subrecipient's inventory system. <br /> iii. Inventory system records shall include: <br /> A. description of the property <br /> B. manufacturer's serial number, model number, or other identification <br /> number <br /> C. funding source for the equipment, including the Federal Award <br /> Identification Number(FAIN) <br /> D. Assistance Listings Number (formerly CFDA Number) <br /> E. who holds the title <br /> F. acquisition date <br /> G. cost of the equipment and the percentage of federal participation in the cost <br /> H. location, use, and condition of the equipment at the date the information <br /> was reported <br /> I. disposition data including the date of disposal and sale price of the <br /> property. <br /> iv. The Subrecipient shall take a physical inventory of the equipment, and supplies <br /> as applicable, and reconcile the results with the property records at least once <br /> every two years. Any differences between quantities determined by the physical <br /> inspection and those shown in the records shall be investigated by the <br /> Subrecipient to determine the cause of the difference. The Subrecipient shall, in <br /> connection with the inventory, verify the existence, current utilization, and <br /> continued need for the equipment. <br /> v. The Subrecipient shall be responsible for any and all operational and <br /> maintenance expenses and for the safe operation of their equipment and supplies <br /> including all questions of liability. The Subrecipient shall develop appropriate <br /> maintenance schedules and procedures to ensure the equipment, and supplies <br /> as applicable, are well maintained and kept in good operating condition. <br /> vi. The Subrecipient shall develop a control system to ensure adequate safeguards <br /> to prevent loss, damage, and theft of the property. Any loss, damage, or theft <br /> shall be investigated, and a report generated and sent to the Department's Key <br /> Personnel. <br /> vii. The Subrecipient must obtain and maintain all necessary certifications and <br /> licenses for the equipment. <br /> viii. If the Subrecipient is authorized or required to sell the property, proper sales <br /> procedures must be established and followed to ensure the highest possible <br /> return. For disposition, if upon termination or at the Grant Agreement End Date, <br /> when original or replacement supplies or equipment acquired under a federal <br /> award are no longer needed for the original project or program or for other <br /> activities currently or previously supported by a federal awarding agency, the <br /> Subrecipient must comply with the following procedures: <br /> DHS-FEMA-EMPG-FY20 Page 5 of 36 City of Everett OEM, E21-161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.