Laserfiche WebLink
SOURCES: Portion of total amendment quantity (from line 11)that is: <br /> 12. Purchased from off-site sources 100 <br /> 13. Stockpiled soil and duff from on-site <br /> 14. Chipped and stockpiled woody material from on-site <br /> 15. Imported topsoil <br /> 16. CHECK: The total of lines 12 through 15 should total 100% 100 100% <br /> PLANTING BEDS <br /> 17. Area of landscaping and planting beds (from line 4 above) 794 ft2 <br /> a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br /> 18. MULCH QUANTITY NEEDED 7.4 yd3 <br /> SOURCES: Portion of total mulch quantity (from line 18)that is: <br /> 19. Purchased from off-site sources 100 <br /> 20. Chipped and stockpiled woody material from on-site <br /> 21. CHECK: The total of lines 19 and 20 should total 100% Checked. 100°%° <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 43 <br />