Laserfiche WebLink
Pr 0 OW <br /> PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $14,212.00 Service Order# <br /> Contact Person Nancy Josephson Telephone# 425-356-1259 <br /> Requested By Nancy Josephson Date of Request 5/13/14 <br /> Property Owner(name) Mukilteo School District <br /> Charge Cost to(name if different than owner) <br /> Address 8925 Airport Rd. City Everett Zip 98204 <br /> Installation Location 9600 Sharon Dr., Explorer Middle School <br /> Installation type/description/size/etc. Complete four inch DCDA installation. Does not <br /> include concrete restoration nor grass/sod in lawn area. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $7,441.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits 4,577.00 Gordon Witcher <br /> Matt Welborn <br /> Equipment Rental 1,950.00 Mike Ward <br /> Tax 244.00 Randy Allen <br /> Paul McKee <br /> Restoration <br /> TOTAL 14,212.00 <br /> Prepared by: 401r" <br /> Date Estimate Prepared 5/22/14 <br /> Accepted by: ,� , / ' l je ,___Representing tzti < �rp t <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> RECEIVED <br /> S:VECommon\clerical\Cost.est\20I4\9600 Sharon Dr.doc <br /> MAY 2 ° 2014 <br /> 1of1, <br /> MUKILTEO SCHOOL UiS1,nbI <br /> FACILITIES & CONSTRUCTION' <br />