My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2016-05-27
>
Address Records
>
SHARON DR
>
9600
>
MSD TEACHING AND LEARNING CENTER
>
9600 SHARON DR EXPLORER MIDDLE SCHOOL 2016-05-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 3:55:58 PM
Creation date
5/27/2016 10:52:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SHARON DR
Street Number
9600
Tenant Name
MSD TEACHING AND LEARNING CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> The type of sprinkler to be installed will be determined by the Building Official. It may <br /> be an NFPA 13, NFPA 13R, or NFPA 13D system depending upon several factors. <br /> Sprinkler installation shall not begin without an approved and stamped set of plans <br /> from the Engineering & Public Services Department. The Fire Department will also <br /> review the plans and shall field inspect the installation based only on approved plans <br /> that must be on site. Changes to plans must be approved by both the Engineering & <br /> Public Services and Fire Departments. <br /> Aboveground sprinkler piping shall be hydrostatically tested as established in NFPA <br /> Standard 13. Underground piping shall be hydrostatically tested and flushed as <br /> established in NFPA Standard 24 for private fire mains. (Below-ground piping must <br /> be installed by Washington State Patrol Licensed Underground Sprinkler line <br /> certified "U" installers. For further information, contact the State Fire Marshal's Office <br /> at (360) 596-3900 or contact the Everett Fire Department at (425) 257-8124.) All <br /> such tests shall be witnessed by a Fire Department inspector. Call (425) 257-8124 <br /> or (425) 257-8120 to make an appointment for inspection. <br /> Contractors' materials and test certificates shall be submitted to the Everett Fire <br /> Department prior to issuance of any Certificates of Occupancy. <br /> Call (425) 257-8124 for more information. <br /> 12. The Snohomish County Emergency Radio System is employed by the City of Everett <br /> Fire Department emergency crews and operates at 800 MHz. Large metal-framed or <br /> metal and concrete buildings can weaken the signal so that communication and, <br /> therefore, firefighter safety is compromised. This structure must meet the <br /> requirements of EMC 16.03, Section 510, which specifically addresses required radio <br /> system performance standards in this structure. Your attention to this feature early <br /> in the planning stages will help avoid a costly, last-minute retroactive installation of <br /> radio signal amplification antennae and other equipment. For details, call the Everett <br /> Fire Department Plan Reviewer at (425) 257-8124. <br /> 13. Construction and demolition of buildings shall be in compliance with the provisions of <br /> the 2012 IFC, Chapter 33. <br /> 14. Floors and sub-floors at or above grade in buildings (other than parking garages) <br /> shall be marked with numbers, in ascending order, beginning with the number"1" (for <br /> the ground floor or first floor), then "2", "3", etc. Letters shall be used only to <br /> designate specific areas as detailed below. <br /> Floors below grade in buildings (other than parking garages) shall be marked with <br /> the letter"B" (when there is only one floor below grade). When there is more than <br /> one floor below grade, they shall be marked with the letter"B"followed by numbers, <br /> in descending order, beginning with the number"1" (for the floor immediately below <br /> the ground floor or first floor), then "2", "3", etc. Example —"B1", "B2", "B3", in <br /> descending order. <br /> Mezzanines shall be marked with the letter"M". When there is more than one <br /> mezzanine, they shall be marked with the letter"M" followed by numbers, in <br /> ascending order. Example—"Ml", "M2", etc. <br /> 6 l � / <br />
The URL can be used to link to this page
Your browser does not support the video tag.