Laserfiche WebLink
MR #2 Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updated during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> The proposed project will resurface existing paved areas and preparing the lot for van <br /> staging and parking. An additional entrance to the site will be added as well as <br /> pedestrian sidewalks. Disturbed landscape areas will be relocated to the Southeast <br /> portion of the site. Utilities will be modified to accommodate the changes to the site. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> Surrounding areas will not be affected by the proposed construction activity. No net <br /> increase in impervious area and following existing drainage scheme and plan. <br /> Necessary BMPs will be put in place (inlet protection, silt fence, construction entrance, <br /> ect..) as well as utilizina existina stormwater BMPs such as the <br /> How upstream drainage areas may affect the site: <br /> Upstream drainage will not be affected. No net increase in impervious area and <br /> following existing drainage scheme and plan. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Downstream drainage will not be affected. No net increase in impervious area and no <br /> increase in rate or volume of stormwater discharge. Proposed drainage scheme will <br /> match the existing. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> NA <br /> Special requirements and provisions for working near or within critical areas: <br /> NA <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 7 <br />